JOB 

SAFETY ANALYSIS

Project Name: INORBIT MALL OFFICE BLOCK

Address: Hitech city, Mind Space, Madhapur

Company Name: RK Interiors CFS (India) PVT Ltd. Activity/Trade: Block work and plastering

Procedure (in steps) Hazards Control Measures


Responsible person
(Break the job down into steps. Each (Identify the hazards associated with each (Describe what action or procedure will be taken to eliminate or
step should accomplish some major step. Examine each to find possibilities that minimise the risk of injury or damage. Use the Hierarchy of
task and be in logical sequence.) could lead to an accident or potential harm Controls below as a guide
arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE
We will ensure experienced person to mobilized for the task
General Planning Inadequate training, inadequate planning, Ensure employees engaged have adequate consultation. Site Supervisor
consultation and improvisation. Ensure sufficient skills (competency) to complete the task correctly.
Injury due to inexperience or failure to Area to be conned off before starting the work.
provide or use appropriate equipment.
JOB SAFETY ANALYSIS

Procedure (in steps) Hazards Control Measures


Responsible person
(Break the job down into steps. Each (Identify the hazards associated with each (Describe what action or procedure will be taken to eliminate or
step should accomplish some major step. Examine each to find possibilities that minimise the risk of injury or damage. Use the Hierarchy of
task and be in logical sequence.) could lead to an accident or potential harm Controls below as a guide
arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE

Mixing of mortar (cement, sand and Skin irritation / allergy. We will ensure Cement and concrete resistant gloves worn by the Site Supervisor/ Safety
water) Cement dust inhalation. workers engaged. Officer
Hand and foot injury. We will ensure rubber concrete resistant or Gum boot worn by the
Flying or falling of cement materials into workers engaged to mitigate foot injury or skin allergy
eyes (eye injury). We will ensure the cement and sand mixed at the place where flow of
Engaging untrained mason in the task. wind is lesser.
Failure in tools (spade). Ensure once the sand and cement put in together water should be
Back pain or injury. poured to avoid fly of dust particles.
Washing the hands, legs and body thoroughly quite often.
Ensure workers engaged are well trained and experienced in the task.
We will ensure the tools used for the tasks are properly inspected
before engaging the task.
We will ensure that work area should be barricaded.
Ensure safety helmet worn by the workers to mitigate head injury.
We will ensure that workers are aware of material safety data sheet and
follow the manufacturer MSDS procedures.
We will ensure full time supervision for the task.
Use Proper PPE while performing the task.
We will ensure job specific PPE.
JOB SAFETY ANALYSIS

Procedure (in steps) Hazards Control Measures


Responsible person
(Break the job down into steps. Each (Identify the hazards associated with each (Describe what action or procedure will be taken to eliminate or
step should accomplish some major step. Examine each to find possibilities that minimise the risk of injury or damage. Use the Hierarchy of
task and be in logical sequence.) could lead to an accident or potential harm Controls below as a guide
arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE

Shifting of mortar from mixing area to Back pain We will ensure two to three workers are mobilized to reduce continual Site Engineer/
working area Work location far from the mortar mixing shifting of cement mixer Safety Officer
area. We will make a pre plan and mix the mortar near the working location
Head injury We will ensure load carry helmets worn by the workers who are all
Over load shifting the mortar
Continual shifting tiredness We will ensure that workers not carrying more than 20 kg of load.
Hit by others workers We will ensure the shifting pathways / accesses / egresses are clear of
Slip / trip / fall loose objects.
No proper access and egress We will ensure workers are wearing rubber hand gloves while carrying
mortar.
We will conduct training to workers usage of wheel barrow / trolley for
shifting mortar mix.
We will ensure good housekeeping maintained at all times.
Ensure Proper PPE for Suitable work.
JOB SAFETY ANALYSIS

Procedure (in steps) Hazards Control Measures


Responsible person
(Break the job down into steps. Each (Identify the hazards associated with each (Describe what action or procedure will be taken to eliminate or
step should accomplish some major step. Examine each to find possibilities that minimise the risk of injury or damage. Use the Hierarchy of
task and be in logical sequence.) could lead to an accident or potential harm Controls below as a guide
arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE

Block laying: Trip We will ensure workers are involved in this activity well trained and Site Supervisor/
Slip experienced persons. Safety Officer
Shifting of block to the work location Fall We will ensure bricks are not thrown in the passage areas.
Improper handling of bricks We will Ensure gloves (cotton grip) are worn by all workers engaged
Over load We will ensure load carry helmet if they are carrying low number of
Hand injury bricks (three to four over mortar pan).
Foot injury We will conduct training to workers usage of wheel barrow to shift
Improper access large amount (10 to 15 pieces).
We will ensure workers getting rest from continual shifting task.
We will ensure the access and pathway is clear from obstructions and
loose objects.
We will ensure the pathway is clear of water accumulation.
Keep away personnel from movement area and provide barricade.
We will ensure Job specific PPE.

The supervisor should give Pre start briefing to the workers regarding
Block work Location Unplanned the tasks and location of the tasks. Site Supervisor
Workers not aware of the location Full time supervision
No supervision Pre plan and make workers stack all materials near to the work
location.
Check for good clothing before commencing the task.
JOB SAFETY ANALYSIS

Procedure (in steps) Hazards Control Measures


Responsible person
(Break the job down into steps. Each (Identify the hazards associated with each (Describe what action or procedure will be taken to eliminate or
step should accomplish some major step. Examine each to find possibilities that minimise the risk of injury or damage. Use the Hierarchy of
task and be in logical sequence.) could lead to an accident or potential harm Controls below as a guide
arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE

Plastering and Splashing cement on the Eye injury Ensure pre start briefing given to workers in task-based manner. Supervisor/
wall Property / object / floor damage Mobilize a supervisor / monitor all time supervision. Site Engineer/
Cement may hit personal working near open Ensure all workers working and helping worn safety goggles. Safety Officer
area Ensure all open objects and equipment is covered (hard barrier) /
Commencing without clearance removed from the location.
Hand injury Ensure no other person working near the location.
Back pain Not to allow other workers to work near the plastering area
Failure in tools Ensure permit taken from the authorized person for commencing the
Low illumination task.
Ensure and instruct use of rubber concrete restraint gloves.
Instruct mason to carry the mortar pan in his hand or to place a stage to
avoid bending down often.
Cover the floors to avoid sticking of mortar.
Ensure and instruct workers to use nose mask.
Ensure eye wash and water available all time near the work location
Isolate the location
Inspect the tools used by the mason before commencing the work.
Ensure proper illumination until the task ends.
JOB SAFETY ANALYSIS

Procedure (in steps) Hazards Control Measures


Responsible person
(Break the job down into steps. Each (Identify the hazards associated with each (Describe what action or procedure will be taken to eliminate or
step should accomplish some major step. Examine each to find possibilities that minimise the risk of injury or damage. Use the Hierarchy of
task and be in logical sequence.) could lead to an accident or potential harm Controls below as a guide
arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE

Scaffolds Falls Scaffolds must be used and inspected in accordance with the Safety Officer
Damaged/Broken Equipment manufacturer’s instruction for each specific model and type of scaffold
Improper Assembly been used.
Improper Use Ensure all wheels equipped locked before climbing, all bolts and nuts
must be tight, and all cotter pins must be in place and secured before
use.
All scaffolds to be erect under the supervision of a scaffold
Experienced person.
When working off scaffolds that are four ft. or more above a
walking/working surface, fall protection, guardrails and handrails are
required.
Ensure newly erected or modified scaffold are been inspected before
commencing in work.
Ensure scaffolding inspection on daily basis checked properly and tag
signed.
Ensure toe board, mid rail, guardrail and working platform all time.
Ensure scaffolds moved to other locations after getting the worker
down from the height.
Use Proper PPE while carrying works.
This HS Risk Assessment takes into account only those potential hazards that exist at the time it was conducted. A revised Risk Assessment will be required if there is a significant change in
working conditions, at critical stages during construction, or when High Risk Construction Work is performed.

Prepared by Reviewed by Approved by

Name: Abdul Shakeel Name: Abdul Raheman Name:

Designation: EHS Officer Designation: Sr. Project Manager Designation:

Signature: Signature: Signature: