RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Risk Matrices

1. Assessment of Severity – with the existing risk controls in consideration, each Risk Assessment Team (RAT) member is to rate the most likely severity outcome of
the possible injury or ill-health identified: see Table 1 below.

Table 1
Severity (S) Description
(5) Catastrophic Fatality, fatal diseases or multiple major injuries.
Serious injuries or life-threatening occupational disease (includes amputations, major fractures, multiple injuries, occupational
(4) Major
cancer, acute poisoning).
Injury requiring medical treatment or ill-health leading to disability (includes lacerations, burns, sprains, minor fractures, dermatitis,
(3) Moderate
deafness, work related upper limb disorders).
(2) Minor Injury or ill-health requiring first-aid only (includes minor cuts and bruises, irritation, ill-health with temporary discomfort).
(1) Negligible Not likely to cause injury or ill-health

2. Assessment of Likelihood – with the existing risk controls in consideration, each Risk Assessment Team (RAT) member is to rate the likelihood hazard that may
cause the possible injury or ill-health: see Table 2 below.

Table 2
Likelihood (L) Description
(1) Rare Not expected to occur but still possible.
(2) Remote Not likely to occur under normal circumstances.
(3) Occasional Possible or known to occur.
(4) Frequent Common occurrence.
(5) Almost Certain Continual or repeating experience.

2
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 3 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

3. Risk Matrix provides the useful framework to classify risks identified: see Table 3 below.

Table 3

Likelihood (L)
(1) Rare (2) Remote (3) Occasional (4) Frequent (5) Almost Certain
Severity (S)
(5) Catastrophic (5) Medium (10) Medium (15) High (20) High (25) High
(4) Major (4) Medium (8) Medium (12) Medium (16) High (20) High
(3) Moderate (3) Low (6) Medium (9) Medium (12) Medium (15) High
(2) Minor (2)Low (4) Medium (6) Medium (8) Medium (10) Medium
(1) Negligible (1) Low (2) Low (3) Low (4) Medium (5) Medium
[Risk Level: H = High Risk (15 ~ 25) M = Medium Risk (4 ~ 14) L = Low Risk (1 ~ 3)]

4. Action for Risk Level – the following actions are to be implemented based on the current Risk Level, as shown in Table 4 below.

Table 4

Risk Level Risk Acceptability Recommended Actions


- No additional risk control measures may be needed.
Low Risk Acceptable - Frequent review and monitoring of hazards are required to ensure that the risk level assigned is accurate
and does not increase over time.
- A careful evaluation of the hazards should be carried out to ensure that the risk level is reduced to as low as
reasonably practicable (ALARP) within a defined time period.
Medium Risk Tolerable - Interim risk control measures, such as administrative controls or PPE, may be implemented while longer
term measures are being established.
- Management attention is required.
- High Risk level must be reduced to at least Medium Risk before work commences.
- There should not be any interim risk control measures. Risk control measures should not be overly
High Risk Not acceptable dependent on PPE or appliances.
- If practicable, the hazard should be eliminated before work commences.
- Management review is required before work commences.

3
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 4 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Risk Control

Hierarchy of Control

The control of hazards and reduction of risks can be accomplished by following the WSH Hierarchy of Control (see Figure 1). These control measures are not
usually mutually exclusive. Generally, it may be more effective to use multiple control measures, for example, engineering controls work better with
administrative controls like training and Safe Work Procedures.
Figure 1

4
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 5 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Inventory of Work Activities and Hazard Identification:

S/No. Process / Location: Work Activities


1) MOBILIZATION & DEMOBILISATION- MATERIAL OR EQUIPMENT
1 Installation of Gas Pipe
1.1 Mobilization of personnel and equipment on site
1.2 Lorries making deliveries of pipe to site
1.3 Loading/ unloading of equipment / materials on site

2) STORAGE
2.1 Storage of materials on site

3) DRILLING WORKS
3.1 Drilling of holes into concrete slabs using hand drills

4) INSTALLATION WORKS
4.1 Installation of brackets

5) CUTTING WORKS
5.1 Cutting of pipes using fibre cutter

6) PIPE THREADING WORKS


6.1 Threading of pipes

7) WORKING AT HEIGHTS
7.1 Working at heights using platform ladder / A frame ladder
7.2 Working at heights using scissor lift- (Appointment letter with pass)

