All Civil relevant activities for GPF-IV Integration with new Equipment front end Compression Project
Prepared By: Shamsheer Mushtaq
Distribution:
Reviewed By: Aijaz Ahmed
Vehicle / Equipment Injury / asset 3D Speed limits shall be followed inside facility. 1A
Route shall be defined & Communicated to operators/drivers.
Movement inside Damage
There Shall be no movement over existing flow Lines and cables
well head Material shall not extend out of vehicle's body or tail board.
Job Safety Analysis
Fuel & Oil Drips / Environmental Visual inspection shall be done to check any leakage.
Oil contaminated soil shall be removed & disposed of at designated
Leakages Issues
3C place. 1A
asset damage,
Proper compacted and leveled ground muse be choose for material
Improper ground equipment tilt 3D off loading/loading. 1B
condition
over
Direct eye to eye contact between crane operator and signal man
Signal man wear reflecting vest
Signal error Personal Injury 3D 1B
Lifting shall be done only day time, for night activity special lighting
need to arranged.
PPL/Gasco
Mechanical
Asset Damage Identify all utilities underground and mark them on ground.
Excavation & Underground Cables 3D 2B
Grading
Uninspected Asset Damage
3C Third party certification of all equipment. 1B
Equipment, JSA meeting and Tool Box Talk,
Equipment Failure
Vehicle / equipment’s / machinery shall be inspected and
Follow PTW
Certified operator will operate,
Job Safety Analysis
Compaction
Use ear plugs or muffs
Ill injury 3C 1A
High Noise Area
Inhalation
Use dust mask 1A
Dust 1B
problem
PPL/Gasco
Use Appropriate gloves and safety shoes
Personnel injury 1A
Sharp edges 1B Use appropriate PPEs
Asset damage Use skilled and trained personnel to carry out the job 1A
Unskilled Person 1B
Slight
Spill of concrete on environmental Use of sheet beneath the Mixture machine 1A
2B
ground
damage
Personnel injury Proper rigging/ only rigger is to direct the crane operation
Brief working procedure
Improper Rigging Asset loss Tool Talks before and in between whole job
3D
and lifting / signal Double tag line should be use during lifting operation 1B
error Rigging Plan to be made
Direct eye to contact between signal man and operator
Inhalation
Use dust mask
Dust
problem
3B 1B
Asset damage Use skilled and trained personnel to carry out the job
Unskilled Person 2B 1B
Slight
Spill of concrete on environmental Use of sheet beneath the Mixture machine
ground
1B 1A
damage
Backfilling /
Reinstatement of JSA meeting and Tool Box Talk
Improper backfilling Personnel injury 2B Proper backfilling in marked area 1B
area
Gasco
Slight
Use of sheet beneath the Mixture machine
Spill of grouting environmental
material on ground
2B Brief and explain MSDS of grouting material 1B
damage
Personnel injury,
Use ear proper PPEs.
Vibrator and High high exposure to
electrocution
2B Proper earthling and secured connection points. 1B
ears
Personnel injury,
Use ear plugs or muffs
Compactor and high exposure to
High noise area
2B All rotary parts shall be covered safely by safeguard 1B
ears