长城钻井

JOB SAFETY ANALYSIS (JSA)

Country / Location: MZLN-11 Date 23/12/2012


Description of Job Rig: GW124
or Work Activity: Removing Rig Floor platform JSA #

Recommendations to Eliminate or
Work Sequence (Job Steps) Hazards or Potential Incidents
Reduce Hazards
1. Pre job safety meeting / rig move. Personal injury, procedures not Safety awareness prevents accidents and
understood injuries. Wear all PPE.
2. Inspect slings, shackles and hooks. Kinks, worn out or damaged tools. Make sure all tools and equipment are in
good condition.
3. Hook up floor plates one at a time to Pinch points. Never stand on or near floor plates when
the crane. being removed from rig.
4. Hoist plates one at a time with Fall, struck by objects. Never stand under suspended loads.
crane.
5. Make sure once the floor plates are Falls. Follow procedures wear PPE
removed all crew working in that
area wear be in good position
6.

7.

8.

List Below the Personal Protective Equipment, Special Tools and Other Safety Equipment Required to do this Job
Hand gloves, safety glass / helmet & , harness.

SIGN-OFF

JSA Written By: BAKDI MOHAMED AMINE . JSA Approved By:

Jsa Edited By: JSA Authorized By: Rig Manager.