8) LIFTING WORKS
8.1 Lifting and installation of pipes (manually)

9) PAINTING WORKS
9.1 Application of touch up paint using roller or paint brush- (SDS for paint)

5
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 6 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

10) AIR COMPRESSURE TESTING


10.1 Pressure testing using air- (5-40 Psi)

11) MAINTENANCE WORK


11.1 Maintenance work with equipment/machinery

12) HOT WORKS


12.1 Welding for API gas pipe joints
12.2 Cutting of pipes using grinder cutter

13) GI JACKETING WORKS


13.1 Drill works of GI sheet use battery drill
13.2 Cutting of GI sheet by snip cutter
13.3 Seal up with rivet and silicon
14) EMERGENCY OCCURRENCE
14.1 Emergency occurrence during works.

15) HOUSE KEEPING


15.1 House keeping

16) NIGHT WORKS AFTER OFFICE HOUR


16).1 Emergency occurrence during works

17) HUMAN FACTOR(FOREIGN WORKERS WHO ARE NOT FAMILIAR WITH THE LOCAL
WORKING ENVIRONMENT
17.1 Housekeeping
17.2 Storage of equipment

18) WORKING UNDER ADVERSE WEATHER( EXPOSURE TO HOT WEATHER, LIGHTNING &
HAZY CONDITION
18.1 Emergency occurrence during works

6
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 7 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

19) FIRE / EMERGENCY EVACUATION


19.1 Housekeeping

20) TERRORISM THREAT


20.1 Terrorism Threat

21) COVID-19
21.1 COVID-19 Coronavirus

7
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 8 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
1) MOBILIZATION & DEMOBILISATION- MATERIAL OR EQUIPMENT
1.1 Mobilization of Untrained Injury to the 1) Elimination : NA 1) Elimination :NA Pichit (Project On Going
personnel and personnel personnel/ 2) Substitution: NA 2) Substitution: NA Manager)
equipment on site Property 3) Engineering - NA 3) Engineering -NA
damage 4) Administration: 4) Administration: Tool box Chandra (Site
 Pre-job meeting. meeting to be conducted daily Supervisor)
 Safety induction and train personnel for the to briefing & training.
work activities including statutory 5) PPE: NA
requirements (Trained, Qualified and
Authorized).
 All site personnel to attend maincon safety 4 2 8 4 1 4
induction course.
 Tool box meeting to be conducted daily to
briefing & training.
5) PPE:
 Must to verify and ensure Boots, helmets,
safety harness is issued

1.2 Delivery lorries Person hit by Injury to personnel / 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
making deliveries of delivery truck damage to 2) Substitution: NA 2) Substitution: NA Manager)
pipes and fittings to /lorry crane due property/loss of life 3) Engineering -NA 3) Engineering -NA
site using fork lift. to poor traffic 4) Administration: 4) Administration: Chandra (Site
management  comply with main con traffic management  supervisor to supervise @ Supervisor)
plan remind workers of any
 Follow the main con traffic controller obstruction /people training
instruction.  ensure vehicle is park and
 Only qualified & authorised driver should handbrake applied and wheel
be permitted to drive transport vehicle. 5 2 10 choke to be put on to prevent 5 1 5
 Vehicle to travel up to 10km/h while within any movement of vehicle
the work site 5) PPE: NA
 Banks man guide truck /lorry when
reversing
5) PPE:
 Must wear safety shoes, hand gloves and
safety helmet at all time.

