You are on page 1of 11

RISK ASSESSMENT FORM

Project: Park Point 5AB Date: 09.07.2019 Reference Number: A59


Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Everistus Chukwumaeze Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR BUILDERS WORK
RISK RATING RISK LIKELIHOOD
RATING

Severity-S Likelihood-L
3 2 1

H Major Injury/ Pollution/ Damage H Likely


3 9 6 3

M Minor/Pollution / Damage/ Loss M Possible Risk Rating


2 6 4 2
6 & 9 = High Risk
L Injury/Low Damage / Loss L Never/Very Unlikely
3 & 4 = Medium Risk
1 3 2 1
1 & 2 = Low Risk

Risk Rating = S X L = R

Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating

Manual handling  Back pain, Work related upper ☒Employees  Approved method Statement / Risk assessment must be in place ☒ Project Manager
A59 of Blocks and lower limb disorders, hand prior to start the work activity
☒ Construction
injuries/ bruises, back, chest  Ensure Job safety analysis (JSA) /Prestart briefing/TBT is given.
(Shifting, Lifting) ☒Contractor Manager
pain  Mechanical aid like Trolley suitable tools and equipment must be
s / Sub used on site ☒ Project Engineer
 Regular breaks should be ensured to limit the frequency of ☒ Foremen
 Cut, skin contamination leading 2 3 6 handling blocks ☒ HSE for monitoring
to dermatitis  Workers should be trained in steps for safe handling of blocks
and proper posture to follow during lifting and shifting of blocks.
1 2 2
 Hand gloves should be worn for firm grip and help prevent cuts
Dust from block debris
 Adequate platform should be provided when shifting blocks on
leading to respiratory work areas
problems, eye irritation  The risks involved should be properly communicated to workers
in regard to the risks involved in bad postures
 Heavy blocks should not be carried by one workers, assistance
should be given by pairing 2 workers to a block. (multiple person
Approved by Name Nasser Ahour Designation Project Manager Signature Date 09-07-19
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible
PIC-HSE-FRM-RA-001
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 09.07.2019 Reference Number: A59
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Everistus Chukwumaeze Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR BUILDERS WORK
RISK RATING RISK LIKELIHOOD
RATING

Severity-S Likelihood-L
3 2 1

H Major Injury/ Pollution/ Damage H Likely


3 9 6 3

M Minor/Pollution / Damage/ Loss M Possible Risk Rating


2 6 4 2
6 & 9 = High Risk
L Injury/Low Damage / Loss L Never/Very Unlikely
3 & 4 = Medium Risk
1 3 2 1
1 & 2 = Low Risk

Risk Rating = S X L = R

Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating

lifting)
 Workers should be selected prior lifting or shifting blocks and only
workers that are fit enough should engage in such.
 Pre-employment screening should be ensured to help detect
those masons that already have ill health effect due to manual
handling and regular health surveillance should be ensured.
 Mask should be worn to prevent dust inhalation, Safety goggles
should be worn to prevent particles from entering the eyes.

A59 Working at height  Manual Handling – Poor postures ☒Employees  Ensure Job safety analysis (JSA) /Prestart briefing/TBT is given. 1 2 ☒ Project Manager
using scaffolding leading Injury to Personnel  Mechanical methods to be used where possible, or multiple ☒ Construction
structure for fixing ☒Contractor person lifting. 2 Manager
 Collapse of scaffolding leading to  Toe board should be put in place around scaffolding structures to
blocks injury, Fatality and damage of s / Sub ☒ Project Engineer
prevent materials/blocks from falling from height
property ☒ Foremen
Approved by Name Nasser Ahour Designation Project Manager Signature Date 09-07-19
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible
PIC-HSE-FRM-RA-001
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 09.07.2019 Reference Number: A59
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Everistus Chukwumaeze Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR BUILDERS WORK
RISK RATING RISK LIKELIHOOD
RATING

Severity-S Likelihood-L
3 2 1

H Major Injury/ Pollution/ Damage H Likely


3 9 6 3

M Minor/Pollution / Damage/ Loss M Possible Risk Rating


2 6 4 2
6 & 9 = High Risk
L Injury/Low Damage / Loss L Never/Very Unlikely
3 & 4 = Medium Risk
1 3 2 1
1 & 2 = Low Risk

