RISK ANALYSIS S-A-1-097-094

July 2016– Rev. 2.0


Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

REQUIRED REFERENCES RISK ANALYSIS REVIEW


Have the relevant Procedures, Standards, Guidelines, or
Yes N/A
Safe Work Practices been reviewed?
Attach or List Procedures: RISK ANALYSIS REVIEWER (Supervisor or Designate):

RISK ASSESSMENT
Must existing Procedures or Work Practices be
Yes No Name / Signature: Company:
modified to perform this work?
After mitigation, are there any hazards that continue to
Yes No
WORK SITE VERIFICATION
present a potentially significant risk?
The Work Team has assessed the worksite conditions and confirms:
IF YES TO EITHER QUESTION ABOVE, ATTACH THE
SPECIFIC PLAN OR PROCEDURE  The RISK ANALYSIS addresses the applicable hazards and necessary controls.
 The Team has the appropriate resources (people and equipment) to do the job safely.
PPE REQUIRED DURING THIS TASK
 Others that could be affected by the work have been informed.
HARD HAT SAFETY GLASSES
 Energy isolation (if applicable) has been VERIFIED and DEMONSTRATED.
FACE SHIELD
SAFETY SHOES / BOOTS
GOGGLES TASK LEADER:
HEARING PROTECTION: GLOVES: Name / Signature: Company:
SINGLE COTTON COMPLETE THE SECTION BELOW IF THIS RISK ANALYSIS
LEATHER IS NOT PART OF A PERMIT PACK
DOUBLE
IMPACT PROTECTION
RESPIRATOR TYPE Work Team Declaration: I acknowledge that I have reviewed the attached Risk Analysis, I understand my roles
OTHER (specify):      
(specify):       and responsibilities, and I will comply with the instructions for these tasks.
CHEMICAL (specify):      
SCBA Name (print): Company: Signature: Date:

DUST MASK                        


FALL PROTECTION CHEMICAL SUIT                        
FALL RESTRAINT APRON
                       
LIFE VEST                        
OTHER PPE (specify):      
WORK VEST
                       
FLAME RESISTANT                        
CLOTHING
                       
                       
                       

Page 1 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

This table of Hazards and Controls can assist the work group to manage hazards for the proposed work. The table does not include all possible hazards. It is expected
that the required PPE for the activity and work conditions will be used. Determine the Hazards that are present for the task and identify the Controls to be implemented.
Simultaneous
Pressurized Poor Lighting
Personnel Confined Space Operations Weather Ignition Sources
Equipment or visibility
(SIMOPS)

Perform isolation – LO/TO, Provide alternate lighting Provide induction or training Discuss confined space Follow SIMOPS matrix Implement controls for Remove, isolate, or contain
blinding, or defeat Wait or defer until visibility for new workers entry safe work practice MOC required for deviation slippery surfaces combustible materials
Depressurize, drain, purge, improves Mentor, coach, or supervise Monitor access or entry from SIMOPS restrictions High winds – goggles Provide fire fighting equipment
and vent No work over water that Verify competencies, skills, Protect surfaces from Interface between groups Heat – hydration, breaks Construct a fire-safe habitat
Relieve trapped pressure could require rescue and experience inadvertent contact Use barriers and signs to Cold – PPE, heaters Provide a fire watch during
Avoid auto-refrigeration (including sea state) Address applicable limitations Do not locate mobile engines segregate activities and after hot work
Lightening – tool selection,
when depressurizing near confined space Have permit counter signed defer work Conduct continuous gas testing
Anticipate residual pressure (fatigue, exhaustion, and Provide observer by leader of affected groups Bond or earth for static
or fluids restricted duty) Develop rescue plan electricity or cathodic protection
Manage multiple languages

Hazardous Equipment Falling or Lifting


Potential Spills High Noise Work at Heights
Substance Hot or Cold Dropped Objects Equipment

Drain or purge equipment Drain equipment Heat or cool equipment Wear correct hearing PPE Use signs and barriers to Confirm lifting equipment Discuss working at heights safe
Follow MSDS controls Provide spill containment before work starts Manage exposure times restrict entry or access under condition and certification work practice
equipment Install barriers work at elevation Obtain approval for lifts Verify fall restraint and arrest
Implement health hazards Shutdown equipment
controls (CO, Asbestos, H2S, Have spill clean up materials Provide warning signs Use lifting equipment to raise over processing equipment certification
Use "quiet" tools
…) and equipment on hand tools to or from the work equipment Apply abseiling safe work
Implement cold temperature Sound barriers or curtains platform Have a documented and practice
Test or analyze material Restrain and isolate hoses and brittle failure controls Provide or use suitable Secure tools (tie-off) approved lift plan
when not in use Wear thermal gloves communication techniques

Portable Electrical Moving Objects Equipment Vibrating Slips, Trips,


Radiation Hazard Manual Handling
Equipment or Equipment and Tools Equipment and Falls

Inspect equipment for Use barriers and signs to Confirm machinery guard Assess manual handling task Inspect equipment and tools Manage exposure times Identify and shield uneven
condition and test date restrict access integrity Limit load size No use of modified tools Assess affect of vibration surface or projections
currency Notify personnel who may Provide protective barriers on equipment Secure or cover cables, cords,
Manage posture Use protective guards
Implement continuous gas be affected Observer to monitor proximity Use low vibration and tubing
Confirm stability of load and Use correct tools and
testing Implement NORM controls of people and equipment equipment Clean up liquids
work platform equipment for task
Protect electrical leads from Conduct RAD testing Shut down or lockout Apply noise controls Barricade or rope-off openings
Get assistance or mechanical Protect or remove sharp
impact or damage equipment and holes
aid to avoid pinch points edges

High Energy or Waste Clean Up Other Energy Mobile Emergency


Excavations Other Hazards
High Voltage and Disposal Sources Equipment Response

Restrict access to authorized Have an excavation plan or Apply environmental Spring compression or Assess equipment condition Implement abrasive Keep egress route open
personnel only safe work practice management practices expansion control Implement controls on users blasting controls (for Keep shower and eye wash
Discharge equipment and Locate underground pipes Follow site waste Implement electromagnetic or access equipment and practices) stations accessible
make electrically dead or cables by hand digging management procedures (radio) controls Limit and monitor proximity to Prepare a dive plan Have a rescue plan in place
Observe safe work distances De-energize underground Clean up equipment and Manage pressure or vacuum live equipment or cables Manage potential blocked Keep emergency alarm, fire
for live cables services materials at site Manage heat generating Manage overhead hazards or plugged equipment equipment, and shutdown
Use flash burn PPE suit Implement confined space Optimize task to minimize processes Adhere to road and site rules locations unobstructed
Use insulated gloves, tools, entry controls waste production Use seismic activity safe work
and mats practice

Page 2 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

Note: If the scope of work or the conditions change significantly, STOP THE JOB. Revise the RISK ANALYSIS to address the hazards before proceeding.
Complete Task Steps / Potential Hazards / Hazard Controls PRIOR to the RISK ANALYSIS Reviewer.
Complete Assigned Person AT THE WORK SITE (after RISK ANALYSIS Reviewer has signed)
POTENTIAL HAZARDS HAZARDS CONTROLS
Type of danger Probability Exposure Gravity Risk
(What could go wrong?) (How can harm be prevented?)
Biological agents - Interpersonal contamination: influenza, colds and other - Medical follow-up of staff including vaccination for travel staff- Unusual Unusual Serious 42
contagious diseases - Tetanus Provision of travel first aid kits by the CMI medical service-
Information by the nurse on risks not covered by vaccination-
Influenza vaccination offered to staff by the CMI SA medical
service-
Toolbox meeting available- Limiting cases : iSOS
support if necessary (including repatriation)
Foodstuffs - Consumption of contaminated food - Accommodation of staff in establishments meeting European Unusual Occasional Serious 63
Food poisoning or poisoning standards -
Hepatitis A Hepatitis A vaccination by the medical service (travel risk)
Water-borne diseases (including bottles): cholera, diarrhoea, - Preventive treatment by the medical service (travel risk)
legionellosis, leptospirosis, polio, typhoid - Information by the nurse on risks not covered by vaccination
- Boundary cases : iSOS support if necessary (including
repatriation)
- Risk information by the travel operator (Wagonlit)
Light atmosphere - Reduced visibility due to weather conditions (snow and/or fog) - Lighting of work and traffic areas at the expense of the customer Possible Frequent Serious 42
- Insufficient lighting in work or traffic areas (e.g. night work) and/or subcontractors under the authority of CMI staff (additional borderline
Accident, impact/shock, visual fatigue, headache temporary lighting required) cases
- Lighting of outdoor traffic lanes to be provided by the customer-
Auxiliary lamp available to staff
Thermal environment - Temperature unsuitable for the activity (too hot or too cold) - Premises made available to air-conditioned and heated staff - Hot High Occasional Important 54
- Lack of heating or air conditioning in the premises and cold drinks made available to staff - likelihood of
Heat: Cramps, dehydration, fever, exhaustion, sunstroke, Clothing adapted to cold temperatures provided to staff occurrence
heat stroke - Information on the risks related to the machines and equipment
Cold: Loss of dexterity, hypothermia, frostbite, frostbite, installed (assembly specification, PSSE, machine risk analysis...)
frostbite, vascular disorders, Musculoskeletal disorders (MSDs) - Knowledge of the equipment by the participants- Applicable
Heat and cold: Discomfort, illness, episode awareness, withdrawal right
seasonal viruses, viral syndromes awareness
Animals (domestic, - Presence of animals in equipment packaging and/or - Preventive treatment/vaccination offered by the medical service Unusual Occasional Very 135
wild or tropical) & residential areas according to the place of destination - serious
flora Physical contact with animals, insects, reptiles by bite, attack, Provision of travel first aid kits by the CMI medical service
bite: mosquitoes, stray dogs, spiders, scorpions, reptiles (mosquito repellent...)
Contamination leading to Lyme disease, dermatitis, rabies, - Staff information (Toolbox meeting)
allergies, malaria, yellow fever - Risk information by tour operator (Wagonlit)
- Follow-up of customer recommendations - Vigilance during IPOs -
Toolbox available
Animals (domestic, Contact with plants & plants - Provision of travel first aid kits by the CMI medical service Envissible but Occasional Serious 10,5
wild or tropical) & Allergies, ingestion, injections unlikely
flora
Noise - Noise >85dB(A) in the construction area (noisy machines) but - Hearing protection provided to staff - Virtually Frequent Important 180
also offices / noise related to adjacent industrial activity or Medical follow-up of staff (SEPP - Audiometry) certain
assembly activities (machines and noisy machines) - Noise - Staff information (Toolbox meeting)
environment (shared offices) - Sound level meter available - Toolbox available
Hearing loss, discomfort, difficulty concentrating, fatigue,
irritability
Noise - Day or night environmental pollution - Commissioning procedure - Coordination with the Client - Possible Occasional Very 45
Page 3 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

POTENTIAL HAZARDS HAZARDS CONTROLS


Type of danger Probability Exposure Gravity Risk
(What could go wrong?) (How can harm be prevented?)
Neighbourhood complaint Night work permit before any work - Limited night work / favoured borderline serious
Criminal proceedings day work cases
Fall from height - Access to unsecured high areas as part of an inspection or - Opening of the areas after complete control of the mounted Unusual Unusual Major 240
assembly check- structures -
Falling from a permanent or temporary platform- Presence of Construction site helmet equipped with chinstrap for all access at
unidentified holes- Duckboards/structures not properly secured height -
- Movement on equipment to inspect them Prohibition of access to unsecured areas by means of collective
Fall from height: Wound, Contusion, Hematomas, Sprain, protection -
Fracture, Death Prohibition of the use of makeshift means -
Personnel informed about the risk of falling (risk analysis, tool-box
meeting)
- Authority of CMI personnel over its subcontractors for securing
work and/or traffic areas
- Personnel informed of the right to withdraw -
Training of personnel in risks within the framework of the VCA VOL
-
Assembly phase integrating the risks of falling -
Design of equipment integrating protection against falls
Fall on one level, - Falling down stairs - - Staff equipped with safety shoes- Unusual Occasional Serious 63
Striking, tripping or Uneven, slippery, crowded ground - CMI staff authority to request subcontractors to clean/stow the work
other movement Blocked traffic lanes/passages (cables, equipment,...) areas concerning them-
disturbances - Striking on sharp equipment (belt, pipes not deburred...) Signed risk areas: at the expense of the customer/subcontractors-
Wound, Contusion, Hematomas, Sprain, Fracture Toolbox meeting on storage
Falling objects and - Absence of baseboard on platform or scaffolding- - Wearing of a construction site helmet is mandatory on site - Unusual Frequent Very 270
collapses Overlapping work / failure to signal work at height and/or Compliance with the lifting triangle - serious
absence of a net- Compliance with site signage -
Object falling during lifting operation "improper load securing" Personnel informed of the risk of falling objects
- Crane work without checking the load- Overloading of - Overlapping work prohibited -
scaffolding CMI personnel authority over its subcontractors to ensure the safety
Wound, Contusion, Hematoma, Sprain, Fracture, Head of work areas (nets, floor signs, use of tool boxes, etc.)
injury, Death - Lifting plan requested from subcontractors - Vigilance
Damage to equipment - Periodic verification of the validity dates of construction site
helmets
Circulations & - Walking and travelling on uneven grounds- - Mandatory wearing of safety shoes in good condition Unusual Frequent Serious 126
movement Construction site congestion: e. g. equipment in traffic lanes, - Site installation plan defined before the start of work (preliminary
cutting or ground-cutting materials (nails...) visit)
- Reduced accessibility (scaffolding, ladders) - Parking space for vehicles carried in the PSSE/Prevention plan-
- Work area/workshop not marked- Unprotected cutting material Site traffic plan (Client) communicated to staff when there is a
(strip...) CMI staff authority to request subcontractors to clean/stow the work
- Collision by a construction vehicle areas concerned-
Striking, shock, contusion, hematoma, fracture, cut, sprain, Toolbox housekeeping available-
strain Work clothing with retro-reflective strips
Climatic & natural Extreme temperatures (hot/cold), high humidity, hypothermia, - Natural risks included in the Health, Safety and Environment Plan Possible Frequent Very 90
sunburn, sunstroke, sunstroke, heat dehydration, skin cancer, (where available) borderline serious
eye diseases - Local meteorological monitoring cases
- Specific plan if necessary-
Suitable work clothing (parka...) made available to staff- Air-
conditioned office-
Hot and cold drinks available to staff-
Risk information
Climatic & natural Extreme natural phenomena: avalanche, earthquake, floods, - Natural risks included in the Site Health, Safety and Environment Possible Unusual Major 80
Page 4 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

