Facility / Site: Zubair Oil Filed Location within Site: IDC-38 ZB-481 Permit No: Permit Type: CW Date: 02-3-2024

Task Description (include Equipment Numbers as Practical): Loading of ISo Containers by using Moble crane

REQUIRED REFERENCES JSA REVIEW


Have the relevant Procedures, Standards, Guidelines,
or Safe Work Practices been reviewed? Yes N/A Pending confirmation by the Task Leader of site conditions, I agree that the attached JSA identifies the
significant Task Steps, Hazards, and Controls.
Attach or List Procedures:
JSA REVIEWER (SUPERVISOR OR DESIGNATE) SIGNATURE:
RISK ASSESSMENT
Must existing Procedures or Work Practices be
Yes No NAME (PRINT): Rafid Mohassen Company: IBD
modified to perform this work? (MOC required)
After mitigation, are there any hazards that continue to WORK SITE VERIFICATION
present a potentially significant risk? (Scenario-Based Yes No
Risk Assessment required)
The Work Team has assessed the worksite conditions and confirms:
IF YES TO EITHER QUESTION ABOVE, ATTACH THE • The JSA addresses the applicable hazards and necessary controls.
MOC OR RISK ASSESSMENT BEFORE PROCEEDING
• The Team has the appropriate resources (people and equipment) to do the job safely.
PPE REQUIRED DURING THIS TASK
• Others that could be affected by the work have been informed.
(Summarize PPE fron the THA and/or Hazard Management Form)
• Energy isolation (if applicable) has been VERIFIED and DEMONSTRATED.
HARD HAT SAFETY GLASSES
FACE SHIELD TASK LEADER SIGNATURE:
SAFETY SHOES / BOOTS
GOGGLES

HEARING PROTECTION: GLOVES: NAME (PRINT): Rafid Mohassen Company: IBD


SINGLE COTTON
LEATHER COMPLETE THE SECTION BELOW IF THIS JSA IS NOT PART OF A PERMIT PACK
DOUBLE
(Sign on to the Permit Declaration if this JSA is associated with a Permit Pack)
IMPACT PROTECTION
RESPIRATOR TYPE OTHER (specify): Work Team Declaration:
(specify): I acknowledge that I have reviewed the attached JSA, I understand my roles
and responsibilities, and I will comply with the instructions for this task.
SCBA CHEMICAL (specify): Name (print): Name (print):
DUST MASK

FALL PROTECTION CHEMICAL SUIT


FALL RESTRAINT APRON

LIFE VEST FOUL WEATHER GEAR (specify):


WORK VEST

FLAME RESISTANT
CLOTHING

OTHER PPE (specify):

1 of 6
IBD-SLB JOB SAFETY ANALYSIS – TASK HAZARD ASSESSMENT FORM
This table of Hazards and Controls can assist the work group to manage hazards for the proposed work. The table does not include all possible hazards. It is expected
that the required PPE for the activity and work conditions will be used. Determine the Hazards that are present for the task and identify the Controls to be implemented.

Simultaneous
Pressurized Poor Lighting
Personnel Confined Space Operations Weather Ignition Sources
Equipment or visibility
(SIMOPS)

Perform isolation – LO/TO, Provide alternate lighting Provide induction or training Discuss confined space Follow SIMOPS matrix Implement controls for Remove, isolate, or contain
blinding, or defeat Wait or defer until visibility for new workers entry safe work practice MOC required for deviation slippery surfaces combustible materials
Depressurize, drain, purge, improves Mentor, coach, or supervise Conduct atmospheric testing from SIMOPS restrictions High winds – goggles Provide fire fighting equipment
and vent No work over water that Verify competencies, skills, Monitor access or entry Interface between groups Heat – hyrdration, breaks Construct a fire-safe habitat
Relieve trapped pressure could require rescue and experience Protect surfaces from Use barriers and signs to Cold – PPE, heaters Provide a fire watch during
Avoid auto-refrigeration (including sea state) Address applicable limitations inadvertent contact segregate activities and after hot work
Lightening – tool selection,
when depressurizing (fatigue, exhaustion, and Do not locate mobile engines Have permit counter signed defer work Conduct continous gas testing
Anticipate residual pressure restricted duty) near confined space by leader of affected groups Bond or earth for static
or fluids Manage multiple languages Provide observer electricity or cathodic protection
Secure temporary hoses Develop rescue plan

