RISK ASSESSMENT (RA) Risk Assessment for Insulation work inside □ Civil □ Arch □ Elec □ Mech
the Confined Space □ Other: Insulation/ CS
SECL Discipline Manager SECL Safety Manager SECL Construction Manager
Name: Name: Name:
Reviewed by Analyzed by Approved by
Sign: Sign: Sign:
Date Date Date
Subcon Construction Manager Subcon Safety Manager Advance Polyolefins Industry Company (If required)
Name: Name: Name:
Agreed by Approved by Approved by
Sign: Sign: Sign:
Activity – Insulation work inside the confined
TYPE OF JOB BEING ANALYZED (WORK space
RA No. SESA-BFIM-RA-CS-001
DESCRIPTION) Equipment to be used – Hand Tools, Power Tools,
pick-up, Crane/ forklift/ Trailer / dyna truck
Death (5) 25 20 15 10 5
Major Injury (4) 20 16 12 8 4
1-4 LOW
Over 3 days injury (3) 15 12 9 6 3
5-10 MEDIUM
Minor injury (treatment off-site) (2) 10 8 6 4 2
Minor injury (first-aid on-site) (1) 5 4 3 2 1 12-25 HIGH
Page 1 / 13
INITIAL RISK RESIDUAL RISK
SIGNIFICANT HAZARDS ACTIONS/
SN JOB TASK RATING PREVENTIVE AND CONTROL MEASURES RATING
THOSE AT RISK QUERY ITEMS
L S R L S R
1.1.1 Site specific safety induction for all before
working at site Ongoing
1.1.2 NO PERMIT NO WORK monitoring &
1.1.3 Confined space Permit shall be obtain review field
including additional job task to be perform
observations.
inside the confined space
1.1.4 TBT specific to the CSE activity and job risk to be
1.1 Lack of knowledge analysis mitigated to
2 2 4 1 1 1
or understanding 1.1.5 Confirm the entry/work location, and ALARP
communicate
work intentions to appropriate personnel
1.1.6 Make a review by asking of what the
requirements and procedure to all workforce
is to ensure they understood the precautions
and methods to be followed
1.2.1 All personnel including supervisor, occupants, Ongoing
Pre-Task
1 attendant and gas tester must be trained to monitoring &
Briefing
their individual job skills and qualified to review field
1.2 Incompetent perform to their specific tasks.
2 2 4 1 2 2 observations.
person 1.2.2 Supervisor must ensure that all employees
risk to be
will undergo confined space training from the
client mitigated to
ALARP
1.3.1 Identify evacuation routes during site
assessment. Ongoing
1.3.2 Develop contingency and emergency rescue monitoring &
1.3 Lack of knowledge plans. Include the following in the rescue review field
plan:
in an emergency observations.
2 2 4 Procedures for reporting the emergencies. 1 2 2
response Emergency escape routes risk to be
procedure Required Recue equipment mitigated to
The designated emergency assembly area. ALARP
Rescue and first aid procedures, duties and
responsibilities.
Page 2 / 13
2.1.1 Verify the competency of the Gas Tester Ongoing
personnel and ensure must have a valid monitoring &
approved ID card of the authorized Gas review field
2.1 Gas Testing failure Tester.
2 1 2 1 1 1 observations.
2.1.2 Verify and confirm if the Gas Testing Device is
risk to be
calibrated and bump tested by certified 3rd
party. mitigated to
ALARP
2.2.1 Gas test shall perform initially at the opening
of the confined space. Ongoing
2 Gas Testing 2.2.2 Authorized gas tester must not going inside monitoring &
the confined space to perform the gas review field
2.2 In-correct Gas testing, instead use the long hose to test the
observations.
Testing in Confined air condition of all level of confined space.
2 1 2 2.2.3 Conduct gas testing for oxygen (O2), toxic 1 1 1 risk to be
Space mitigated to
substances, flammable gases and vapors and
record the results on the permit along with ALARP
the date, time and gas testers’ signature.
2.2.4 Continuously monitor the Confined Space
condition and Gas test for every 2 hours.
3 Inspection of 3.1 Improper ingress 2 2 4 3.1.1 Ensure proper access and egress shall be 1 2 2
the stability and egress provided in confined space. Ongoing
and safe 3.1.2 All access and egress shall be checked by monitoring &
condition of supervisor and safety before use. review field
working 3.1.3 Access and egress shall not be blocked or
observations.
environment obstructed at any time.
3.1.4 Access and egress shall free of any tripping risk to be
hazards mitigated to
ALARP
Page 3 / 13
1.2.1 Personnel where in an enclosed confined
space where vertical rescue may be required Ongoing
shall wear a full body harness monitoring &
1.2.2 Emergency equipment and rescue team shall review field
be available in the event of an emergency
observations.
requiring evacuation in the confined space.
