JHA Number: JHA-XX-XX Workplace: SPLM Main Deck Company: Supracolines Date: 07 September 2018
Area
Hazard Checklist
Motion Radiation Chemical Pressure Temperature Environmental
Moving objects Radiant heat Hazardous substances Pressured piping Open flame Hot/cold weather
Plant/equipment Sun – UV radiation Dangerous goods Pressurised line Ignition source Windy
Vehicles X-rays Poisons Compressed cylinders Hot or cold surfaces Wet / Water
Vibration Lasers Harmful gases Tanks Liquid s or gases Boggy /uneven ground
NORMS Fibres/dust Hoses Steam Storm
Awkward body posture
Welding arcs Fumes Pumps Friction Lighting (dark, sun
Exerting force
glare)
Repetitive movements
Mechanical Gravity Biological Electrical Noise Psychological
Rotating/moving Falls Animals AC/DC power Equipment noise Stress
equipment/parts Falling objects Insects Static electricity Impact noise Fatigue
Pinch points Dropped loads Viruses Lightning Impact of noise on Rushing
Bacteria communication Trained for task
Slips Power lines
Trips Powered equipment Mind on the job
KEY JOB STEPS WHAT ARE THE HAZARDS? WHAT COULD GO WRONG? WHAT CONTROLS WILL BE PERSON RESPONSIBLE
Job Hazard Analysis
Supraco Lines
EHSMS09 Job Hazard Analysis (JHA) Form
IMPLEMENTED? Name Initial
PREPARATION
- Slip, trip & fall - Personnel injury - PTW and Step Back
Preparing Tools and equipment for unloading
genset. - Cleared the access at work site
- Certified crane operator
- Briefing and share lifting plan
- Place warning sign and
barricade area.
Sea truck approach to barge - Wrong manoeuvre - Equipment damage - Competent personnel.
- Miss understanding / - Personnel injury - Good team work and good
communication communication.
MECHANICAL
Lifting genset from sea truck to main deck of - Slip trip & fall - Equipment damage - Wear PPE (hand glove, body
barge area harness)
- Wrong procedure - Personnel injury - Provide proper procedure and
- Pinched point follow SOP
- Falling object - Competent personnel
- Precaution
- Prepare PTW
- Put warning sign and barricaded
area
- Dedicated signal man
- Using hand stiffy tool
- Using tagline.
Positioning genset on main deck of barge area - Slip trip & fall - Equipment damage - Wear PPE (hand glove, body
harness)
- Pinched point - Personnel injury - Provide proper procedure and
- Falling object follow SOP
- Awkward body posture - Competent personnel
- Precaution
- Wrong Installation
- Prepare PTW
- Put warning sign and barricaded
area
- Dedicated signal man
- Using hand stiffy tool
- Using tagline.
Genset Installation - Slip & Trip Personal Injury, Equipment - Wear PPE (hand glove, body
damage harness)
- Electrical shock - Provide proper procedure and
follow SOP
Job Hazard Analysis
Supraco Lines
EHSMS09 Job Hazard Analysis (JHA) Form
- Pinch point - Competent personnel
- Precaution
- Prepare PTW
- LOTO
Genset running test - Slip & Trip Personal Injury, Equipment - Wear PPE (hand glove, body
damage harness)
- Electrical shock - Provide proper procedure and
- Pinch point follow SOP
- Competent personnel
- Precaution
- Prepare PTW
Housekeeping for equipment and tools - Slip & Trip Personal Injury, Equipment Precautions, good team work,
damage good housekeeping
Remember: EVERYONE has both the authority and responsibility to STOP THE JOB if there is any doubt about the safety of the operation.
Lessons Learned (this is done after the job, to identify any improvements to this JHA, Procedures or the JHA process)
Should a Standard Operating Procedure (SOP) be developed for this task? Yes No
Recommended Improvements:
Names and Signatures of all team members joining the job or change of work team
(certifying they understand the details of the JHA and their personal responsibility in implementing assigned controls)
Supervisor (or Permit Holder for remote work conducted under a Work Permit) approving the use of this JHA: