Topple of
Placer, Engineers,
Authorized operator Site
Hitting work Workmen Only Competent and Authorized
Operators Fitness men, hitting Operators deployed. 3 3 M card should be L Eng./P&M
electrical &
displayed in the cabin. Eng.
lines Machines
Hydraulic system Damaged Engineers, Daily operator pre- inspection 2 2 L P&M Eng.
Hose, Oil Workmen followed.
leakage
Hazard / Environment Aspect Additional Control
Risk / Measures (If the list is Residual
Sl.
Activity Source / Possible People at Existing Control Measures Impact exhaustive, give only Risk / Action By
No
Situation / Act Outcome risk Level a Doc. ref no. of Safe Impact
Work Method)
Opening of placer
arm and checking Slurry Site
Regular Maintenance regime by
of the clamp’s leakage and 2 1 L Eng./P&M
P&M Engineer
connecting the cold joints
pipe line Eng.
Holding the boom Hitting work Tag rope tied with the boom hose.
2 1 L Site Eng.
hose men
Site
Cleaning of Hitting of Ball Provision of ball catcher at the end
3 Ball Passing with of the pipe line 1 L Eng./P&M
placer
pressure Eng.
2 1 L
2. Contain the spillage by spill L
tray. P&M engg
Excessive Noise
Weekly maintenance by the
2 General Noise 1 1 L
P&M Engr
Pollution
Discarded parts collected at
Discarded parts Land & P&M Workshop and disposed 1 1
water to the landfill area. Not L P&M engg
L
Pollution throwing directly on the land &
streams.
Energy Avoid concrete wastage by
Idle Running of consumptio meticulously planning & cross
all M/c n checking with the requirement. 1 1 L
L
P&M engg
Air
Weekly maintenance by the L
Exhaust Pollution 1 1
P&M Engr
emission
ALARP – As Low as Reasonably Practicable.
Note: -
1) All low risk /impact level consider as ALARP level.
2) Medium and high risk can bring down to low risk level with additional control measures. Low risk is only acceptable.
3) All legal requirements consider as significant aspect.
___________________
PM / CM / Section In-charge EHSO