Risk Assessment Risk level A Risk Level B Risk Level C Risk Level D Risk Level E
Standard 16 – 25 10- 15 5- 9 3-4 1-2
Likelihood x Severity Unacceptable Severe Risk Through review required Acceptable Level Acceptable Level
No. Work Activity Hazard Factor & RISK Control Measure & Detailed management Plan RISK
TUWAIQ CASTING & FORGING FACILTY PROJECT
TUWAIQ C&F JOB SAFETY ANALYSIS
GRADE
GRADE
information Environmental impact L S T In Charge Correction Date L S T
3 Rebar fixing and Lifting and carrying heavy 3 4 12 B Wherever possible, a reduction in the amount of Work Crew 3 2 6 C
using scaffolding items heavy manual handling must be sought by providing
platform. adequate mechanical means.
Repetitive lifting
Wear hand gloves when handling rebar steels.
Uneven surface Where an object requires two or more employees to
handle it, one employee should give the direction for
Lifting and carrying on lifting and lowering the object in unison. Never
uneven and / or slippery attempt to lift beyond your capacity. If in doubt test
ground conditions the objects’ weight before handling it: if it appears
too heavy or bulky, obtain a mechanical lifting aid
Homemade tools and/or somebody to help.
Improper manual handling Use appropriate PPE while performing the task such
as eye goggles, hand gloves.
Defective ladder
Homemade tools are not allowed at site
Inadequate supervision During rebar manual transportation employees shall
be aware of his supporting working people.
Pinch point
Supervisor shall always be vigilant during the job
Tripping hazard execution.
Back injury and other Supporting stand for the rebar fabrication shall be in
sprains and strains caused a stable ground
by incorrect manual
handling technique Continuous supervision and safety coverage shall
be ensured throughout the operation
Hand injury All protruding edges must be covered with rebar
caps.
Slips/ Trips and fall injury
Make sure the scaffold is inspected and having
Amputation and crush injury GREEN TAG prior commencing activity.
Cuts or abrasion
Application of full body harness with double lanyard
Bodily injury due to fall like, while working in an elevated area in excess of 1.8
TUWAIQ CASTING & FORGING FACILTY PROJECT
TUWAIQ C&F JOB SAFETY ANALYSIS
fracture, head injury and mtr and above. Ensure proper anchor to safe
sprain anchorage point Ensure proper anchor to safe
anchorage point. Follow 100% tie off policy.
Poor decision, chances of
misusing tools and Leaning, twisting, stooping shall be avoided while
equipment’s working on elevated area.
Back injury and other Do not throw any materials from height.
sprains and strains
Ensure all workers undergone Work at height &
Fall injury hand tool training.
Cut and crush injury Follow proper manual handling techniques while
doing activity.
Fall injury
Only inspected and color-coded ladder to be used
Entrapment for the activity.
Lack of knowledge of Keep the body part away from the line of fire
workplace hazard will lead Identify all possible pinch point hazard. Use
to accident. adequate hand gloves to eliminate pinch point
hazard
Back injury and other Follow manual handling techniques and maintain
sprains and strains proper body posture while doing manual handling
back pain activity.
Work Crew
Night Work use Lack of knowledge of work Where an object requires two or more employees to
6 of Tower Light procedure may lead to
3 3 9 C
handle it, one employee should give the direction for
Field Supervisor 2 3 6 C
accident. lifting and lowering the object in unison. Never
attempt to lift beyond the capacity. Assess the load
Hearing impairment prior lifting. if it appears too heavy or bulky, obtain a
mechanical lifting aid and/or somebody to help.
Environmental pollution
All involved workers shall attend “Manual handling
Eye injury training”.