Risk Rating = S X L = R

Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating

 Scaffolding should not be overloaded with materials/Blocks and ☒ HSE for monitoring
2 4 8 should be used only for its purpose.
 Heat stress leading to personal ill
 Scaffolding structure used in block work should be inspected
health, fainting, dehydration,
fatality  Manual Handling assessment prior to use of tools. And good
postures should be maintained.
 Fall of materials / blocks from  The risk involved in working under direct sunlight should be well
height leading to body part injury communicated to workers and precautions like taking cool
drinking water, taking rest in shaded area frequently, job rotation,
 Falling of workers from height light clothing appropriate for the weather should be worn etc.
leading to fractures, Fatality  Adequate job planning should be ensured with supervision and
monitoring of task
 Access on scaffolding platform should not be blocked to prevent
slip, trip and falling from height, proper housekeeping
arrangement and material/block stacking should be ensured
 Only competent trained Scaffolders (from Trakhees / DM
approved 3rd party training provider) should erect the scaffolding.
Approved by Name Nasser Ahour Designation Project Manager Signature Date 09-07-19
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible
PIC-HSE-FRM-RA-001
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 09.07.2019 Reference Number: A59
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Everistus Chukwumaeze Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR BUILDERS WORK
RISK RATING RISK LIKELIHOOD
RATING

Severity-S Likelihood-L
3 2 1

H Major Injury/ Pollution/ Damage H Likely


3 9 6 3

M Minor/Pollution / Damage/ Loss M Possible Risk Rating


2 6 4 2
6 & 9 = High Risk
L Injury/Low Damage / Loss L Never/Very Unlikely
3 & 4 = Medium Risk
1 3 2 1
1 & 2 = Low Risk

Risk Rating = S X L = R

Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating

Scaffolding should be erected on Level ground with Guardrail


system (Mid & Hand rail), outrigger, cross bracing, landing
platform for resting, Ladder should be placed at 75 degrees from
base, toe board with green tag to indicate OK to use.
 Blocks should only be place not more than 1 row so as not to
exceed the height of toe boards.
 Workers should use full body harness and should anchor
regularly when doing block work at height.
A59 Cutting of Blocks  Manual Handling – Back injury/ ☒Employees  Ensure Job safety analysis (JSA) /Prestart briefing/TBT is given. ☒ Project Manager
using Block Strain/ Sprain  Close monitoring and supervision to be ensured by supervisors ☒ Construction
 All cables must be routed through ELCB, Inspection should be
cutting Machine /  Contact with sharp moving parts,
☒Contractor Manager
made on the cable and machine prior to use. Use only 110 volt
Table Cutter / Entanglement of loose clothing in s / Sub power tools. ☒ Project Engineer
2
Hand Saw rotating parts leading to cuts,  All rotating parts should be covered with suitable guards. The ☒ Foremen
lacerations, amputation of 1 2
cutting blade RPM & dia should be matched with the cutting ☒ HSE for monitoring
workers. equipment.
2 3 6
Approved by Name Nasser Ahour Designation Project Manager Signature Date 09-07-19
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible
PIC-HSE-FRM-RA-001
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 09.07.2019 Reference Number: A59
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Everistus Chukwumaeze Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR BUILDERS WORK
RISK RATING RISK LIKELIHOOD
RATING

Severity-S Likelihood-L
3 2 1

H Major Injury/ Pollution/ Damage H Likely


3 9 6 3

M Minor/Pollution / Damage/ Loss M Possible Risk Rating


2 6 4 2
6 & 9 = High Risk
L Injury/Low Damage / Loss L Never/Very Unlikely
3 & 4 = Medium Risk
1 3 2 1
1 & 2 = Low Risk

Risk Rating = S X L = R

Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating

Use of power  Loose clothing should be avoided.


tools  Noise/Vibration - Hand Arm  Equipment should be regularly maintained to prevent noise and
Vibration, Vibration White Finger ear protective devices should be worn
(VWF), WRULD’s Noise Induced  Job rotation with frequent breaks should be put in place to help
Hearing Loss, Tinnitus reduce noise exposure
 Exclusion zone should be put in place around block cutting area
 Electric shock due to damaged and signage to be ensured.
cables, Fire from damaged cables  Only trained operatives should be allowed to use the block cutting
machine
 Dusts from block debris resulting  Disposable clothing should be worn and disposed after work to
to eye irritation, skin infection prevent contamination of skin.
(dermatitis)  PPE – Safety goggle, Hand gloves, Mask should be provided
 Operatives should be trained in steps for safe handling of blocks
and proper posture to follow during lifting and shifting of blocks
 Cables should be properly routed on cable stand, Housekeeping
should be carried out regularly and all materials / waste blocks
Approved by Name Nasser Ahour Designation Project Manager Signature Date 09-07-19
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible
PIC-HSE-FRM-RA-001
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 09.07.2019 Reference Number: A59
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Everistus Chukwumaeze Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR BUILDERS WORK
RISK RATING RISK LIKELIHOOD
RATING