Hazardous Equipment Falling or Lifting


Potential Spills High Noise Work at Heights
Substance Hot or Cold Dropped Objects Equipment

Drain or purge equipment Drain equipment Heat or cool equipment Wear correct hearing PPE Use signs and barriers to Confirm lifting equipment Discuss working at heights safe
Follow MSDS controls Provide spill containment before work starts Manage exposure times resrict entry or access under condition and certification work practice
Implement health hazards equipment Install barriers Shutdown equipment work at elevation Obtain approval for lifts Verify fall restraint and arrest
controls (Lead, Asbestos, Have spill clean up materials Provide warning signs Use lifting equipment to raise over processing equipment certification
Use "quiet" tools
H2S, Iron Sulphide, and equipment on hand tools to or from the work equipment Apply abseiling safe work
Implement cold temperature Sound barriers or curtains
Sulfur Dioxide, NORM) platform Have a documented and practice
Restrain and isolate hoses and brittle failure controls Provide or use suitable
Test or analyze material when not in use Wear thermal gloves Secure tools (tie-off) approved lift plan
communication techniques

Portable Electrical Moving Objects Equipment Vibrating Slips, Trips,


Radiation Hazard Manual Handling
Equipment or Equipment and Tools Equipment and Falls

Inspect equipment for Use barriers and signs to Confirm machinery guard Assess manual handling task Inspect equipment and tools Manage exposure times Identify and shield uneven
condition and test date restrict access integrity Limit load size No use of modified tools Assess affect of vibration surface or projections
currency Notify personnel who may Provide protective barriers on equipment Secure or cover cables, cords,
Manage posture Use protective guards
Implement continuous gas be affected Observer to monitor proximity Confirm stability of load and Use correct tools and Use low vibration and tubing
testing Implement NORM controls of people and equipment equipment Clean up liquids
work platform equipment for task
Protect electrical leads from Conduct RAD testing Shut down or lockout Apply noise controls Barricade or rope-off openings
Get assistance or mechanical Protect or remove sharp
impact or damage equipment and holes
aid to avoid pinch points edges
Do not work in the line of fire Apply hand safety principles

High Energy or Waste Clean Up Other Energy Mobile Emergency


Excavations Other Hazards
High Voltage and Disposal Sources Equipment Response

Restrict access to authorized Have an excavation plan or Apply environmental Spring compression or Assess equipment condition Implement abrasive Keep egress route open
personnel only safe work practice management practices expansion control Implement controls on users blasting controls (for Keep shower and eye wash
Discharge equipment and Locate underground pipes Follow site waste Implement electromagnetic or access equipment and practices) stations accessible
make electrically dead or cables by hand digging management procedures (radio) controls Limit and monitor proximity to Prepare a dive plan Have a rescue plan in place
Observe safe work distances De-energize underground Clean up equipment and Manage pressure or vacuum live equipment or cables Manage potential blocked Keep emergency alarm, fire
for live cables services materials at site Manage heat generating Manage overhead hazards or plugged equipment equipment, and shutdown
Use flash burn PPE suit Implement confined space Optimize task to minimize processes Adhere to road and site rules MOC required for locations unobstructed
Use insulated gloves, tools, entry controls waste production Use seismic activity safe work temporary connections
and mats practice or modifications

2 of 6
JOB SAFETY ANALYSIS – HAZARD MANAGEMENT FORM
Task Description: Loading of ISo Containers by using Moble crane

Note: If the scope of work or the conditions change significantly, STOP THE JOB. Revise the JSA to address the hazards before proceeding.

