Job Safety Analysis

Job Safety Worksheet

Area of Work Considered: PROCUREMENT, CONSTRUCTION & PRE-COMMISSIONING


Job No: PPL-
WORKS FOR GAMBAT (GPF-IV) COMPRESSION PROJECT - Gasco/PPL - 010 Pre JSA Date: June 14,2022 GAM-22-SD-04
Shutdown Works Plan for ATA 2022

3. Jahangir Ahmed ( Mech


1. Aijaz (HSE Advisor PPL ) 2. Hammad Zaidi (Site Engr PPL)
Superintendent)
JSA participants
4. Shamsheer Mushtaq (HSE Team
lead)

Job Location & details:

Manual Excavation
Prepared By: Shamsheer Mushtaq
Distribution:
Reviewed By: Aijaz

Type of Permit Required Additional PPE Requirements


Special tools or equipments required
(Please List)
Cold Work Permit  Excavation Certificate
Hot Work Permit Category 1. Dust Mask  1. Inspected Power/Hand tools
2. Reflecting Vest  2. Standby Vehicle 
3. Full body harness
4. Gloves 
5. Safety Shoes 
6. Safety Helmet
7. Coverall 
Job Safety Analysis

Approved By: Signature: Date:

Report Number Incident Summary

Activity Assessment Form


Manual Excavation for
Residual
Task / Activity Risk Responsi
Hazard Hazard Effect Control Measures Risk
Description Rating bility
Rating
 Follow PPL PTW/excavation certificate
 Identify all utilities underground and mark them on ground.
 Area clearance from relevant PPL authorities.
Asset Damage  Presence of PPL representative at start of excavation. Gasco
Underground
3B  Safety sign boards for awareness. 1B
Cables/services Plant trip
 JSA meeting and Tool Box Talk prior to start of work
Manual 
Excavation

 Use Dust Mask


Dust / Excavated Personnel injury 2B  Dump excavated soil to a safe distance, watering the area.(1.5 m) 1B
material
Job Safety Analysis

Backfilling /  JSA meeting and Tool Box Talk


Reinstatement Improper backfilling Personnel injury 2B  Proper backfilling in marked area 1B Gasco
of area

Personnel injury  Use dust mask


dust 2B 1B

 Periodic rest at work site


 Sufficient drink at work site
Extreme weather Personnel injury
condition
B2  Proper rest or shelter place at site 1A
 Tool talk included precautions to stress and fatigue
Gasco
Housekeeping  JSA meeting and Tool Box Talk
 Proper housekeeping.
Environmental
Non degradable  Proper disposal of waste as per standards of PPL
waste damage
2B 1B
 After backfilling spray water in order to settle down the soil
 Provide waste drums for waste segregation