Part 1: Job Description: Installation of New Dodo Gate Location: Dodo Gate of ZGP
JRA Date: 17-02-2010 JRA No./ Revision: 10-005 JRA Leader: Cameron Leehane Scribe: Abrar-ul-Hassan
Review Team: (e.g. Ops Review Team )M Ramzan, Muneer Ahmed, A Rasheed, Abrar-ul-Hassan, Manzoor Ahmed
List Associated Procedures/work instructions or Temporary WIs:
Hazard Check List (FRCP identified below must reference applicable FRCP Control Measures – refer to FRCP Handbooks)
Falls from Heights Access / Egress Confined Space √ Manual Handling √ Fatigue/Over Exertion √ Slips, Trips & Falls
√ Competence of
Falling Objects Collisions √Noise Illumination √Environmental
Personnel
Liquid/Gas Under Flaring/Hydrocarbon
Oil/Chemical Flammable Materials Moving Machinery Electricity
Pressure Release
Surface Mobile
Ignition Source Light Vehicles
Corrosive Substance √Chemical Exposure Naked Flames Equipment
(Sparks/Electrical) (FRCP)
(FRCP)
Hazardous Materials Equipment Other
Isolation Working at Heights Lifting Operations (please specify)
Management Safeguarding
(FRCP) (FRCP) (FRCP)
(FRCP) (FRCP)
Step
Hazard Hazard Effect Hazard Controls Controls Acceptable
Job Steps Use Checklist as a Injury/Damage or
No. Use Hierarchy of Controls/FRCP Control Measures Y/N
Guide to be Specific Environmental Effect
1 Mobilization of Un Injury to All workers shall be inducted from OPS & Yes
equipment and Inducted personnel & DEL HSE prior entry to work area
personals People Damage to
plant Workers fully fit to work & medically
( Mixer approved by BHPB shall enter only at job
Machine , site, Supervisor shall ensure each day
Hand tools only fit workers shall perform activity
Plant Worker
unaware for Workers shall be briefed regarding
emergency emergency response requirements,
/ Mustering access / muster
emergency access / egress, Muster Points
CONTROLLED DOCUMENT
Page 1 of 9
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
Un
inspected All equipment shall be inspected by Ops
Damage to prior use, vehicle entry certificate shall
equipment property /
& Hand be obtained
plant
tools Visual inspection shall be done at starting
of each shift
DEL E&P shall inspect vehicle each day &
checklists shall be maintained & recorded
All Hand tools shall be inspected prior
using at worksite, tagged & in good
condition
Visual inspection for hand tools shall be
done at start of each shift damage tools
to replaced immediately
Workers shall be briefed about inspection
requirements of Ops & Hand tools colour
coding , tagging requirement
2 Set out Wrong Damage to Mark area properly as per Drawing , only Yes
excavation Marking plant services approved drawing with identification of
location and ( Electrical / services shall be used , must be
mark with Mechanical) highlighted
chalk / lime
Dust
particles of Inhalation of Use of dust mask at all times during
lime dust particles marking activity
of lime Follow MSDS guidelines for use of Lime
All workers shall be briefed about acute
CONTROLLED DOCUMENT
Page 2 of 9
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
CONTROLLED DOCUMENT
Page 3 of 9
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
CONTROLLED DOCUMENT
Page 4 of 9
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
4 Concrete Use of Skin and eye Supervisor shall ensure workers are aware Yes
pouring & fixing Cement infection of MSDS of cement and its followed
Gate Posts
Use rubber gloves during cement handling
to eliminate chemical contact with body
& organs
Trips / falls
Improper
Ensure workers have proper access &
access /
accessing the right walk way.
egress
Manual Back Injury Use correct manual handling techniques,
Handling supervisor shall demonstrate right manual
handling techniques to workers prior
starting job
Supervisor to ensure workers are aware
of max load limit for each individual
which is 20 max
Work rotation / periodic rest & get
proper posture to avoid any strain for
easy & safe way to working.
CONTROLLED DOCUMENT
Page 5 of 9
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
CONTROLLED DOCUMENT
Page 6 of 9
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
Barbed Spike injury to All workers shall wear hand gloves at all
hands and times
CONTROLLED DOCUMENT
Page 7 of 9
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
wire fingers
7 Demobilisation Poor house trips & fall Permit recipient to ensure that area is left Yes
keeping clean and tidy
Alternatives Considered: What are the other possible means of achieving the job outcome?
Part 3: Contingency Plans: What rescue equipment, PPE etc could be needed if something went wrong? Reference Field ERP
Full time communication with CCR to be made in case of any emergency / muster (Secure the place and go to the designated operation muster
point.
CONTROLLED DOCUMENT
Page 8 of 9
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
CONTROLLED DOCUMENT
Page 9 of 9
PF03.02 Rev. 0