Complete Task Steps / Potential Hazards / Hazard Controls PRIOR to the JSA Reviewer. Complete Assigned Person AT THE WORK SITE (after JSA Reviewer has signed)
ASSIGNED PERSON
TASK STEPS POTENTIAL HAZARDS HAZARDS CONTROLS
(Number) (What could go wrong?) (How can harm be prevented?) Name Complete

Obtain PTW Miss Communication. Obtain correct permit to work with proper documents.
Unauthorized person review of JSA for the entire work crew that will be
performingwork.
JSA complete, reviews and signed off prior to work by each crew
oractivity.
1. All the personnel to be safety Inducted.
Equipment Movement Traffic hazard 1.Control traffic by flagman; wear high visible vests
Pinch point / person caught by 2. watch moving equipment, use reverse horn/use flag
equipment Man.
‫مخاطر مرورية‬ 1. ‫ ارتداء سترات ومرئية عالية‬.‫مراقبة حركة المرور التي كتبها حامل الراية‬
‫ شخص اشتعلت من قبل معدات‬/ ‫قرصة نقطة‬ 2. ‫ استخدام العلم مان‬/ ‫ استخدم العكسي قرن‬،‫مراقبة المعدات المتحركة‬.
Crane Operations: Crane operator not Ensure crane operator has valid Certificate and qualified for the
1. Verify crane qualifiedaccording crane operating limits of the lift(s). Discuss lifts, order of lifts, placement
operator is qualified operations program for of lifts, etc. Stop work if weather conditions create hazards.
for the planned lift(s). the lift.
2. Crane operator Unplanned lifts can introduce
conducts pre-lift
hazard(s). Weather may create
discussion with
hazardous conditions.
all
personnel involved in
the lift(s).
3. Crane operator
determines if weather
conditions (seas, winds,
visibility) are suitable
for liftingoperations.

3 of 6
IBD-SLB JOB SAFETY ANALYSIS – HAZARD MANAGEMENT FORM
Task Description: Loading of ISo Containers by using Moble crane

Note: If the scope of work or the conditions change significantly, STOP THE JOB. Revise the JSA to address the hazards before proceeding.

Complete Task Steps / Potential Hazards / Hazard Controls PRIOR to the JSA Reviewer. Complete Assigned Person AT THE WORK SITE (after JSA Reviewer has signed)
ASSIGNED PERSON
TASK STEPS POTENTIAL HAZARDS HAZARDS CONTROLS
(Number) (What could go wrong?) (How can harm be prevented?) Name Complete

Pre-Use Slip, trips or falls. Accessing Use three-point contact ascending or descending ladders/stairs.
Crane crane walkway climbing Ensure all access points (swing doors chains) are latch and returned
Inspection:
ladders or stairs, etc. Walking to the close position when on catwalk. Use caution walking around
1. Access crane on catwalk (swing doors, engine or winch areas where oil, grease or uneven surfaces may
catwalkor walkway. chains, etc.) not latched. Oily, exist. Ensure puncture resistant work gloves are worn when
2. Walking around wet or uneven surfaces. Cuts inspecting hooks or cables.
craneboom and
walkway performing
from frayed cables or sharp
pre-use inspection. edges. Spills when
Perform function and checking/filling fluid levels.
operational tests.
Inspect Rigging: Slip, trips or falls while walk Use caution when walking in areas where cables or shackles are
1. Ensure all rigging around cables and/or shackles on the deck. Avoid stepping on uneven surfaces. Wear puncture
equipment is in good on deck. Pulls or strains lifting resistant work gloves when inspecting hooks or cables.
condition and tagged slings. Cuts from frayed cables
orcertified as required. orsharp edges. Hand or finger
2. Ensure
appropriatetypes of
pinchpoints.
slings and shackles
are available
and identified for thetype
lift(s).
Communication: Poor or no communication Verify channel and perform radio check. Establish eye .1

1. Establish between personnel may cause contact with signal person. Use appropriate hand signals.
communication injury to riggers, damage to
(radioor hand signal) equipment or spills if liquids
between crane arebeing transferred.
operator and all personnel
involved with the lift.

