Rev: 00
SEPCO HSE Supervisor ) SEPCO HSE Manager SEPCO Construction Manager SAPMT HSE Manager
REFERANCES:
Note:
Changing Conditions and Emergency Procedure: Stop Work, Switch off Equipment, Supervisor Directs Personnel to Nearest Emergency
Exit and Assembly point
Job Safety Analysis SEP-KSIC-JSA-017
REV. No. 00
Gypsum Plastering Works PAGE 2 of 12
REV. No. 00
Gypsum Plastering Works PAGE 3 of 12
3 Hauling / transporting of construction Unapproved Only approved plant will be used Civil Supt /Supervisor
materials like trailers, boom trucks, etc. transport vehicle with access pass to transport SA-Certified Rigger
heavy load Equipment
Use of Non- Coordinator/In charge
approved access Plant /equipment used will be Safety Officer
road due to lack of maintained in a good condition. Permit Issuer/
briefing / Receiver
communication Licensed and experience drivers
with the driver will be used to carry out this
activity.
Prohibited
movement of The loading of equipment will be
vehicle in case of carried out in accordance with
plant emergency. approved documents.
REV. No. 00
Gypsum Plastering Works PAGE 4 of 12
REV. No. 00
Gypsum Plastering Works PAGE 5 of 12
4 Using of Forklift for loading / unloading Overturning Unit, Observe load limits in cab labels Equipment
of gypsum materials Uneven surfaces, (and in manufacturer’s manual) Coordinator In –
Mechanical failure Always wear seatbelt Charged
Maintain unit level Safety Officer
Maintain safe speeds and turning
Operate on inclines with load
uphill. Travel up inclines in
forward and down in reverse
REV. No. 00
Gypsum Plastering Works PAGE 6 of 12
Vision obstruction
for the operator Clear visibility for the forklift
can lead to major operator required.
incident Dedicated spotter required
Do not overload which can affect
visibility of the operator
Collision and
Damage with Load Approach load slowly
Ensure visibility is satisfactory
Ensure forks are level
Use front wheels as pivot points
to align forks
Overhead Power
Lines Maintain 15’ from overhead lines
5 Surface Preparation - leveling / Defective of hand / All power tools shall be Civil Supt / .
grinding / chipping of surface to be Supervisor
Job Safety Analysis SEP-KSIC-JSA-017
REV. No. 00
Gypsum Plastering Works PAGE 7 of 12
plastered using grinder and hand tools power tools inspected before use Certified Rigger
Rigging
Personnel Injury Tools and equipment monthly Supt/Supervisor
color coding inspection with log Permit Receiver
Health Hazards provided
from accumulated
Personnel to be provided with
dust during appropriate PPE’s, protective
grinding clothing (Disposable coverall),
dust, goggles safety shoes,
Incompetent helmets, face shield, ear plugs,
person to do the hand gloves, etc.
grinding job
Proper ventilation during
grinding required.
REV. No. 00
Gypsum Plastering Works PAGE 8 of 12
REV. No. 00
Gypsum Plastering Works PAGE 9 of 12
8 Ergonomics (Manual handling of heavy Handling aids provided for Civil Supt /
plastering materials) movement of large / heavy Supervisor
items.
Permit Receiver /
Employees trained in how to lift Issuer
safely. Safety Officer
REV. No. 00
Gypsum Plastering Works PAGE 10 of 12
10 Welfare Facilities Heat Stress Adequate water coolers with Civil Supt /Supvr.
Environmental disposable cups will be provided. Permit Issuer /
issues Intermittent breaks to be Receiver
observed Safety Officer
Rest shelter near work area to be Nurse
installed
Weather condition /temperature
monitoring
11 Housekeeping / Permit Close Out Accumulation of Remove all the debris from site All
debris daily as minimum. Provide waste
Slip / tripping fall bins with cover / garbage skips
hazards Unused material must be piled/
Access organized or removed from the
obstructions working area
Work permit not Designate housekeeping crew
closed accordingly and equipment
Maintain good housekeeping
standards.
Inspect / tidy up work area before
Job Safety Analysis SEP-KSIC-JSA-017
REV. No. 00
Gypsum Plastering Works PAGE 11 of 12
END
SEPCO
In case of any emergency, Project ERP shall be followed by all
6 Zahoor Ahmed Construction 056 184 7708
personnel.
Manager
Emergency
Emergency Response Procedure Office/Name Designation
Contact Number
1. When reporting an emergency speak slowly, calmly, distinctly, in a SEPCO Emergency N/A 0133425638
Job Safety Analysis SEP-KSIC-JSA-017
REV. No. 00
Gypsum Plastering Works PAGE 12 of 12