Job Safety Analysis

Job Safety Worksheet

Area of Work Considered: PROCUREMENT, CONSTRUCTION & PRE-COMMISSIONING


Job No: PPL-
WORKS FOR GAMBAT (GPF-IV) COMPRESSION PROJECT - Gasco/PPL - 010 Pre JSA Date: June 14,2022 GAM-22-SD-01
Shutdown Works Plan for ATA 2022

3. Jahangir Ahmed ( Mech


1. Aijaz Ahmed (HSE Advisor PPL ) 2. Hammad Zaidi (Site Engr PPL)
Superintendent)
JSA participants
4. Shamsheer Mushtaq (HSE Team
lead)

Job Location & details:

Erection and Dismantling of Scaffolding


Prepared By: Shamsheer Mushtaq
Distribution:
Reviewed By: Aijaz Ahmed

Type of Permit Required Additional PPE Requirements


Special tools or equipments required
(Please List)
Cold Work Permit  1. Dust Mask 
Hot Work Permit Category 2. Reflecting Vest
3. Full body harness 1. Standby Vehicle 
4. Gloves  2. Inspected Power/ Hand tools 
5. Safety Shoes  3. Lifting Gears /Equipment, Shackles, belts, Slings
6. Safety Helmet 4. Trailer/Mazda
7. Coverall 
Job Safety Analysis

Approved By: Signature: Date:

Report Number Incident Summary

Activity Assessment Form


Erection and Dismantling of Scaffolding
Residual
Task / Activity Risk Responsi
Hazard Hazard Effect Control Measures Risk
Description Rating bility
Rating

Vehicle Injury / asset  Work under PPL PTW system


/Equipment Failure Damage  Third Party Certified & Inspected Equipment Shall be used Gasco
3B  Spark Arrestors Shall be Installed on Exhaust 2A

Mobilization Of  Route shall be decided & communicated to all drivers & operators.
Equipment &
Material Incompetent Injury / asset Gasco
driver/Operators  Third Party Trained, Competent and Skilled Driver/operator.
Damage  Tool Box Talk Shall be conducted.
2B 1A
 JSA briefings & Hazards communication to personnel on job.

Vehicle / Injury / asset 2B  PPL Speed limits shall be followed inside facility. 1A
Equipment  Route shall be defined & Communicated to operators/drivers.
Movement inside Damage
 Driver to be conscious about Facility piping & structures.
Facility/Plant
 Material shall not extend out of vehicle's body or tail board.
 Ensure Reverse alarm installed on equipment and vehicles.
 Banks man shall be available with heavy vehicles
Job Safety Analysis

 Mobilization shall be done only in day time


 No Movement is permitted during night time until approved by PPL

Fuel & Oil Drips / Environmental


Leakages  Visual inspection shall be done to check any leakage.
Issues  Oil contaminated soil shall be removed & disposed of at designated place.
2C 1A
 Vehicle & equipment shall be check listed by Gasco

 JSA and tool box meeting prior to start the job


 Competent scaffolder’s to be used.
 Obtain work permit
 Scaffolding will be certified by Gasco trained Scaffolding supervisor before use
Slips, Trips and
and tagged
falls and Gasco 1B
Personal injury 2B  Proper access for ascending and descending
dismantling/
Improper access  Scaffolding shall be mandatory for heights above 6 feet, if scaffolding is not being
done than permit to work at height should be used
 Use doubles lanyard safety Harness while working at height.
 Visual inspection of lanyard before use at site.
Erection Of  No work shall be performed on incomplete platform.

Scaffolding
 Describe location’s hazards with workforce
Platform plant trip / Personal
Struck by live  Specially care to be taken nearby around live tubing & pipes
injury / asset
equipment /  Close supervision
damage
 Competent scaffolder / work force

 Foot board to be installed in scaffolding to avoid falling of tools/equipment


 Ensure no personnel movement under the scaffolding while working at height in
progress. Gasco 1B
Falling materials Personal Injury 2B
 Do not throw Scaffold material
 Scaffold key / tool to be tied with rope while working at height
 Area to be barricaded. Safety signs will be displayed
Job Safety Analysis

Gasco 1B
Personnel injury 2B  Use Appropriate PPEs as mentioned in PTW and JSA.
Improper PPEs

 Use full body harness when working at height


Person Fall from  Ensure three point contact.
height,  Ensure 100% tie-off.
 Use mandatory PPEs
 Barricade the drop zone
 Relevant Safety signage must be placed
 Frequent breaks will be allowed in case of hot weather conditions
 Adequate provision of drinking water and resting shelters must be provided
Work at Height Gasco 2B
Personal injury 4B  No work will be allowed in extreme weather.
Falling object,  Standby vehicle must be available
 Man riding bucket must be used for Safe working at height-if required
 Ensure use of full body harness and life line while using man riding bucket.
 Lifting gears must be 3rd party certified and fit for use.
 Crane must be inspected and fit for use.
 Securing of tools when working at height by tethering them
 Proper inspection of scaffolding
 Inspection tags on certified scaffolding tag

 Proper housekeeping shall in place.


Non degradable Environmental 2B Gasco
Housekeeping waste damage
 Proper disposal of waste as per standards of PPL 1B
 Waste muse be handed over to authorized / approved vendor.