POTENTIAL HAZARDS HAZARDS CONTROLS


Type of danger Probability Exposure Gravity Risk
(What could go wrong?) (How can harm be prevented?)
landslides, cyclone/tornade, hurricane, tidal wave, high winds Plan (when available) borderline
- Local weather monitoring by the site manager cases
- Information by iSOS (application) including alert - application
installed when new employees arrive -
Ministry of Foreign Affairs website available and informing of risks
Coactivity & external - Presence of other companies/subcontractors/services of the - Organisation of an initial Kick-off meeting with the Client- Unusual Frequent Very 270
companies client in activity on the same work area (overlapping work....): Coordination of CMI activities / operation / other companies serious
sharing of staff premises, access and workspaces -> lack of provided by the Client-
knowledge of imported / exported risks- lack of knowledge of Kick off meeting CMI / subcontractors organised before the start of
the risks inherent in the customer's activity (production, work-
operation and/or works) - Regular CMI coordination meetings / Subcontractors, CMI / Client-
- lack of coordination of activities/works by the customer- Signalisation/beaconing of construction site areas-
- lack of knowledge by one company of the risks/works of the PSSE communicated to subcontractors and known to the staff
other company : traffic plan, premises and unknown - Safety Manager appointed for CMI -
instructions, nuisances generated by the other company Safety Manager solicited from CMI subcontractors
Miscellaneous injuries, crushing, death
Addictive behaviours - Presence of alcoholic beverages in the premises- - Prohibition of the introduction and consumption of alcohol on Unusual Occasional Very 135
Working conditions generating substance use: Intensity and construction sites included in the Health, Safety and Environment serious
complexity of work, schedules, atmosphere, insecurity of the Plans -
work situation Prohibition of being intoxicated on construction sites (Cf. PSSE)
- Presence of intoxicated personnel at the workplace or during - Toolbox on addictive behaviours available - Periodic staff medical
work surveillance (SEPP)
- Medical treatment generating symptoms similar to alcohol or
drugs
Accident, traffic accident, inappropriate behaviour
(aggressiveness/damage), damage to the company's
reputation, expulsion from the site, customer sanction
Consequences for the consumer: Decreased alertness and
reflexes, altered visual perception, depression, anxiety,
hallucinations, mood disorders and paranoia, loss of motivation,
inability to communicate, loss of professional identity, irritability,
aggressiveness, suicide, death$
Degradation/damage to the company's reputation
Electric - Defective electrical installations and/or appliances - Use of subcontractors qualified in safety Possible Unusual Major 80
- Bare conductor under accessible voltage - Compliance with current legislation (electrical safety) borderline
- Failure to record an electrical installation during an - Recording of electrical installations in the event of intervention cases
intervention - Staff information (Toolbox meeting)
- Unqualified personnel working on an installation - Staff trained to deal with electrical risks (electrical authorisation)
Electrification, Electrocution, Electric shock, Burns
Fluids and pressure Hydraulic pressure equipment or installation: cylinder on - Personnel trained in the risks related to fluids and pressurized Unusual Unusual Serious 42
equipment press, shovel, crane... equipment -
Contusion, Hematoma, Fracture Fire and fire Recording of installations before intervention
Soil pollution
Fluids and pressure Compressed gas pressure apparatus or installation (including - Personnel trained in the risks related to fluids and pressure Unusual Occasional Very 135
equipment flammable gases): pneumatic cylinders, equipment supply lines equipment - serious
(compressed air, nitrogen, hydrogen, acetylene...), tank, Recording of installations before intervention - Staff information
cylinders... (Toolbox Meeting)
Contusion, Hematoma, Fracture, Suffocation - Measuring, marking and recording equipment available
Explosion, fire
Hygiene & health risk - Inadequate sanitation/hygiene of the premises - Site installations provided by CMI providing for hygiene facilities Possible Frequent Important 18
- Lack of installation (sanitary facilities, changing rooms, - Cleaning contract with local companies borderline
Page 5 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

POTENTIAL HAZARDS HAZARDS CONTROLS


Type of danger Probability Exposure Gravity Risk
(What could go wrong?) (How can harm be prevented?)
canteen, shower...) - PSSE including a site installation plan cases
- Unsafe water
-Lack of maintenance and cleaning of the premises
Environmental impact - Water pollution: chemical spills (container leaks, pipe breaks, - Provision of retention tanks in chemical storage (subcontractors) Possible Unusual Very 30
machine leaks) - Compliance with customers' internal procedures - borderline serious
'- Soil pollution: chemical spills- Maintenance/setting of combustion appliances cases
Air pollution: gases, vapours, dust (NOx, CO, CO2...) - Declaration of "environmental" events
- Material safety data sheets for products available on site
- Mandatory sorting of waste in the PSSE
Environmental impact - Consumption of natural resources (water, electricity, etc.) - Sizing of installations according to design Virtually Permanent Minor 100
certain
Fire, Explosion - Inadequate storage of flammable products, cardboard, paper - Emergency facilities available on site and in the CMI premises (at Unusual Occasional Very 135
- Mixing/ combination of incompatible products - Hot spot work least 1 fire extinguisher) serious
- High concentration of products in the air of a room (creation of - Personnel informed of the action to be taken in the event of a fire
explosive atmospheres in the air) and PPE
- Presence of ATEX zones - Instructions in the event of a fire/evacuation posted in the
- Defective electrical installations that can generate heat or fire premises
starts - ATEX zone initially defined (PSSE)
- Impossibility of access to external emergency services - Regular removal of waste
- Absence of personnel trained in first aid - Emergency exits free of any form of required encumbrance
- Impossibility of evacuation - Minimum number of first-aid attendants required on site (1 in 20)
Burns, Inhalation of toxic fumes, CO poisoning, (CMI and/or ST)
Unconsciousness, Loss of consciousness, Loss of limb, - Means of extinguishing close to work in hot spots- Smoking
Death Destruction of facilities prohibition instructions carried in the PSSE-
Assembly point defined and communicated to staff (PSSE, Safety
induction)
- Fire permit established according to customer procedures (+
supervisor)
- Gas/chemical cylinders stored in accordance with the principle of
fire prevention (incompatibility, ventilation...)
- Personnel equipped with gas detectors (CO, O2)
Machines, - Presence of moving parts (saw, folding machine, press) - Mechanical protective gloves available to personnel Unusual Unusual Major 240
equipment, tools Striking, crushing, wound, contusion, cutting - CO/O2 detectors        
  - Sharp parts/tools (tape...) Cutting, amputation - Consignment of equipment if necessary
- Spraying of chips, fluids, dust, related to the use or operation - Safety data sheets for the products used available on site
of tools, machines (welding work...) - Operation of equipment known to personnel
Eye and/or skin irritation, respiratory and/or skin allergy, cut, - Emergency kit available on site
wound, contusion, fracture, intoxication - Staff information (Toolbox meeting...)
- Presence of retracted corners Training, crushing, loss of limb, - Beacon/consignment in the event of equipment testing
death - Trained and competent personnel (Job description)
- Zone/hot parts Burn
- Live equipment Electrification, electrocution
Fire, explosion
Air pollution
Manual handling - Heavy load transport (equipment, office equipment, etc.) - Handling equipment may be available from subcontractors Possible Occasional Serious 21
Muscle pain - joint, inflammation, low back pain, back pain, - If no two-person load is carried borderline
acute or chronic disease, musculoskeletal disorders (MSDs) cases
Mechanical handling - Pedestrian/gear collision - Informed and trained personnel (VCA) Unusual Frequent Very 270
& lifting - Falling load (unsecured/unbalanced load) - Respect of safety distances (lifting triangle) serious
- Overturning of equipment - Crushing of personnel - Personnel equipped with clothing wearing retro-reflective strips
Wound, Contusion, Fracture, Loss of a limb, Death - Signalling of lifting operations for which the person responsible for
Page 6 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

