(JSA) PMO
PROJECT DATE JSA NO. JSA/002/BMC/VII/2023 REV.0
PT. BINTANG MAKMUR JSA TEAM
CONTRACTOR
CEMERLANG (First Named - JSA Team Leader)
JOB TITLE COLD SPLICING PROCESS NAME POSITION SIGNATURE
JSA Team Leader confirm that the risk for job describe have been reviewed and the control measures which are recommended
REFERENCE AND OTHER RELEVANT INFORMATION reduce the risk to tolerable level and I consider it is safe so the job can be proceed.
ERP required, manpower competency requirement, tools &
NAME ARIO NUGROHO PRIHUTOMO
equipment inspection, PTW, PPE, etc.
POSITION SITE COORDINATOR
ERP Tools & Equipment
a. Fire Extinguisher a. Splicing tool kit
SIGNATURE DATE
b. First Aid Kit
I am statisfied that the control measures identified when put into place will reduce the risk to tolerable level. The job/action
Competency / Certificate change is permitted to proceed. CONFIRMED & APPROVED BY PROJECT/SITE COORDINATOR/HSE
a. Company recommendation and acknowledge
NAME
PTW
POSITION HSE MANAGER PMO
PPE
Page 1 of 3
JSA WORK SHEET
JOB TITLE COLD SPLICING PROCESS
Page 2 of 3
JSA WORK SHEET
JOB TITLE COLD SPLICING PROCESS