Severity-S Likelihood-L
3 2 1

H Major Injury/ Pollution/ Damage H Likely


3 9 6 3

M Minor/Pollution / Damage/ Loss M Possible Risk Rating


2 6 4 2
6 & 9 = High Risk
L Injury/Low Damage / Loss L Never/Very Unlikely
3 & 4 = Medium Risk
1 3 2 1
1 & 2 = Low Risk

Risk Rating = S X L = R

Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating

debris should be removed to prevent slip risks


 Operatives should be trained in the use of portable electrical tools
and should ensure that if possible they should use
battery/cordless tools (low voltage), use of 110v tools using step
down transformer.
A59 Mechanical mixing  Manual Handling – Back injury/ ☒Employees  Ensure Job safety analysis (JSA) /Prestart briefing/TBT is given. 1 2 2 ☒ Project Manager
of cement and Strain/ Sprain  Close monitoring and supervision to be ensured by supervisors ☒ Construction
 All cables must be routed through ELCB, Inspection should be
sand using  Contact with sharp moving parts,
☒Contractor Manager
made on the cable and machine prior to use.
Mortar / Steel Entanglement of loose clothing in s / Sub ☒ Project Engineer
 All rotating parts should be covered with suitable guard
drum concrete rotating parts leading to cuts,  Loose clothing should be avoided. ☒ Foremen
lacerations, amputation of 2 3 6
Mixer  Equipment should be regularly maintained to prevent noise and ☒ HSE for monitoring
workers. ear protective devices should be worn
 Job rotation with frequent breaks should be put in place to help
 Noise/Vibration - Hand Arm reduce noise exposure
Vibration, Vibration White Finger  Exclusion zone should be put in place around block cutting area
Approved by Name Nasser Ahour Designation Project Manager Signature Date 09-07-19
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible
PIC-HSE-FRM-RA-001
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 09.07.2019 Reference Number: A59
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Everistus Chukwumaeze Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR BUILDERS WORK
RISK RATING RISK LIKELIHOOD
RATING

Severity-S Likelihood-L
3 2 1

H Major Injury/ Pollution/ Damage H Likely


3 9 6 3

M Minor/Pollution / Damage/ Loss M Possible Risk Rating


2 6 4 2
6 & 9 = High Risk
L Injury/Low Damage / Loss L Never/Very Unlikely
3 & 4 = Medium Risk
1 3 2 1
1 & 2 = Low Risk

Risk Rating = S X L = R

Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating

(VWF), WRULD’s Noise Induced and signage to be ensured.


Hearing Loss, Tinnitus  Only trained operatives should be allowed to use the block cutting
machine
 Electric shock due to damaged  Disposable clothing should be worn and disposed after work to
cables, Fire from damaged cables prevent contamination of skin.
 Cement bag waste material should be properly disposed to
 Dusts from block debris resulting prevent becoming source of ignition as combustible materials
to eye irritation, skin infection  PPE – Safety goggle, Hand gloves, Mask should be provided,
(dermatitis) rubber shoes
 3rd party inspection should be carried out on mortar mixer and
 Soil pollution due to cement regular planned maintenance, inspection to be ensured
particles  Operatives should be trained in steps for safe handling of blocks
and proper posture to follow during lifting and shifting of blocks
 Cables should be properly routed on cable stand, Housekeeping
should be carried out regularly and all materials / waste blocks
debris should be removed to prevent slip risks
Approved by Name Nasser Ahour Designation Project Manager Signature Date 09-07-19
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible
PIC-HSE-FRM-RA-001
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 09.07.2019 Reference Number: A59
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Everistus Chukwumaeze Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR BUILDERS WORK
RISK RATING RISK LIKELIHOOD
RATING

Severity-S Likelihood-L
3 2 1

H Major Injury/ Pollution/ Damage H Likely


3 9 6 3

M Minor/Pollution / Damage/ Loss M Possible Risk Rating


2 6 4 2
6 & 9 = High Risk
L Injury/Low Damage / Loss L Never/Very Unlikely
3 & 4 = Medium Risk
1 3 2 1
1 & 2 = Low Risk

