JOB SAFETY ANALYSIS DATE: 06 / 04 / 2021

Rev: 00

PRINCIPAL CONTRACTOR: SEPCO Arabia Co. SUB-CONTRACTOR NAME: N/A

PROJECT: King Salman International Complex for Maritime ADDRESS: N/A


Industries and Services (Marine & Infrastructures Project
Department)
Work Location: Package 4, 5 & 6 PHONE: N/A

JOB DESCRIPTION: GYPSUM PLASTERING WORKS

Prepared By: Reviewed By: Noted By: Approved By:

Eduardo Gonzales Rao Munsreem Zahoor Ahmed Amjad T. Shadid

SEPCO HSE Supervisor ) SEPCO HSE Manager SEPCO Construction Manager SAPMT HSE Manager
REFERANCES:

 G.I. 2.100 Work Permit System


 Hazard Identification Plan (HIP)
 Construction safety manual (fifth edition,2011)
 Safety Handbook ARAMCO
REQUIRED SAFETY EQUIPMENT & MATERIAL:
Safety helmet, Safety glasses, Safety shoes, Working Gloves, Barrier cones, Warning sign boards, Warning tapes, Fire Extinguisher, First
Aid Kit
EQUIPMENT TO BE USED:
Mobile Crane, Trailer, Boom truck, Forklift, Plaster Spry machine, Power Tools, Hand Tools, etc.

Note:
Changing Conditions and Emergency Procedure: Stop Work, Switch off Equipment, Supervisor Directs Personnel to Nearest Emergency
Exit and Assembly point
Job Safety Analysis SEP-KSIC-JSA-017

REV. No. 00
Gypsum Plastering Works PAGE 2 of 12

SI No LIST OF ACTIVITIES POTENTIAL HAZARD CONTROLS RESPONSIBLE


HAZARDS PARTY
1 Obtaining Method of Statement and  Job specific  Joint inspection of Supervisor and  END Manager
other necessary hazard and safety Permit Receiver to address  Safety Manager.
safety documents precautions are hazards and precautions to be  Const. Manager.
not identified/ done.  Painting Supt /
Assessment and  Approved Method of Statement to Supervisor
required control be explained to all employees and  SA Certified
measures not it must be made available at the Rigger/Permit
communicated to site. Receiver
involved workers  JSA to be made available at the  Safety Officer
which can lead site and communicated to all
/endangered personnel involved in the job.
workers /  Site Engineer should study the
personnel to drawing and information
accident. thoroughly about Installation /
Lifting of 14’’ crude oil pipe and
shall be communicated to the
supervisor. He should ensure that
the appropriate control measures
are implemented in the site.
2 Obtain Permit to Work (PTW)  Failure to obtain  Obtain PTW prior to the  Scaffolding
approved work commencement of the activity/ Inspector /
permit can result in Work permit hard copy to be kept Supervisor
serious available at the work site.  SA Certified
incidents/PTW  Do not start any work preparation Rigger/Permit
violation. until signed permit is in hand. Receiver
 Comply with GI 2.100  Safety Officer
requirements
 Comply with GI 7.028
requirement
Job Safety Analysis SEP-KSIC-JSA-017

REV. No. 00
Gypsum Plastering Works PAGE 3 of 12

3 Hauling / transporting of construction  Unapproved  Only approved plant will be used  Civil Supt /Supervisor
materials like trailers, boom trucks, etc. transport vehicle with access pass to transport  SA-Certified Rigger
heavy load  Equipment
 Use of Non- Coordinator/In charge
approved access  Plant /equipment used will be  Safety Officer
road due to lack of maintained in a good condition.  Permit Issuer/
briefing / Receiver
communication  Licensed and experience drivers
with the driver will be used to carry out this
activity.
 Prohibited
movement of  The loading of equipment will be
vehicle in case of carried out in accordance with
plant emergency. approved documents.

 Blocking of  The weight of any such load will


emergency vehicle be determined to ensure that
routes overloading is prevented.

 Overloading of  All hauling / transporting tackles


Materials shall be pre-inspected and color
coded with third party inspection
 Material falling supporting documents in place.
from the Vehicle
 Ensure Operators MUST NOT
 Reversing / overload Truck with material –
Slewing preventing materials falling off
vehicle.
Communication- All staff shall be
 Contact with briefed Via Tool Box Talk of the
moving plant or Hazards & of the controls-Keeping
vehicles
clear of plant Machines.

• Ensured banks man- Banks man


Job Safety Analysis SEP-KSIC-JSA-017

REV. No. 00
Gypsum Plastering Works PAGE 4 of 12

are appointed- controlling vehicle


movement & preventing persons
entering danger area- operations.

 PPE- ALL persons SHALL wear


the required Safety P.P.E- Hard
Hats/Safety Boots etc.

Ensure Temporary Traffic


Management plan are followed
diligently.

• Where Operator cannot see –


Ensure additional devices were
provided i.e., Mirrors / Reversing
Beepers shall be installed &
working.

• Ensure Daily Pre – Start Check


sheet - Plant Equipment to be
inspected daily – Reporting any
defects.

• Trained Banksman to control


movement of Plant – being in a safe
place – out of danger area.

• Cordon off area – safety Barriers


SHALL be placed preventing
persons entering area + Banksman
to control unauthorized access.
Job Safety Analysis SEP-KSIC-JSA-017

REV. No. 00
Gypsum Plastering Works PAGE 5 of 12

 P.P.E. – All Persons SHALL wear


Hi – Visibility Jackets – being
seen at all times when on site.

 PWAS to be installed in all heavy


equipment. Ensure this devise is
properly working at all times.

4 Using of Forklift for loading / unloading  Overturning Unit,  Observe load limits in cab labels  Equipment
of gypsum materials Uneven surfaces, (and in manufacturer’s manual) Coordinator In –
Mechanical failure  Always wear seatbelt Charged
 Maintain unit level  Safety Officer
 Maintain safe speeds and turning
 Operate on inclines with load
uphill. Travel up inclines in
forward and down in reverse

 Personal injury –  Do not step on tire


slip or fall  Maintain 3 point contact with
steps and handrail
 Wear appropriate footwear and
Ensure footing is clean and dry
 Face unit while entering / exiting
 Make sure personnel are clear of
machine
 Verify horn systems work
 Do not approach unit unless have
eye contact with Operator

 Ensure unit on level, sold ground


 Ensure unit NOT in gear
 Do not overload machine
Job Safety Analysis SEP-KSIC-JSA-017

REV. No. 00
Gypsum Plastering Works PAGE 6 of 12

 Ensure tire pressure is


satisfactory
 Ensure parking brake is set
 Unsecured or
Unstable Load  Ensure load within capacity of unit
 Adjust forks so weight is evenly
distributed
 While loaded, maintain mast tilted
backward
 Ensure load properly secured
 Personnel caught
in between/  Assigned dedicated spotter
crushing injury Moving equipment like forklift
from moving shall have reverse alarm and
equipment PWAS.

 Vision obstruction
for the operator  Clear visibility for the forklift
can lead to major operator required.
incident  Dedicated spotter required
 Do not overload which can affect
visibility of the operator

 Collision and
Damage with Load  Approach load slowly
 Ensure visibility is satisfactory
 Ensure forks are level
 Use front wheels as pivot points
to align forks
 Overhead Power
Lines  Maintain 15’ from overhead lines

5 Surface Preparation - leveling /  Defective of hand /  All power tools shall be  Civil Supt / .
grinding / chipping of surface to be Supervisor
Job Safety Analysis SEP-KSIC-JSA-017

REV. No. 00
Gypsum Plastering Works PAGE 7 of 12

plastered using grinder and hand tools power tools inspected before use  Certified Rigger
Rigging
 Personnel Injury  Tools and equipment monthly Supt/Supervisor
color coding inspection with log  Permit Receiver
 Health Hazards provided
from accumulated
 Personnel to be provided with
dust during appropriate PPE’s, protective
grinding clothing (Disposable coverall),
dust, goggles safety shoes,
 Incompetent helmets, face shield, ear plugs,
person to do the hand gloves, etc.
grinding job
 Proper ventilation during
grinding required.

 Only competent person to do


the grinding works.

 Ensure grinder’s safety handles


and covers are in –place at all
time.

 Conduct training for the workers


with provide competency
identification card required.

6  Unsafe means of  Proper access like ramps,  Civil Supt / .


Plastering Works, using hand tools
access onto the ladders etc. to be provided. Supervisor
such as Shovel, floats & hand trowel
work area  Permit Receiver
etc. and power tools (plaster spry
/Issuer
machine)
 Application of  Safety Officer
 All safety measures /
Gypsum Plastering precautions listed in the Material
Materials (see Safety Data Sheet to be
attached MSDS)
Job Safety Analysis SEP-KSIC-JSA-017

REV. No. 00
Gypsum Plastering Works PAGE 8 of 12

 Health Hazards followed / implemented.

 Personnel to be provided with


appropriate PPE’s, protective
clothing, dust mask, rubber
boots, face shield, ear plugs,
hand gloves, etc. during mixing /
application of Gypsum
Plastering Materials.

 Excess / hardened Gypsum


materials shall be properly
disposed immediately
 Defective of hand /
power tools

 Hand and power tools to be


color-coded / inspected.

 Excess / hardened Gypsum


 Fire hazards materials shall be properly
disposed immediately

 Fire Extinguisher available in the


work area, currently
inspected/color coded.

7 Handling of Gypsum Materials  Non-observance of  Personnel shall be briefed /  Civil Supt / .


(Loading and off-loading from the personnel on trained on proper manual Supervisor
vehicle / boom truck trailer using proper techniques material handling techniques.  Permit Receiver
/Issuer
forklift) in manual handling Demonstrate how to do manual
 Safety Officer
/lifting of materials lifting:
Job Safety Analysis SEP-KSIC-JSA-017

REV. No. 00
Gypsum Plastering Works PAGE 9 of 12

 Back pain  Legs shall carry the weight not


the back.

 Do not bend the back while


picking up a load keep the back
straight.

8 Ergonomics (Manual handling of heavy  Handling aids provided for  Civil Supt /
plastering materials) movement of large / heavy Supervisor
items.
 Permit Receiver /
 Employees trained in how to lift Issuer
safely.  Safety Officer

 Ensure team working, for


moving heavier items (e.g.).

Items lifted must be of small size


and easy to move.
9 Slips, trips and fall; abrasions,  Poor access  Poor lighting provided to the
strains and sprains injuries due to work face, especially in slip and
the below reasons other enclosed areas

 Inadequate  Access ways not suitably


lighting / poor defined or lighted.
illumination
 Area around work area cluttered
with stored materials and /
rubbish – poor housekeeping
 Finished
 Inadequate access for the
painted
painters and their materials
materials being
stacked  All personnel shall be inducted
causing
Job Safety Analysis SEP-KSIC-JSA-017

REV. No. 00
Gypsum Plastering Works PAGE 10 of 12

working area prior to start the work.


congestion
 Good housekeeping – work
areas kept tidy, goods stored
suitably etc.

 Use careful foot placement while


walking on rebar mats and at
decks.

10 Welfare Facilities  Heat Stress  Adequate water coolers with  Civil Supt /Supvr.
 Environmental disposable cups will be provided.  Permit Issuer /
issues  Intermittent breaks to be Receiver
observed  Safety Officer
 Rest shelter near work area to be  Nurse
installed
 Weather condition /temperature
monitoring

 Heat stress awareness of workers


/ preparedness of medical team /
HSSE team.

11 Housekeeping / Permit Close Out  Accumulation of  Remove all the debris from site All
debris daily as minimum. Provide waste
 Slip / tripping fall bins with cover / garbage skips
hazards  Unused material must be piled/
 Access organized or removed from the
obstructions working area
 Work permit not  Designate housekeeping crew
closed accordingly and equipment
 Maintain good housekeeping
standards.
 Inspect / tidy up work area before
Job Safety Analysis SEP-KSIC-JSA-017

REV. No. 00
Gypsum Plastering Works PAGE 11 of 12

closing out permit.


 Ensure each work permit is timely
closed out with plant permit
issuer.

END

S/N Recommendations/Notes Assigned to Designation Phone #


1 All site personnel are required to wear PPE Shoiab Ahmed Safety Supervisor 059 597 1092
2 Conducted toolbox talk prior to start Mubashir Hassan HSE Trainer 059 194 9043
Explain to key personnel the purpose of JSA and enforce the
3
implementation of control.

4 Use JSA to identify hazards.


Eduardo Gonzales Safety Supervisor 054 656 9886

If any injury and near miss occurs, JSA shall be reviewed


5
immediately.

SEPCO
In case of any emergency, Project ERP shall be followed by all
6 Zahoor Ahmed Construction 056 184 7708
personnel.
Manager
Emergency
Emergency Response Procedure Office/Name Designation
Contact Number
1. When reporting an emergency speak slowly, calmly, distinctly, in a SEPCO Emergency N/A 0133425638
Job Safety Analysis SEP-KSIC-JSA-017

REV. No. 00
Gypsum Plastering Works PAGE 12 of 12

clear voice and give information in the following sequence:


2. Dial 0133425639 from the nearest telephone or (0133425638).
3. State that there is an emergency or disaster at your location and tell SAPMT Project
Jawad Ali 055 047 04735
your location. Engineer
SAMPT Safety
4. Tell Your Name_____ and your Badge # ______. Amjad T. Shadid 056 925 8462
Manager
5. Tell about emergency or disaster like you see a fire, car accident, SEPCO Project
Ma Lixing 059 500 2678
major injury, etc. at the following location: _________ Manager
6. Inform that there are _______ (number of) people requiring medical SEPCO HSE
Rao Munsreem 056 909 1498
assistance / attention. Manager
7. Repeat the above Information and answer questions. Do not hang up Ansar Muhammad
until the dispatcher repeats the above or asks for more information. Male Nurse 053 874 9279
Tufail

You might also like