POTENTIAL HAZARDS HAZARDS CONTROLS


Type of danger Probability Exposure Gravity Risk
(What could go wrong?) (How can harm be prevented?)
the operation is responsible (Subcontractor -> CMI and/or Client
and/or other companies)
- If necessary, traffic plan required from the client
- Specific toolbox
Psychosocial aspects - Multiplicity of tasks and workers - Working time limited to legislative and regulatory values High Frequent Serious 252
- Constraints of schedules and deadlines - Means of communication made available to staff - Local hospital likelihood of
- Variable work intensity according to the periods of the year indicated in the ESSP occurrence
- Irregular meal schedules, skipped meals, precarious meals - Medical assistance via insurer of the CMI SA Group - Annual
- Working hours: non-compliance with legal working time limits evaluation of staff
- Interpersonal conflicts - Periodic return site/home
- Isolation- Isolated work - Raising staff awareness of psychosocial risks (World Safety Day,
- Stress and psycho-somatization training of management staff, etc.)
- Difficulty accessing medical care (if necessary) - Pulse survey (measurement)
- On-to-one interview (identification)
- Appointment of a trusted person within CMI SA.
- Risk mentioned in the context of welcoming new employees
(safety induction)
- Periodic medical follow-up and medical check-up after absence
(21 days)
- Monitoring of the absenteeism indicator
Seasonal and/or - Lack of knowledge of internal rules CMI/equipment & - Safety reception-quality-environment systematized prior to any on- Unusual Frequent Serious 126
temporary staff associated risks- Difficulty of adaptation site commitment
- Lack of information, lack of reception- Insecurity of - Communication of the project's ESSP
employment - Periodic monitoring of staff (maintenance, on-to-one)
Accident, stress, increased risk-taking, various injuries - Follow-up of customer training on site- Supervision by the
designated site manager- Specific training required (VCA, first
aid...)
- Safety induction on site by the teams present under the
responsibility of the site manager
- Medical monitoring of the staff requested, including external staff-
Safety training required
- Evaluation of health, safety and environmental knowledge at the
time of employee selection
Radiation - Gamma radiation (steel thickness measurements) - Staff informed of risks (especially imported risks) Unusual Unusual Very 90
- Infrared radiation (furnace) - Compliance with site procedures & commissioning procedure - serious
- Laser waves (process instrumentation) & high frequency Visual and/or acoustic signaling in case of radiation risk - Protected
electromagnetic waves (zinc pot, galvaneal) equipment/facilities
- Waves and electromagnetic fields (motors, customer - Night test when there is a high risk of exposure of staff - Marking
installations) of work areas
Body burn, eye burn, radiation causing cancer, genetic
mutations, disorders during pregnancy, heating/displacement of
braces/theses/pacemaker, death
Road risk Driving a vehicle - Traffic plan communicated to staff when available Possible Frequent Very 90
- Striking by a construction or operating machine - Provision of a vehicle with driver when required (India in particular) borderline serious
- Lack of a traffic plan within the company - High-visibility work clothing cases
General risks - Absence of a Prevention Plan - HSE base plan drawn up by QSE for project teams Unusual Frequent Very 270
- Absence of a Site Safety Manager - Site organisation chart integrated into the HSEP if any serious
- Non-definition of the elements of the PIC - Safety responsibility described in the HSEP: responsibility for
- Choice of subcontractors without prior safety guarantees applying safety rules to the Site Manager in the absence of a
- Non- compliance by subcontractors with HSE rules designated Safety Manager
- Failure to organise Toolbox meetings or site inspections - HSE Plan communicated to subcontractors
Page 7 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

POTENTIAL HAZARDS HAZARDS CONTROLS


Type of danger Probability Exposure Gravity Risk
(What could go wrong?) (How can harm be prevented?)
- Failure to train staff (in particular those contracted) - Assembly specification integrating HSE aspects communicated
- Failure to report accidents/incidents/presqu'accidents prior to signing the contract
Accident - Toolbox meeting manual available to project and site teams
Loss of EHS certification - Organisation note relating to the declaration of HSE events
Liability (criminal and/or civil) communicated to all personnel
Sociocultural - Insecurity - Minimum bilingual staff including English Unusual Frequent Important 54
- Lack of hygiene - Medical follow-up of staff, vaccination, medical follow-up prior to
- Cultural non-adaptation: dress, alcohol consumption, sexual travel
behaviour, freedom of political expression, religion (faith & - Basic travel training
belief) - Traveller information Wagonlit + iSOS
- Communication difficulties
Hazardous - Presence of carcinogenic Mutagenic and toxic products for - Training of personnel in chemical risk High Unusual Very 180
substances, Reproduction: asbestos, refractory ceramic fibres, Chromium 6 - Safety data sheets for the products used available on site likelihood of serious
emissions, projection - Hazardous substances gases: carbon monoxide, nitrogen - Imported risks included in the PSSE occurrence
oxide, ozone, phosphorus, sulphur oxide and acid, halogen, - Staff information (Tool box meeting, PSSE, assembly
chlorine, exhaust gas specification, commissioning procedure...)
- Liquid hazardous substances : aliphatic and/or alicyclic - Medical follow-up of exposed personnel (SEPP)
hydrocarbons, N-hexane, trichloroethylene, formic acid, phenols - Compliance with storage rules, use
and halogenated derivatives, aromatic amines and hydrazines, - Appropriate protective equipment available (gloves, mask, safety
paint solvents, oils, fats, paints, phosphoric acid, chromic acid glasses...).
- Dangerous substances dusts: slag, artificial mineral fibres, - Additional PPE if necessary (FFP3 masks, suit...)
zinc, cement, lead, selenium, antimony, magnesium, aluminium - If necessary personnel equipped with detectors (CO/O2)
- Products emitted by assembly operations: gases and fumes - Compliance with site procedures
from welding operations (CMR rated) - Note on the prohibition of the use of asbestos in design &
Irritation, burning, allergy, cancer, neurological damage - reminder of the substitution principle
renal - hepatic, genetic mutations, disorders during pregnancy,
death
Fire, Explosion
Pollution of water, soil, air
Technological (risk) - Intervention in dangerous installations: e. g. Seveso - Initial information to staff through the ESSP Unusual Permanent Serious 210
- Safety of the critical customer's industrial installations - Information to staff on site emergency measures (Safety Induction
of the customer and/or CMI)
- First aid staff among site teams
Working at height Prohibited if not secured by collective protection - Prohibition of the use of safety harnesses / requirement for Envissible but Frequent Major 120
subcontractors to ensure the safety of work areas by means of unlikely
collective protection before any control/access by CMI teams
Isolated work - Unable to be rescued - Intervention in pairs Possible Unusual Major 80
Bodily, psychological and death traumas - Staff working mainly with subcontracted staff - Staff equipped with borderline
means of communication cases
Working on screen - Incorrect arrangement of workstation equipment (against a - Equipment made available to staff (office, headquarters, etc.) Unusual Frequent Important 54
wall, back to a window) - Activity alternating between office and site
- Inadequate work equipment: seat, mouse, keyboard, screen,...
- Prolonged computer work (more than 4 hours a day)
- Poor working postures (neck, back, upper limbs)
- Static work without pauses
- Visual stress (eye-screen distance, font size, screen
brightness, inappropriate writing colour...)
- Brightness problem (lack of light, reflection, glare, contrast
problem, absence of natural light...)
Physical consequences: Visual fatigue, Headache, Cervical
pain, Shoulder pain, elbows, wrists, musculoskeletal disorders
Page 8 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

POTENTIAL HAZARDS HAZARDS CONTROLS


Type of danger Probability Exposure Gravity Risk
(What could go wrong?) (How can harm be prevented?)
(MSDs)
Psychological consequences: Irritability, Stress
Work in confined or - Lack of oxygen/rarefied air- Contamination of air by - Personnel equipped with O2/CO detectors Possible Unusual Major 80
restricted spaces products/process gases (e. g. smoke...) - Procedure/permit established according to site procedures / risk borderline
- Inability to evacuate analysis / work permit cases
Asphyxia, death - Procedures established in the UHCP - Personnel informed of risks
Public safety - Theft of equipment, documents, industrial documents, - Premises made available to CMI staff with the possibility of a key Unusual Unusual Very 90
disorders, loss & materials lock - serious
damage - Attack, crowd movement, social movements, brawls... List of prohibited countries, list of countries not recommended -
- Assault on staff Registration of staff at the embassy (CMI recommendation)
Stress, injury, criminal prosecution - Confidentiality policy (CMI staff / Subcontractors ? - CMI /
Contracted?)
- iSOS Assistance -
Registration of staff at the Embassy for long stays
Emergency situations - Medical problem - Travel instruction available on Mike     Very 30
- Fire/Explosion - Communication Wagonlit on risks serious
- Political, natural, geopolitical disturbances - Legal, medical and travel assistance via iSOS - installation of the
- Assault on-site containment, evacuation, repatriation application on CMI telephones
- Notice to travellers from the Ministry of Foreign Affairs
- Defined alert procedure (see procedure for reporting OHSE events
: industry.alert@cmigroupe.com)
- First aid trained staff