3.2 Rescue equipment risk to be
3 4 12 1.2.3 Emergency contact number shall be 2 2 4
improperly in place communicated to all involved personnel and mitigated to
posted at entrance of confined ALARP
space.
1.2.4 Retrieval line shall be provided if working in
enclosed vertical confined space.
Page 4 / 13
3.5.1 Ensure the entry point are free (not
obstructed) and no sharp edges. Ongoing
3.5.2 Verify if the working platform are inspected monitoring &
by the competent person and ensure its review field
stability, secured and without any loose
3.5 Personal injuries – observations.
components.
due to unsecured 2 2 4 3.5.3 Pre-entry walk to be done by the SWP issuer, 1 1 1 risk to be
platform receiver mitigated to
3.5.4 and HSE area in-charge to ensure if the ALARP
condition is safe to work.
3.5.5 Review housekeeping and correct all
deficiencies.
4.3 Personnel/ 2 2 4 4.3.1 Ensure working platforms are secured and 1 2 2 Ongoing
Materials falling inspected. monitoring &
4.3.2 No storing of materials above inside confined review field
space, bring only materials that needed. observations.
4.3.3 Avoid materials stored near at edge above
risk to be
inside confined space.
4.3.4 Restrict personnel to stay underneath in mitigated to
working platform. ALARP
4.3.5 Full body harness and fall protection shall in
Page 6 / 13
place if could fall more than 1.8m.
4.4.1 Ensure all entry personnel must wear body Ongoing
harness. monitoring &
4.4.2 Hard copy of confined space rescue plan review field
4.4 Entrapment or procedure must be available at the working observations.
2 2 4 area. 1 2 2
collapse of entrants risk to be
4.4.3 Ensure retrieval / rescue equipment are
readily available and all access are free (No mitigated to
obstruction). ALARP
Page 7 / 13
risk to be
mitigated to
ALARP
4.9.1 Ensure that the task supervisor must closely Ongoing
monitor the entire activity and shall remain monitoring &
outside confined space. review field
4.9 Lack of supervision 2 2 4 1 2 2 observations.
risk to be
mitigated to
ALARP
4.9.2 Internal combustible engines shall not be
positioned inside confined space or at a Ongoing
location that could allow exhaust to enter the monitoring &
space. The equipment shall position down review field
wind.
4.10 Toxic fumes and observations.
2 2 4 4.9.3 Mechanical ventilation shall place in strategic 1 2 2
gases (CO/ CO2) position. risk to be
4.9.4 Ensure gas testing to be maintained. mitigated to
4.9.5 Job rotation to be implemented and ensure ALARP
break time to be given as per site instructions
and gas testing to be repeat prior to re-entry.
5 Insulation 5.1.1 Ensure all personnel involved are trained and Ongoing
Activity competent to perform the task. monitoring &
5.1.2 Verify all personnel involved if they are review field
completed all observations.
5.1 Incompetent person
2 2 4 5.1.3 relevant training required by SESA training 1 2 2 risk to be
Dept.
5.1.4 All personnel must have a valid and approved mitigated to
training card on his position. ALARP
Page 10 / 13
5.10.1 Loose clamps shall all put in specific clamp Ongoing
buckets monitoring &
5.10.2 Keep all tools closer to users’ body by using review field
tool lanyard observations.
5.10.3 Barricade work area and provide warning
risk to be
signs.
5.10.4 Never accumulate scaffolding material at mitigated to
height while erection. ALARP
5.10 Falling object 4 5 20 2 2 4
5.10.5 Ensure falling protection (crash deck)
provided to prevent falling materials during
lowering and rising scaffold materials.
5.10.6 No loose materials shall be kept on scaffold.
5.10.7 Ensure nobody exposed under line of fire.
5.10.8 Keep horizontal distance with lifting object in
case of accidental dropping.
Page 12 / 13
5.16.1 All nails in wood and timber shall be Ongoing
removed. monitoring &
5.16.2 All unused wood and timber must be properly review field
stored and de-nailed in a properly separated observations.
barricaded area, with adequate signs for
risk to be
5.16 Punctures 2 2 4 identification. 1 2 2
5.16.3 All workers shall wear minimum personal mitigated to
protective equipment required for the activity ALARP
(Abrasion leather gloves)
5.16.4 Adequate number of trash bins shall be
provided.
5.17.1 Work shall be stopped when supervisor Ongoing
assesses the situation to be dangerous for the monitoring &
life or health of workers. review field
5.17.2 Any lifting activity shall be stopped when the observations.
5.17 Poor visibility 2 24 wind speed is more than 9m/s or 32kn/h. 1 2 2
risk to be
5.17.3 Provide enough illumination inside the vessel
using LED or 24v lighting. mitigated to
ALARP
--END--