RISK ASSESSMENT

Initial Risk
Activity

(With existing Residual Risk


Job Steps Health and Safety Hazards Effect controls) Control Measures
Risk Risk
S P R S P R
Level Level
 Proper PPE should used all the working time
Tripping, fall in to excavation, Personnel (gloves, helmet, safety glasses, safety shoes).
Survey activities 3 3 9 M 3 2 6 L
hit by a vehicle injury  The entire surveyor should use a high-vis vest
during working time.
 Proper PPE should use all the working time (gloves,
Hand injuries, foot penetrated
Personnel helmet, safety glasses, and safety shoes).
Steel fixing by a steel bar, injured by fixing
injury
4 3 12 M 4 1 4 L
 Only skilled persons are allowed to work.
wire.
Steel Fixing

 High level of housekeeping should be implemented


 Care must be exercised by all personnel when
lifting loads greater in weight. Where possible the
Using incorrect techniques Personnel load should be shared between two people.
Manual Handling Overexertion injury
3 3 9 M 3 2 6 L
 Any load exceeding the physical capabilities of
personnel MUST be lifted with the aid of
mechanical equipment
 All tools to be inspected & colour coded
 "Care MUST be taken to ensure that all hand tools
Using the wrong tools. Personnel
Hand tools Tools not fit for purpose. injury
3 3 9 M used are in good condition and fit for purpose. 3 2 6 L
 No home-made hand tools are allowed on work
site"

Severity (S) Values: 1-5 Probability (P) Values: 1-5 Note: Use the RAM when determining the values of S and P
Risk (R) = S x P Risk Ranking: 1 – 6 = Low (L) 8 – 12 = Medium (M) 15 – 25: High (H) Page 1 of 1