Page 9 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

Type de danger RISQUES (qu’est ce qui peut mal tourner ?) MESURES DE PRÉVENTION Probabilité Exposition Gravité R
- Contamination interpersonnelle : grippe, rhume et autres - Suivi médical du personnel incluant la vaccination pour le
maladies contagieuses personnel voyageant
- Tétanos - Mise à disposition de trousses de secours voyage par le service
médical CMI
- Information par l'infirmière des risques non couverts par la
Agents biologiques vaccination Inhabituel Inhabituelle Sérieux 42
- Vaccination Grippe proposée au personnel par le service médical
CMI SA
- Toolbox meeting disponibles
- Cas limites : Prise en charge iSOS si nécessaire (y compris
rapatriement)
- Consommation d'aliments contaminés - Logement du personnel dans des établissements aux standards
 Intoxication ou empoisonnement alimentaire européens
 Hépatite A - Vaccination hépatite A par le service médical (risque voyage)
 Maladies transmises par l'eau (y compris les bouteilles) : - Traitements préventif par le service médical (risque voyage)
Alimentaire cholera, diarrhée, légionellose, leptospirose, polio, typhoïde - Information par l'infirmière des risques non couverts par la Inhabituel Occasionnelle Sérieux 63
vaccination
- Cas limites : Prise en charge iSOS si nécessaire (y compris
rapatriement)
- Information du risque par l'opérateur voyage (Wagonlit)
- Visibilité réduite du fait des conditions climatiques (neige - Eclairage des lieux de travail et de circulation à charge du client
et/ou brouillard) et/ou des sous-traitants sous l'autorité du personnel CMI (éclairage
Cas limites
Ambiance lumineuse - Eclairage insuffisant dans les lieux de travail ou de circulation temporaire supplémentaire requis) Fréquente Sérieux 42
possible
(ex : travail de nuit) - Eclairage des voies de circulation extérieures à fournir par le client
 Accident, heurt/choc, fatigue visuelle, céphalées - Lampe d'appoint à disposition du personnel
- Température inadaptée à l'activité (trop chaude ou trop froide) - Locaux mis à disposition du personnel climatisés et chauffés
- Défaut de chauffage ou de climatisation dans les locaux - Boissons chaudes et froides mises à disposition du personnel
 Chaleur : Crampes, déshydratation, fièvre, épuisement, - Vêtements adaptés aux températures froides fournis au personnel
insolation, coup de chaleur - Information des risques liés aux machines et équipements
Grande
Ambiance thermique  Froid : Perte de dextérité, hypothermie, gelures, engelures, installés (spécification de montage, PSSE, analyse de risque Occasionnelle Important 54
vraisemblance
troubles vasculaires, Troubles Musculo Squelettiques (TMS) machine...)
 Chaleur et froid : Inconfort, maladies, sensibilisation aux - Connaissance des équipements par les intervenants
épisodes, viraux saisonniers, sensibilisation aux syndromes - Droit de retrait applicable
viraux
- Présence d'animaux dans les emballages d'équipements et/ou - Traitement préventif/vaccination proposés par le service médical
lieux de résidences en fonction du lieu de destination
 Contact physique avec des animaux, insectes, reptiles par - Mise à disposition de trousses de secours voyage par le service
Animaux
morsure, attaque, piqure : moustiques, chiens errants, médical CMI (anti-moustique…)
(domestiques, Très
araignées, scorpions, reptiles - Information du personnel (Toolbox meeting) Inhabituel Occasionnelle 135
sauvages ou sérieux
 Contamination entrainant des maladies de type Maladie de - Information du risque par voyagiste (Wagonlit)
tropicaux) & flore
Lyme, dermatites, rage, allergies, malaria, fièvre jaune - Suivi des recommandation Client
- Vigilence lors des OPI
- Toolbox disponible
Animaux Contact avec des plantes & végétaux - Mise à disposition de trousses de secours voyage par le service
Envisageable
(domestiques,  Allergies, ingestion, piqûres médical CMI
mais peu Occasionnelle Sérieux 10,5
sauvages ou
probable
tropicaux) & flore
Bruit - Bruit >85dB(A) dans la zone de construction (machines - Protection auditive mise à disposition du personnel Pratiquement Fréquente Important 180
bruyantes) mais aussi les bureaux / bruit lié à l'activité - Suivi médical du personnel (SEPP - Audiométrie) certain
industrielle contigüe ou aux activités de montage (engins et - Information du personnel (Toolbox meeting)
machines bruyantes) - Sonomètre disponible
- Ambiance sonore bruyante (bureaux partagés)
Page 10 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

Type de danger RISQUES (qu’est ce qui peut mal tourner ?) MESURES DE PRÉVENTION Probabilité Exposition Gravité R
 Perte auditive, gêne, difficulté de concentration, fatigue, - Toolbox disponible
irritabilité
- Pollution environnementale diurne ou nocturne - Procédure de mise en service
 Plainte du voisinage - Coordination avec le Client Cas limites Très
Bruit Occasionnelle 45
 Poursuites pénales - Permis de travail nocturne avant tout travaux possible sérieux
- Travail de nuit limité / travail de jour favorisé
- Accès à des zones en hauteur non sécurisées dans le cadre - Ouverture des zones après contrôle complet des structures
d'inspection ou vérification de montage montées
- Chute d'une plateforme définitive ou temporaire - Casque de chantier équipé de jugulaire pour tous les accès en
- Présence de trou non signalé hauteur
- Caillebotis/structure mal fixé(e) - Interdiction d'accès aux zones non sécurisées au moyen de
- Déplacement sur les équipements pour les inspecter protection collective
 Chute de hauteur : Plaie, Contusion, Hématome, Entorse, - Interdiction d'utilisation de moyens de fortune
Fracture, Décès - Personnel informé sur le risque de chute (analyse de risque, tool-
Chute de hauteur Inhabituel Inhabituelle Majeur 240
box meeting)
- Autorité du personnel CMI sur ses sous-traitants pour mise en
sécurité des zones de travail et/ou de circulation
- Personnel informé du droit de retrait
- Formation du personnel aux risques dans le cadre du VOL VCA
- Phasage de montage intégrant les risques de chute
- Conception des équipements intégrant la protection contre les
chutes
- Chute dans les escaliers - Personnel équipé de chaussures de sécurité
Chute de plain-pied,
- Sol inégal, glissant, encombré - Autorité du personnel CMI pour solliciter auprès des sous-traitants
Heurt, trébuchement
- Voies de circulation/passages obstrués (câbles, matériel, …) le nettoyage/rangement des zones de travaux les concernant
ou autres Inhabituel Occasionnelle Sérieux 63
- Heurt sur des équipements tranchants (bande, tuyauteries non - Zones à risque signalées : à charge du client/des sous-traitants
perturbations de
ébavurées…) - Toolbox meeting sur le rangement
mouvement
 Plaie, Contusion, Hématome, Entorse, Fracture
- Absence de plinthe sur plateforme ou échafaudage - Port du casque de chantier obligatoire sur chantier
- Travaux superposés / défaut de signalisation de travaux en - Respect du triangle de levage
hauteur et/ou absence de filet - Respect de la signalisation de chantier
- Chute d'objet au cours d'opération de levage "mauvais - Personnel informé du risque de chute d'objet
arrimage de charge" - Travaux superposés interdits
Chutes d'objets et - Travaux de grue sans vérification de la portance des sols - Autorité du personnel CMI sur ses sous-traitants pour mise en Très
Inhabituel Fréquente 270
effondrements - Surcharge d'échafaudage sécurité des zones de travail (filets, signalisation au sol, utilisation sérieux
 Plaie, Contusion, Hématome, Entorse, Fracture, de boites à outils...)
Traumatisme crânien, Décès - Plan de levage sollicité de la part des sous-traitants
 Dommages aux équipements - Vigilance
- Vérification périodique des dates de validité des casques de
chantier
- Marche et déplacements sur des terrains accidentés - Port obligatoire de chaussures de sécurité en bon état
- Encombrement de chantier : ex matériel dans les voies de - Plan d'installation de chantier défini avant le démarrage des
circulation, matériaux tranchant ou coupant au sol (clous…) travaux (visite préalable)
- Accessibilité réduite (échafaudages, échelles) - Emplacement de parking des véhicules portés dans le PSSE/Plan
- Zone de travaux/atelier non balisée de prévention
Circulations &
- Matériel tranchant non protégé (bande…) - Plan de circulation du site (Client) communiqué au personnel Inhabituel Fréquente Sérieux 126
déplacement
- Collision par un véhicule de chantier lorsqu'il existe
 Heurt, choc, contusion, hématome, fracture, coupure, - Autorité du personnel CMI pour solliciter auprès des sous-traitants
entorse, foulure le nettoyage/rangement des zones de travaux les concernant
- Toolbox housekeeping disponible
- Vêtements de travail équipés de bandes rétro-réfléchissantes
Climatique & naturel Température extrêmes (chaude/froide), forte humidité, - Risques naturels portés dans le Plan Santé Sécurité Cas limites Fréquente Très 90
Page 11 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

Type de danger RISQUES (qu’est ce qui peut mal tourner ?) MESURES DE PRÉVENTION Probabilité Exposition Gravité R
hypothermie, coups de soleil, insolation, déshydratation de Environnement de chantier (lorsqu'il existe)
chaleur, cancer de la peau, pathologies oculaires - Suivi météorologique local
- Plan spécifique si nécessaire
- Vêtement de travail adapté (parka…) mis à disposition du
possible sérieux
personnel
- Bureau climatisé
- Boissons chaudes et froides à disposition du personnel
- Information des risques
Phénomènes naturels extrêmes : avalanche, tremblement de - Risques naturels portés dans le Plan Santé Sécurité
terre, inondations, mouvements de terrain, cyclone/tornade, Environnement de chantier (lorsqu'il existe)
ouragan, raz-de-marée, vents violents - Suivi local de la météo par le responsable de site
Cas limites
Climatique & naturel - Information par iSOS (application) y compris par alerte - Inhabituelle Majeur 80
possible
application installée lors de l'arrivée des nouveaux collaborateurs
- Site du ministère des affaires étrangères disponibles et informant
des risques
- Présence d'autres entreprises/sous-traitants/services du client - Organisation d'un Kick-off meeting initial avec le Client
en activité sur la même zone de travail (travaux superposés...) : - Coordination activités CMI / exploitation / autres entreprises
partage des locaux du personnel, des accès et des espaces de assurée par le Client
travail -> méconnaissance des risques importés / exportés - Kick off meeting CMI / sous-traitants organisé avant le démarrage
Coactivité & - Méconnaissance des risques inhérents à l'activité du client des travaux
Très
entreprises (production, exploitation et/ou travaux) - Réunions régulières de coordination CMI / Sous-traitants, CMI / Inhabituel Fréquente 270
sérieux
extérieures - Défaut de coordination des activités/travaux par le client Client
- Méconnaissance par l'une des entreprises des risques/travaux - Signalisation/balisage des zones de chantier
de l'autre entreprise : plan de circulation, locaux et consignes - PSSE communiqué aux sous-traitants et connus du personnel
inconnus, nuisances générées par l'autre entreprise - Safety Manager désigné pour CMI
 Blessures diverses, Ecrasement, Décès - Safety Manager sollicité des sous-traitants CMI
- Présence de boissons alcoolisées dans les locaux - Interdiction d'introduction et de consommation d'alcool sur les
- Conditions de travail générant une consommation de sites de construction inscrite dans les Plans Santé Sécurité
substances : Intensité et complexité du travail, horaires, Environnement
ambiance, insécurité de la situation de travail - Interdiction de se trouver en état d'ébriété sur les sites de
- Présence de personnel en état d'ébriété sur le lieu du travail construction (Cf. PSSE)
ou à l'occasion du travail - Toolbox sur les conduites addictives disponible
- Traitement médical générant des symptômes identiques à - Surveillance médicale périodique du personnel (SEPP)
l'alcool ou aux drogues
Très
Conduites addictives  Accident, accident de la circulation, comportement inadéquat Inhabituel Occasionnelle 135
sérieux
(agressivité/dégradation), dommage à la réputation de
l'entreprise, expulsion du site, sanction du client
 Conséquences pour le consommateur : Diminution de la
vigilance et des réflexes, modification de la perception visuelle,
dépression, anxiété, hallucinations, troubles de l’humeur et
paranoïa, perte de motivation, incapacité à communiquer, perte
d’identité professionnelle, irritabilité, agressivité, suicide, décès
$ Dégradation/dommage à la réputation de l'entreprise
- Installations et/ou appareils électriques défectueux - Utilisation de sous-traitants qualifiés en sécurité
- Conducteur nu sous tension accessible - Respect des législations en vigueur (sécurité électrique)
- Non-consignation d'une installation électrique lors d'une - Consignation des installations électriques en cas d'intervention Cas limites
Electrique Inhabituelle Majeur 80
intervention - Information du personnel (Toolbox meeting) possible
- Personnel non qualifié intervenant sur une installation - Personnel formé au risque électrique (habilitation électrique)
 Electrisation, Electrocution, Choc électrique, Brûlures
Fluides et Appareil ou installation à pression hydraulique : vérin sur - Personnel formé aux risques liés aux fluides et équipements sous Inhabituel Inhabituelle Sérieux 42
équipements sous presse, pelle, grue… pression
pression  Contusion, Hématome, Fracture - Consignation des installations avant intervention
Page 12 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

Type de danger RISQUES (qu’est ce qui peut mal tourner ?) MESURES DE PRÉVENTION Probabilité Exposition Gravité R
 Incendie
 Pollution des sols
Appareil ou installation à pression de gaz comprimé (gaz - Personnel formé aux risques liés aux fluides et équipements sous
inflammables compris) : vérins pneumatiques, conduites pression
Fluides et
d'alimentation des équipements (air comprimé, azote, - Consignation des installations avant intervention Très
équipements sous Inhabituel Occasionnelle 135
hydrogène, acétylène…), réservoir, bouteilles... - Information du personnel (Toolbox Meeting) sérieux
pression
 Contusion, Hématome, Fracture, Suffocation - Matériel de mesure, de marquage et de consignation disponible
 Explosion, incendie
- Insalubrité/état d'hygiène insuffisant des locaux - Installations de chantier mises à disposition par CMI prévoyant les
Hygiène & risque - Défaut d'installation (sanitaires, vestiaires, cantine, douche…) moyens d'hygiène Cas limites
Fréquente Important 18
sanitaire - Eau non potable - Contrat de nettoyage avec des sociétés locales possible
- Défaut d'entretien et de nettoyage des locaux - PSSE inclus un plan d'installation de chantier
- Pollution des eaux : déversement de produits chimiques (fuite - Mise à disposition de bacs de rétention en stockage de produits
de contenant, rupture de conduite, fuite d'un engin) chimiques (sous-traitants)
'- Pollution des sols : déversement de produits chimiques - Respect des procédures internes des clients
Impact Cas limites Très
- Pollution de l'air : dégagement de gaz, vapeurs, poussières - Entretien/réglage des appareils de combustion Inhabituelle 30
environnemental possible sérieux
(NOx, CO, CO2...) - Déclaration des évènements "environnementaux"
- Fiches de données de sécurité des produits disponibles sur site
- Tri obligatoire des déchets porté dans le PSSE
Impact - Consommation des ressources naturelles (eau, électricité, …) - Dimensionnement adapté des installations au design Pratiquement
Permanente Mineur 100
environnemental certain
- Stockage inadapté de produits inflammables, de cartons, de - Moyens de secours du site disponibles ainsi que dans les locaux
papiers CMI (a minima 1 extincteur)
- Mélange/ association de produits incompatibles - Personnel informé de la conduite à tenir en cas d'incendie et EPI
- Travaux par point chaud - Consignes en cas d'incendie/évacuation affichée dans les locaux
- Forte concentration de produits dans l'air d'un local (création - Zone ATEX définie initialement (PSSE)
d'atmosphères - Enlèvement régulier des déchets
explosives dans l'air) - Issues de secours exemptent de toute forme d'encombrement
- Présence de zone ATEX requis
- Installations électriques défectueuses pouvant générer des - Nombre minimum de secouriste requis sur site (1 pour 20) (CMI
échauffements ou des départs de feu et/ou ST) Très
Incendie, Explosion - Impossibilité d'accès aux secours externes - Moyens d'extinction disposé à proximité des travaux par points Inhabituel Occasionnelle 135
sérieux
- Absence de personnel formé aux premiers secours d'urgence chauds
- Impossibilité d'évacuer - Consignes d'interdiction de fumer portée dans le PSSE
 Brûlure, Inhalation de fumées toxique, Intoxication au CO, - Point de rassemblement défini et communiqué au personnel
Perte de connaissance, Perte d'un membre, Décès (PSSE, Safety induction)
 Destruction des installations - Permis de feu établi selon les procédures du clients (+ surveillant)
- Bouteilles de gaz/produits chimiques stockées conformément au
principe de prévention des incendies (incompatibilité, ventilation...)
- Personnel équipé de détecteurs de gaz (CO, O2)