4 of 6
IBD-SLB JOB SAFETY ANALYSIS – HAZARD MANAGEMENT FORM
Task Description: Loading of ISo Containers by using Moble crane

Note: If the scope of work or the conditions change significantly, STOP THE JOB. Revise the JSA to address the hazards before proceeding.

Complete Task Steps / Potential Hazards / Hazard Controls PRIOR to the JSA Reviewer. Complete Assigned Person AT THE WORK SITE (after JSA Reviewer has signed)
ASSIGNED PERSON
TASK STEPS POTENTIAL HAZARDS HAZARDS CONTROLS
(Number) (What could go wrong?) (How can harm be prevented?) Name Complete

2. Crane outriggers shall be deployed in accordance


Setting up of crane. Overturning of the crane withmanufacturer’s instructions.
Collapse of the ground 3. When riggers are fully deployed the crane shall be level with
beneathoutriggers allwheels clear on the ground.
4. Sufficient Ballast/Counter-weight shall in place.
5. Outriggers (where applicable) shall only be deployed on
firmlevel ground.
6. Outriggers feet shall be fully supported on purpose made Pans
oradequate timbers
Loading /Offloading Pinch point 1. watch your hand and finger
Caravans Collapse of ladder placement, use proper PPE (hand
Hit by Equipment/load gloves)
Equipment failure/tools 2. Inspect the ladder before use, hold ladder by two
failure persons
Traffic 3. Watch for load movement, use tag line to control load,
issues use signal person
Crane/load collapse 4. Inspect equipment before use, make sure rigging
tool rated properly
Overhead lines
5. Control traffic by flagman, barricade work area to
Fall load from trailer divert traffic
6. Make sure area well compacted, follow the load chart
and make sure wind speed limit less than 36 km/h and
make sure all personnel take away 4 m before start
any lifting from the trailer.
7. barricate the area between the pipe line and lifting area
3 m minimum and one whatch man will be there to
make sure they will don’t going up to barricaded area
8. By tying load ropes when you transport the cabins
9. Watch for load movement, use tag line to control load,
5 of 6
IBD-SLB JOB SAFETY ANALYSIS – HAZARD MANAGEMENT FORM
Task Description: Loading of ISo Containers by using Moble crane

Note: If the scope of work or the conditions change significantly, STOP THE JOB. Revise the JSA to address the hazards before proceeding.

Complete Task Steps / Potential Hazards / Hazard Controls PRIOR to the JSA Reviewer. Complete Assigned Person AT THE WORK SITE (after JSA Reviewer has signed)
ASSIGNED PERSON
TASK STEPS POTENTIAL HAZARDS HAZARDS CONTROLS
(Number) (What could go wrong?) (How can harm be prevented?) Name Complete

use signal person


10. Inspect equipment before use, make sure rigging
tool rated properly
11. Control traffic by flagman, barricade work area to
divert traffic
12. Make sure area well compacted, follow the load chart
and make sure wind speed limit less than 36 km/h and
make sure all personnel take away 4 m before start
any lifting from the trailer.
13. barricate the area between the pipe line and lifting area
3 m minimum and one whatch man will be there to
make sure they will don’t going up to barricaded area
14. By tying load ropes when you transport the cabins

1. Make sure that cran drivers will set dawn the boom
Set Down crane Overturning of andoutriggers before he left the location.
the crane. One flage man will lead the crane till
Traffic issue the main gate
Conclude Slips, Trips, Falls near Proper storage of all rigging materials to racks or cabinets. Ensure
Lifting improperly stored slings or boom swing break is locked.
Operations: cables. Movement of unlocked
1. Return slings crane boom.
and rigging to
storagerack.
2. Secure crane in
boomrest
Lock swing break.

6 of 6