You are on page 1of 3

LARSEN & TOUBRO LIMITED

INFRASTRUCTURE INDEPENDENT COMPANY


Ref: IM-08-B Rev 00
EHS RISK ASSESSMENT

Name of the Project: DMRC CC28 Business Unit: M&D

Activity considered: Boom placer operation. Date:12/06/14

Hazard / Environment Aspect Additional Control


Risk / Measures (If the list is Residual
Sl.
Activity Source / Possible People at Existing Control Measures Impact exhaustive, give only Risk / Action By
No
Situation / Act Outcome risk Level a Doc. ref no. of Safe Impact
Work Method)

Topple of
Placer, Engineers,
Authorized operator Site
Hitting work Workmen Only Competent and Authorized
Operators Fitness men, hitting Operators deployed. 3 3 M card should be L Eng./P&M
electrical &
displayed in the cabin. Eng.
lines Machines

Topple of Daily operator pre- inspection


Preventive Site
Placing of Equipment Placer, Engineers, followed.
1 Vehicle inspection done regularly 3 3 M maintenance to be L Eng./P&M
Boom Fitness Hitting work Workmen as per schedule.
done. Eng.
men
Ground condition should be
checked before start the work.
Ground Condition Topple of Engineers,
Compaction of ground should be 2 3 L Site Eng.
placer Workmen
done at loose pockets.

Hydraulic system Damaged Engineers, Daily operator pre- inspection 2 2 L P&M Eng.
Hose, Oil Workmen followed.
leakage
Hazard / Environment Aspect Additional Control
Risk / Measures (If the list is Residual
Sl.
Activity Source / Possible People at Existing Control Measures Impact exhaustive, give only Risk / Action By
No
Situation / Act Outcome risk Level a Doc. ref no. of Safe Impact
Work Method)

Out riggers should be fully Site


Toppling of extended.
Extending of Out 2 2 L Eng./P&M
Placer Rigid plates should be placed
rigger
beneath the out rigger plate. Eng.

Opening of placer
arm and checking Slurry Site
Regular Maintenance regime by
of the clamp’s leakage and 2 1 L Eng./P&M
P&M Engineer
connecting the cold joints
pipe line Eng.

Hitting of Engineers, Site


Near By Traffic placer boom Proper Barricades, cones with
during Workmen, 2 1 L . L Eng./P&M
flagmen
swinging public Eng.

Relocation of the LT/HT lines from


Operator/ Goal Post should be Site
the area of work
LT/HT overhead provided
workmen/ Permit to work for Electrical H.T. / 4 5 H L Eng./P&M
lines Electrocution Shut Down shall be
L.T. line shall be followed.
Public taken prior to Work. Eng.

Holding the boom Hitting work Tag rope tied with the boom hose.
2 1 L Site Eng.
hose men

2 Concerting Provision of proper jalli cover over


the hopper instructed Site
Placer boom the workmen not to remove the
Crush injury 2 1 L Eng./P&M
hopper cover during operation of the
placer. Eng.

Site
Cleaning of Hitting of Ball Provision of ball catcher at the end
3 Ball Passing with of the pipe line 1 L Eng./P&M
placer
pressure Eng.

Land 1. Use of funnel to fill the


Oil & Fuel spill pollution diesel / Lubricating oil etc.
Hazard / Environment Aspect Additional Control
Risk / Measures (If the list is Residual
Sl.
Activity Source / Possible People at Existing Control Measures Impact exhaustive, give only Risk / Action By
No
Situation / Act Outcome risk Level a Doc. ref no. of Safe Impact
Work Method)

2 1 L
2. Contain the spillage by spill L
tray. P&M engg
Excessive Noise
Weekly maintenance by the
2 General Noise 1 1 L
P&M Engr
Pollution
Discarded parts collected at
Discarded parts Land & P&M Workshop and disposed 1 1
water to the landfill area. Not L P&M engg
L
Pollution throwing directly on the land &
streams.
Energy Avoid concrete wastage by
Idle Running of consumptio meticulously planning & cross
all M/c n checking with the requirement. 1 1 L
L
P&M engg
Air
Weekly maintenance by the L
Exhaust Pollution 1 1
P&M Engr
emission
ALARP – As Low as Reasonably Practicable.
Note: -
1) All low risk /impact level consider as ALARP level.
2) Medium and high risk can bring down to low risk level with additional control measures. Low risk is only acceptable.
3) All legal requirements consider as significant aspect.

___________________
PM / CM / Section In-charge EHSO