Machines, - Présence de pièces en mouvement (scie, plieuse, presse)  - Gants de protection mécanique à disposition du personnel Inhabituel Inhabituelle Majeur 240
équipements, outils Heurt, écrasement, plaie, contusion, coupure - Détecteurs CO/O2
- Pièces/Outils tranchants (bande…) Coupure, amputation - Consignation des équipements si nécessaire
- Projection de copeaux, fluides, poussières, liée à l’utilisation - Fiches de données de sécurité des produits mis en œuvre
ou au fonctionnement des outils, machines (travaux de disponibles sur site
soudure...)  Irritation oculaire et/ou cutanée, allergie - Fonctionnement des équipements connus par le personnel
respiratoire et/ou cutanée, coupure, plaie, contusion, fracture, - Trousse de secours à disposition sur site
intoxication - Information du personnel (Toolbox meeting ...)
- Présence d'angles rentrants Entraînement, écrasement, - Balisage/consignation en cas de test des équipements
perte d'un membre, décès - Personnel formé et compétent (Job description)
- Zone/pièces chaudes Brûlure
Page 13 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

Type de danger RISQUES (qu’est ce qui peut mal tourner ?) MESURES DE PRÉVENTION Probabilité Exposition Gravité R
- Equipement sous tension Electrisation, électrocution
 Incendie, explosion
 Pollution de l'air
- Transport de charge lourde (équipements, matériel de bureaux…) - Moyens de manutention peuvent être disponible chez les sous-
Manutention  Douleurs musculaires - articulaires, Inflammations, traitants Cas limites
Occasionnelle Sérieux 21
manuelle lombalgies, dorsalgies, Maladie aigue ou chronique, Troubles - A défaut port de charge à deux possible
Musculo-Squelettiques (TMS)
- Collision engin-piéton - Personnel informé et formé aux risques (VCA)
- Chute de la charge (charge mal arrimée/non équilibrée) - Respect des distances de sécurité (triangle de levage)
- Renversement d'engin - Personnel équipé de vêtement portant des bandes
- Ecrasement de personnel rétroréfléchissantes
Manutention  Plaie, Contusion, Fracture, Perte d'un membre, Décès - Signalisation des opérations de levage à charge du responsable Très
de l'opération (Sous/traitant -> CMI et/ou Client et/ou autres Inhabituel Fréquente 270
mécanique & levage sérieux
entreprises)
- Si nécessaire, plan de circulation requise auprès du client
- Toolbox spécifique

- Multiplicités des tâches et des intervenants - Temps de travail limité aux valeurs législatives et réglementaires
- Contraintes des horaires et des délais - Moyen de communication mis à disposition du personnel
- Intensité du travail variable selon les périodes de l'année - Hôpital de proximité indiqué dans le PSSE
- Horaires de repas irréguliers, repas sautés, repas précaires - Assistance médicale via assureur du Groupe CMI SA
- Durée du travail : non respect des limites légales de temps de - Evaluation annuelle des personnels
travail - Retour site/domicile périodique
- Conflits interpersonnels - Sensibilisation du personnel aux risques psychosociaux (journée
Aspects - Isolement mondiale de la sécurité, formation du personnel d'encadrement...) Grande
Fréquente Sérieux 252
psychosociaux - Travail isolé - Enquête Pulse (mesure) vraisemblance
- Stress et psycho-somatisation - Entretien On-to-one (identification)
- Difficulté d'accès aux soins médicaux (en cas de besoin) - Désignation d'une personne de confiance au sein de CMI SA.
- Risque évoqué dans le cadre de l'accueil des nouveaux
collaborateurs (safety induction)
- Suivi médical périodique et visite médicale après absence (21
jours)
- Suivi de l'indicateur d'absentéisme
- Méconnaissance des règles internes CMI/des équipements & - Accueil sécurité-qualité-environnement systématisé préalable à
risques associés tout engagement sur site
- Difficulté d'adaptation - Communication du PSSE du projet
- Défaut d'information, d'accueil - Suivi périodique du personnel (entretien, on-to-one)
- Insécurité de l'emploi - Suivi des formations Client sur site
 Accident, stress, prise de risques accrue, Blessures diverses - Encadrement par le chef de chantier désigné sur site
Personnel saisonnier
- Formations spécifiques requises (VCA, secourisme...) Inhabituel Fréquente Sérieux 126
et/ou temporaire
- Safety induction sur site par les équipes présentes sous la
responsabilité du chef de chantier
- Suivi médical du personnel sollicité y compris pour les externes
- Formation sécurité requise
- Evaluation des connaissances en matière de santé, sécurité,
environnement au moment de la sélection du collaborateur
Rayonnement - Rayonnement gamma (mesures d'épaisseur d'acier) - Personnel informé des risques (risques importés notamment) Inhabituel Inhabituelle Très 90
- Rayonnement infrarouge (four) - Respect des procédures de site & procédure de mise en service sérieux
- Ondes laser (instrumentions sur process) & - Signalisation visuelle et/ou sonore en cas de risque de
électromagnétiques de haute fréquence (pot de zinc, galvaneal) rayonnement
- Ondes et champs électromagnétiques (moteurs, installations - Matériel/installations protégées
du client) - Test de nuit quand risque d'exposition élevé du personnel
Page 14 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

Type de danger RISQUES (qu’est ce qui peut mal tourner ?) MESURES DE PRÉVENTION Probabilité Exposition Gravité R
 Brûlure corporelle, brûlure oculaire, irradiations engendrant - Balisage des zones de travail
des cancers, mutations génétiques, troubles pendant la
grossesse, échauffement/déplacement de
broches/prothèses/pacemaker, décès
Cf. Conduite de véhicule - Plan de circulation communiqué au personnel lorsqu'existant
- Heurt par un engin de chantier ou d'exploitation - Mise à disposition d'un véhicule avec chauffeur lorsque requis Cas limites Très
Risque routier Fréquente 90
- Défaut de plan de circulation au sein de l'entreprise (Inde notamment) possible sérieux
- Vêtements de travail haute-visibilité
- Absence de Plan de prévention - Plan SSE base établi par QSE à destination des équipes projet
- Absence de Safety Manager de site - Organigramme de chantier intégré au PSSE s'il existe
- Non définition des éléments du PIC - Responsabilité de sécurité décrites dans PSSE : charge de
- Choix de sous-traitants sans garanties de sécurité préalable l'application des règles de sécurité au Chef de Chantier en
- Non respect par les sous-traitants des règles de SSE l'absence de Safety Manager désigné
- Défaut d'organisation de Toolbox meeting ou d'inspection de - PSSE communiqué aux sous-traitants
Très
Risques généraux site - Spec de montage intégrant les aspects SSE communiqué Inhabituel Fréquente 270
sérieux
- Défaut de formation du personnel (contractés notamment) préalablement à la signature du contrat
- Défaut de déclaration des - Manuel Toolbox meeting à disposition des équipes de projets et
accidents/incidents/presqu'accidents de chantier
 Accident - Note d'organisation relative à la déclaration des évènements SSE
 Perte de la certification EHS communiquée à l'ensemble du personnel
 Engagement de responsabilité (pénale et/ou civile)
- Insécurité - Personnel a minima bilingue comprenant l'anglais
- Manque d'hygiène - Suivi médical du personnel, vaccination, suivi médical préalable
- Non adaptation culturelle : tenue, consommation d'alcool, au voyage
Socioculturel Inhabituel Fréquente Important 54
comportement sexuel, liberté d'expression politique, religion (foi - Formation élémentaire au voyage
& croyance) - Information voyageur Wagonlit + iSOS
- Difficulté de communication
- Présence de produits Cancérogène Mutagène et toxique pour - Formation du personnel au risque chimique
la Reproduction avérés : amiante, fibres céramiques - Fiches de données de sécurité des produits mis en œuvre
réfractaires, Chrome 6 disponibles sur site
- Substances dangereuses gaz : monoxyde de carbone, oxyde - Risques importés inclus dans le PSSE
d'azote, ozone, phosphore, oxide et acide de souffre, halogène, - Information du personnel (Tool box meeting, PSSE, Spécification
chlore, gaz d'échappement de montage, procédure de mise en service…)
- Substances dangereuses liquides : hydrocarbures - Suivi médical du personnel exposé (SEPP)
aliphatiques et/ou alicycliques, N-hexane, trichloréthylène, - Respect des règles de stockage, utilisation
acide formique, phénols et dérivés halogénés, amines et - Equipements de protection adaptés disponibles (gants, masque,
hydrazines aromatiques, solvants peinture, huiles, graisses, lunettes de sécurité...)
Substances peintures, acide phosphorique, acide chromique - EPI complémentaires si nécessaires (masques FFP3, Grande Très
dangereuses, - Substances dangereuses poussières : scories, fibres combinaison…) Inhabituelle 180
vraisemblance sérieux
émissions, projection minérales artificielles, zinc, ciment, plomb, sélénium, antimoine, - Si nécessaire personnel équipé de détecteur (CO/O2)
magnésium, aluminium - Respect des procédures de site
- Produits émis par les opérations de montage : gaz et fumées - Note relative à l'interdiction d'utilisation de l'amiante à la
des opérations de soudure (classée CMR) conception & rappel du principe de substitution
 Irritation, brûlure, allergie, cancer, atteinte neurologique -
rénale - hépatique, mutations génétiques, troubles pendant la
grossesse, décès
 Incendie, Explosion
Pollution des eaux, du sol, de l'air

