GREAT WALL DRILLING COMPANY

JOB SAFETY ANALYSIS (JSA)

Country / Location: MLE Date


Description of Job Rig:
or Work Activity: Mast Inspection JSA #

Recommendations to Eliminate or Reduce


Work Sequence (Job Steps) Hazards or Potential Incidents
Hazards
1. Inform driller / fill out form F0721. Raise Slip or trip / climbing ladder Use PPE and fall protection. See RMS Ref
work permit above & safety precautions.
2. Check all pins have keepers. Personal injury, falling objects. Follow mast inspection procedures.

3. Make sure all loose objects in the Personal injury, struck by objects. Regular mast inspections.
derrick are removed.
4. Make sure all shackles have safety pins Falling objects. Follow mast inspection procedures.
or secured with wire.
5. Make sure all safety harnesses are Fall. Inspect before use.
worn correctly and in good condition.
6. Inspect harness derrick climber lanyard. Fall. Inspect before use.

7. Sign off work permit. Man could still be working above Follow work permit procedures.

8.

List Below the Personal Protective Equipment, Special Tools and Other Safety Equipment Required to do this Job
Safety body harness / safety glass / safety gloves, helmet & boots.

SIGN-OFF

JSA Written By: BAKDI MOHAMMEDAMINE JSA Approved By:

JSA Edited By: Safety Dept. JSA Authorized By: RIG Manager.

Original – Rig Files Copy – Area Office Copy – Beijing Office Page 1 of 1