Risk Rating = S X L = R

Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating

 Ground should be protected during manual mixing of cement to


prevent soil contamination.
 Dispose the waste mortar block pieces as per waste management
rules and regulations.
A59 Shifting of blocks,  Falls of blocks / Cement bags –  Ensure Job safety analysis (JSA) /Prestart briefing/TBT is given. 1 2 2 ☒ Project Manager
cement bags at personal injury, Fatality damage to ☒Employees  Active and continuous supervision should be ensured by the ☒ Construction
property concerned foreman for block work
height on slabs Manager
 Only physically fit workers should be allowed to shift materials
using Cranes  Failure of Lifting accessories ☒Contractor manually. ☒ Project Engineer
3 3 9
leading to collapse of material s / Sub  Lifting cage only should be used in shifting blocks and should be ☒ Foremen
lifting cage, wooden pallet leading inspected by 3rd party with certificates. ☒ HSE for monitoring
to fatality, personal injury, damage  Only trained, certified and experienced riggers should be
of property allocated for slinging and rigging operation.
 During shifting by equipment the areas must be barricaded.
 During shifting blocks in wooden pallet, use net or boards at sides
to prevent blocks from falling.
Approved by Name Nasser Ahour Designation Project Manager Signature Date 09-07-19
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible
PIC-HSE-FRM-RA-001
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 09.07.2019 Reference Number: A59
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Everistus Chukwumaeze Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR BUILDERS WORK
RISK RATING RISK LIKELIHOOD
RATING

Severity-S Likelihood-L
3 2 1

H Major Injury/ Pollution/ Damage H Likely


3 9 6 3

M Minor/Pollution / Damage/ Loss M Possible Risk Rating


2 6 4 2
6 & 9 = High Risk
L Injury/Low Damage / Loss L Never/Very Unlikely
3 & 4 = Medium Risk
1 3 2 1
1 & 2 = Low Risk

Risk Rating = S X L = R

Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating

 Foremen must ensure that the area to be left in safe condition at


end of the activity.
 Stacking of blocks must not block the access
 Lifting supervisor should be ensure that lifting plan / permit is put
in place prior lifting.
 The operator of the crane should be competent, (trained,
experienced and have enough skill in lifting operation)
 The load / block to be carried should not be more than the safe
working load of the crane.
 Tagline should be placed on the load to help direct/balance the
load to drop point during shifting.
 Loading bay should be put in place to help move load from
different floors of the building.
A59 Curing activities  Noise/Vibration - Hand Arm  Ensure Job safety analysis (JSA) /Prestart briefing/TBT is given. 2 ☒ Project Manager
Vibration, Vibration White Finger ☒Employees  Close monitoring and supervision to be ensured by supervisors 2 ☒ Construction
Water Spraying, (VWF), WRULD’s Noise Induced 2 2 4  Job to be properly planned to ensure adequate PPE are used 1
Approved by Name Nasser Ahour Designation Project Manager Signature Date 09-07-19
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible
PIC-HSE-FRM-RA-001
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 09.07.2019 Reference Number: A59
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Everistus Chukwumaeze Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR BUILDERS WORK
RISK RATING RISK LIKELIHOOD
RATING

Severity-S Likelihood-L
3 2 1

H Major Injury/ Pollution/ Damage H Likely


3 9 6 3

M Minor/Pollution / Damage/ Loss M Possible Risk Rating


2 6 4 2
6 & 9 = High Risk
L Injury/Low Damage / Loss L Never/Very Unlikely
3 & 4 = Medium Risk
1 3 2 1
1 & 2 = Low Risk

Risk Rating = S X L = R

Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating

Water storage in Hearing Loss, Tinnitus prior start e.. Hand gloves, Rubber shoes to prevent water from Manager
tank, use of hose ☒Contractor entering the leg which can cause foot problems ☒ Project Engineer
 Trip, slip and fall resulting to injury s / Sub  Water Storage tank should be assessed to prevent formation of
pipe Legionella bacteria due to stagnation of water for long period of ☒ Foremen
time. Hence the water should flow regularly from the water ☒ HSE for monitoring
storage tank.
 The pumping machine should be well protected from noise and
maintenance should be done regularly.
 The rotating parts of the curing machine should be protected with
guard to prevent entanglement.
 The water hose should be inspected to prevent leakage, waste of
water and water logging of the workplace which can cause slip
injury.
 The water hose should be properly routed to prevent trip hazard
and good housekeeping to be ensured

Approved by Name Nasser Ahour Designation Project Manager Signature Date 09-07-19
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible
PIC-HSE-FRM-RA-001
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 09.07.2019 Reference Number: A59
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Everistus Chukwumaeze Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR BUILDERS WORK
RISK RATING RISK LIKELIHOOD
RATING

Severity-S Likelihood-L
3 2 1

H Major Injury/ Pollution/ Damage H Likely


3 9 6 3

M Minor/Pollution / Damage/ Loss M Possible Risk Rating


2 6 4 2
6 & 9 = High Risk
L Injury/Low Damage / Loss L Never/Very Unlikely
3 & 4 = Medium Risk
1 3 2 1
1 & 2 = Low Risk

Risk Rating = S X L = R

Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating

Approved by Name Nasser Ahour Designation Project Manager Signature Date 09-07-19
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible
PIC-HSE-FRM-RA-001

You might also like