Technologique - Intervention dans des installations dangereuses : ex. Seveso - Information initiale du personnel au travers du PSSE Inhabituel Permanente Sérieux 210
(risque) - Sûreté des installations industrielles du client critique - Information du personnel sur les mesures d'urgence relatives au
site (Safety Induction du client et/ou CMI)
Page 15 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

Type de danger RISQUES (qu’est ce qui peut mal tourner ?) MESURES DE PRÉVENTION Probabilité Exposition Gravité R
- Personnel secouriste parmi les équipes de site
Interdit si non sécurité par des protections collectives - Interdiction d'utiliser des harnais de sécurité / charge aux
Envisageable
entreprises sous-traitantes d'assurer la sécurisation des zones de
Travail en hauteur mais peu Fréquente Majeur 120
travail au moyen de protection collective avant tout contrôle/accès
probable
par les équipes CMI
- Impossibilité d'être secouru - Intervention en binôme
 Traumatismes corporels, psychologiques, décès - Personnel intervenant principalement avec du personnel sous- Cas limites
Travail isolé Inhabituelle Majeur 80
traitant possible
- Personnel équipé de moyens de communication
- Mauvaise disposition du matériel du poste de travail (contre un - Equipements mis à disposition du personnel (bureau, siège…)
mur, dos à une fenêtre) - Activité alternée entre bureau et site
- Matériel de travail inadapté : siège, souris, clavier, écran, ...
- Travail prolongé sur ordinateur (plus de 4 heures par jour)
- Mauvaises postures de travail (cou, dos, membres supérieurs)
- Travail statique sans pause
- Sollicitation visuelle (distance œil-écran, taille de la police,
brillance de
Travail sur écran Inhabituel Fréquente Important 54
l'écran, couleur de l'écriture non adaptées...)
- Problème de luminosité (manque d'éclairage, reflet,
éblouissement, problème de contraste, absence de lumière
naturelle...)
 Conséquences physiques : Fatigue visuelle, Céphalées,
Douleur cervicale, Douleurs épaules, coudes, poignets,
Troubles musculo-squelettiques (TMS)
 Conséquences psychologiques : Irritabilité, Stress
- Manque d'oxygène/air raréfié - Personnel équipé de détecteur O2/CO
- Contamination de l'air par des produits/gaz de process (ex: - Procédure/permis établi suivant les modalités de site / analyse de
Travaux en espace Cas limites
fumées…) risque / permis de travail Inhabituelle Majeur 80
confiné ou restreint possible
- Incapacité d'évacuer - Modalités d'intervention établies dans le PSSE
 Asphyxie, décès - Personnel informé des risques
- Vol d'équipement, de documents, documents industriels, de - Locaux mis à disposition du personnel CMI avec possibilité de
matériel fermeture à clef
- Attentat, mouvement de foule, mouvements sociaux, rixes... - Liste des pays interdits, liste des pays déconseillés
Troubles de sécurité - Agression d'un personnel - Enregistrement des personnels à l'ambassade (recommandation
Très
publique, perte &  Stress, blessure, poursuites pénales CMI) Inhabituel Inhabituelle 90
sérieux
dommages - Politique de confidentialité (personnel CMI / Sous-traitants ? - CMI
/ Contractés ?)
- Assistance iSOS
- Enregistrement du personnel à l'ambassade pour de longs séjours
- Problème médical - Instruction de voayge disponible sur Mike
- Incendie/Explosion - Communication Wagonlit sur les risques
- Troubles politiques, naturels, géopolitique - Assistance juridique, médicale et voyage via iSOS - installation de
- Agression l'application sur les téléphones CMI Très
Situations d'urgence 30
confinement sur place, évacuation, rapatriement - Avis au voyageur du ministère des affaires étrangères sérieux
- Procédure d'alerte définie (cf. procédure relative à la déclaration
des évènements OHSE : industry.alert@cmigroupe.com)
- Personnel formé aux premiers secours

Page 16 of 17
RISK ANALYSIS S-A-1-097-094
July 2016– Rev. 2.0
Project Name: Location within Site: Permit No: Permit Type: Date:

Task Description:

Probabilité (P) Cotation Table de criticité


Pratiquement certain 10 Probabilité * Exposition      
Grande vraisemblance 6
Inhabituel 3 100 100 300 700 1500 4000 10000
Cas limites possible 1 60 60 180 420 900 2400 6000
Envisageable mais peu 36 36 108 252 540 1440 3600
probable 0,5 30 30 90 210 450 1200 3000
Presque impossible 0,2 20 20 60 140 300 800 2000
Presque inconcevable 0,1 18 18 54 126 270 720 1800
12 12 36 84 180 480 1200
Exposition ( E) Cotation Détail 10 10 30 70 150 400 1000
Permanente 10 1x/heure 9 9 27 63 135 360 900
Fréquente 6 1x/jour 6 6 18 42 90 240 600
Occasionnelle 3 1x/semaine 5 5 15 35 75 200 500
Inhabituelle 2 1x/mois 3 3 9 21 45 120 300
Rarement 1 3x/an 2 2 6 14 30 80 200
Très rarement 0,5 1x/an 1,5 1,5 4,5 10,5 22,5 60 150
1,2 1,2 3,6 8,4 18 48 120
Gravité (G) Cotation Dommages corporels 1 1 3 7 15 40 100
Catastrophique 100 Décès multiples 0,6 0,6 1,8 4,2 9 24 60
Majeur 40 Decès 0,5 0,5 1,5 3,5 7,5 20 50
Très sérieux 15 Dommages irrréversibles 0,4 0,4 1,2 2,8 6 16 40
Sérieux 7 Accident avec arrêt 0,3 0,3 0,9 2,1 4,5 12 30
Important 3 Traitement médical 0,3 0,25 0,75 1,75 3,75 10 25
Mineur 1 Premier soin 0,2 0,2 0,6 1,4 3 8 20
0,1 0,1 0,3 0,7 1,5 4 10
0,1 0,05 0,15 0,35 0,75 2 5
  1 3 7 15 40 100
            Gravité (G)

Maîtrise du risque (MR) Cotation Priorité des actions Cotation


Non maitrisé > 400 Action dans les plus brefs
Peu maîtrisé 200 < C < 400 délais > 400
Partiellement maîtrisé 100 < C < 200 Action à court terme 200 < C < 400
Relativement maitrisé Action à moyen terme 100 < C < 200
40 < C < 100
Maîtrisé Action à long terme 40 < C < 100
C < 40
Amélioration continue C < 40

Page 17 of 17