Subcontractor : RENAISSANCE HEAVY INDUSTRIES JSA Title : JSA for Rockwool installation
1
Approved By : AP HSE Manager AP Construction Manager
S/No Job Steps (Task) Hazard Risk Control Measures Action By Remarks
Work Preparation 1.1 All involved personnel must be project HSE Work Team Leader
1 1. No clear instruction
Communication inducted
2. Language barrier Work Supr.
1.2 PTW shall be initiated one day before the
activity by the appropriate supervisor.
Workers
1.3 A pre-task meeting shall be held with all
personnel involved in the activity to ensure HSE Spr.
that all are aware and understand the
contents of the JSA instruction about
condition change and the PTW, including
actions to be taken in the event of an
emergency.
1.4 Supervisor shall ensure that all personnel
understand their duties and responsibilities.
1.5 Workforce shall be aware of Emergency
Response Plan.
1.6 Area to be barricaded
2.1 Supervisor to ensure all personnel
understand at least one of the languages:
English/Turkish /Arabic
2
Prepare and Mobilize material and
1. Topping of Tubes and accessories
1.1 Do not place materials near access ways Work Team Leader
Personnel to site thereby causing obstruction.
2. Un-authorized persons at site. Work Supr.
1.2 Do not stack materials too high or overload.
Workers
1.3 Area shall be surrounded and putting up
HSE Spr.
Warning Signs.
2
S/No Job Steps (Task) Hazard Risk Control Measures Action By Remarks
Manual handling materials and use 1. Slip, Trip & Fall from same level 5.1. Adequate stacking of materials. Work Team Leader
3
of hand tools 2. Using hands 5.2. Housekeeping shall be a priority, walk and
3. Body movement work areas shall be kept free of scaffold Work Supr.
4. Back injury materials and supplies.
Workers
5. Falling objects 5.3. Ensure all employees use proper PPE i.e.
helmet, safety glasses, gloves and safety HSE Spr.
shoes and specific PPE for Rockwool such as
coverall and mask.
5.4. Employees shall use lifting technique's lift
with legs not their backs. Get help when
needed. Take regular rest
5.5. Reduce frequency of lifting or rotation to the
employee
5.6. Avoid manual handling if possible (use
mechanical equipment ex. Pallet truck,
trolley).
5.7. Proper positioning while working
5.8. Assign trained and experienced persons
5.9. TBT shall be held before starting work
5.10. Ensure Good housekeeping
5.11. Close supervision shall be present.
5.12. Products should be kept dry, if possible in
original packaging.
4 Prepare to Entry into confine spaces Poor knowledge about the kind 1. To Comply with PTW and confined space Work Team Leader
( Compander box, CB Cage A-East of confined space ,confined procedure requirement
Bottom) space procedure ..) 2. Drawing to be provided by AP Work Supr.
Poor communication 3. Gas test to be carried out by Authorized
Workers
Lack of trained person (rescue Gas Tester (AGT ) for testing the oxygen
team ,watchman ..) (19.5-23.5) HSE Spr.
Lack of equipment of rescue 4. Thoroughly assess the area prior to any
plan (safety harness with entry
rope ,ambulance ..) 5. Ensure the work team understand the
Lack of equipment to work safety AP HSE Procedure of 25-010533
( Confine Space Entry ,confined space
3
S/No Job Steps (Task) Hazard Risk Control Measures Action By Remarks
5 To perform the Rock wool installation: 1.1. Dark / Low visibility 1. Adequate lighting shall be provided. (power Work Team Leader
1. In confined space (Compander box, 1.2. Oxygen deficiency / battery operated 24v) if necessary
CB Cage A-East Bottom and inside 1.3. Loss of communication 2. Entrance point must be kept free from any Work Supr.
CB – 8 mt deep from the entrance) 1.4. Poor access and egress obstruction for access route at all times.
Workers
and 1.5. Poor Housekeeping 3. Gas detector to be used by trained person
2. Cutting and re-welding of metal 1.6. Dust in side the confined space at all time HSE Spr.
cover inside CB 1.7. Lack of PPE 4. Stand by man to be present out the
3. Work at Height/Existing platforms of 1.8. Unauthorized Entry confined space at all the time of work and Site Doctor
CB 1.9. Fall from height communicate with the entry person by
proper way and not leave the area before DRIZ Rescue Team
30 min ago off the end of the work
5. Standby man doesn’t enter inside the
confined space
6. Proper housekeeping to be apply to ovoid
slips and trips hazards
7. Only competent inducted personnel shall
be allowed access worksite.
8. Close Supervision shall be provided
9. Proper PPE shall be worn at all times (Wear
goggles if working above shoulders or
4
S/No Job Steps (Task) Hazard Risk Control Measures Action By Remarks
5
S/No Job Steps (Task) Hazard Risk Control Measures Action By Remarks
6
S/No Job Steps (Task) Hazard Risk Control Measures Action By Remarks
temporary itching/inconvenience
6. Use Water, foam, carbon dioxide (CO2), or
dry powder fire extinguisher
7. Preferably, use a knife for cutting. If a
power tool is used, provide effective dust
extraction. Ensure adequate ventilation of
workplace.
8. In the case of coarser fibres there can be
mechanical effects on skin, upper
respiratory system (mucous membranes)
and eyes that can cause temporary, self-
fading effects (e.g. itching). No chemical
effects ensue
9. Workplace exposure limit (WEL) 5mg/m3
gravimetric measure (total inhalable dust)
and 2 fibres/ml airborne fibre limit, 8-hour
time weighted averages. HSE guidance
assumes that the gravimetric measure
would be reached before the fibre
measure. (see SDS ).
6 Adverse Weather Condition Rain 1. All activities at height should be stopped in Work Team Leader
Strong wind adverse weather condition. 18 mph can
Thunderstorm, lighting strike effect balance so this speed limit will be the Work Supr.
Heat stroke /exhaustion and maximum for work at height.
Workers
ultra violet rays. 2. Stop work when weather doesn’t permit. If
there is pure lighting or thunderstorm the HSE Spr.
work at height activities shall be stopped.
3. Weather station availability
7 Housekeeping and Conditions for safe Unsafe materials left at site 1. Proper manual handling method and waste Work foreman
storage. ( tripping hazard ) management procedure shall be full Work team leader
followed
2. To carry out housekeeping before/after the
activity
3. Products should be kept dry, if possible in
original packaging.
7
S/No Job Steps (Task) Hazard Risk Control Measures Action By Remarks