Professional Documents
Culture Documents
Unmitigated
Mitigated Risk
Task Hazards Persons at Risk Risk Proposed Mitigation Measures
L S R L S R
Concreting Contact with Chemical Site Operatives 3 2 6 Suitable PPE to be worn by the workers – 1 2 2
safety helmet, safety boots, gloves
Materials safety data sheets (MSDS) required
for concrete, shutter oil and curing compound
and other hazardous materials
Task briefing and toolbox talks for handing of
chemicals
Proximity of clean water and eyewash station
Concreting Falling objects from Site operatives / 4 4 16 Do not lift loads over personnel 1 4 4
lifted loads plant / visitors
Trained Banks man to be in charge of all lifting
operations
Suitable PPE to be worn by the workers –
safety helmet, boots, gloves, high visibility
jacket / vest
Remove loose objects
Concreting Crush injury Site operatives 4 4 16 Trained banks man to be in charge of all lifting 1 4 4
Banks man operations
Suitable PPE to be worn by the workers –
safety helmet, boots, gloves, high visibility
jacket/vest
Safety toolbox for drivers & operators to be
given
Mall of Egypt
Concreting Work Risk Assessment JVBO NO:
Risk Assessment: Activity Date:
– Concreting Works Page: 2 of 2
Final cleaning of Skin burn – concrete Site operatives 4 3 12 Spillage to be collected into tank 2 2 4
tremie pipe & spillage
Full body to be covered and proper PPE
bucket
(rubber gloves & boots)
Night working Slips, trips and falls Operational team 3 3 9 Provide suitable standard of lighting 1 3 3
/ security team
Housekeeping Slips, trips, falls, sharp Operational team 3 3 9 Regular housekeeping to be established. All 2 3 6
objects (nails) nails to be removed from spent timer
assemblies.