8
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 9 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
1.3 Loading/ unloading Manual Back injury or strain 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
of equipment / handling of crushing/pinching of 2) Substitution: NA 2) Substitution: use appropriate Manager)
materials on site material moving hands and fingers 3) Engineering -NA equipment such as cranes, fork
of heavy and or crushing of feet or 4) Administration: NA lift or pallet jacks Chandra (Site
bulky material toes overhead 5) PPE: 3) Engineering -NA Supervisor)
tools and hazards  Wear safety shoes ,hand gloves and safety 4) Administration: use proper
equipment helmet at all time lifting techniques .ask for help
or assistance when moving
heavy or bulky objects
3 3 9 3 2 6
5) PPE: NA

2) STORAGE OF MATERIALS
2.1 Storage of Materials Toppling of Injury to personnel/ 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
on site (Pipes and stacked damaged to property 2) Substitution: NA 2) Substitution: NA Manager)
fittings) materials in 3) Engineering -NA 3) Engineering -NA
designate area 4) Administration: 4) Administration: Chandra (Site
 All pipes are to be stacked not taller than 1  All lose materials to be stored Supervisor)
meter in boxes and covered.
 Guarding barrier to be placed for stacked 5) PPE :NA
pipes
 Storage area is to be barricaded up to keep
unauthorized entry.
5) PPE : 4 2 8 4 1 4
 Must wear safety shoes, hand gloves and
safety helmet at all time.

9
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 10 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
Stored materials Physical 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
are falling injuries/body parts 2) Substitution: NA 2) Substitution: NA Manager)
though open injuries 3) Engineering -NA 3) Engineering -NA
sides of the 4) Administration: 4) Administration: Chandra (Site
building or floor  All materials are to be stacked at least 1.5 m  Workers are reminded during Supervisor)
opening on away from any edge of the building. daily toolbox meeting of
other floors.  All floor openings are to be barricaded and storage of materials
covered to prevent any materials from 5) PPE :NA
falling through.
3 2 6 3 1 3
5) PPE :
 Must wear safety shoes, hand gloves and
safety helmet at all time.

3) DRILLING
3.1 Drilling of holes Using faulty electric shock (skin 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
into concrete slabs drill or coming or body injuries) 2) Substitution: NA 2) Substitution: NA Manager)
using hand drill in contact with 3) Engineering -NA 3) Engineering -NA
(Ceiling) damaged wires 4) Administration: 4) Administration: Chandra (Site
 Pre site inspection to be carried at area of  Provide and attend training Supervisor)
work to ensure there is not hidden services  Ensure electrical cord has no
lines. defects and hangs 2m above
 Electrical tools are to be protected by RCCB the ground level on non-
or double insulated. conductive supports.
 LEW to conduct monthly check on it that it  Sockets of approved types and
is in good working condition. 4 2 8 of correct colour (industrial 4 1 4
 Compatibility of source voltages and tools type plugs/ receptacles) are to
are to be verified before use. be used
 Storeman is to check all hand tools is to e 5) PPE:NA
send to LEW for repairs.
5) PPE:
 Must wear safety shoes, hand gloves and
safety helmet at all time.

10
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 11 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
Debris and Dust Eye/ head injuries, 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
generated by ill health due to dust 2) Substitution: NA 2) Substitution: NA Manager)
Drilling over exposure 3) Engineering -NA 3) Engineering -NA
4) Administration: 4) Administration: NA Chandra (Site
 No cotton gloves to be used when using 5) PPE :NA Supervisor)
hand tools with rotating parts.
 Attach a small container to the hand drill to
prevent dust from flying.
5) PPE :
 Must wear safety shoes, hand gloves, dust 4 2 8 4 1 4
mask, safety goggles and safety helmet at all
time.

4) INSTALLATION OF BRACKETS
4.1 Installation of Worker lose his Head injuries to 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
brackets hold on the passer-by / Property 2) Substitution: NA 2) Substitution: NA Manager)
brackets while damage 3) Engineering -NA 3) Engineering -NA
installation 4) Administration: 4) Administration: Chandra (Site
 Area below installation of brackets is to be  Workers are to be reminded Supervisor)
barricaded up during TBM to firmly secure
 Banks man is to be deployed there to keep in one end of brackets before
others from walking in the work area letting of their hand
 House-keeping to be done. 5) PPE :NA
5) PPE : 4 2 8 4 1 4
 Must wear safety shoes, hand gloves and
safety helmet at all time.

11
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 12 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
5) CUTTING OF PIPES
5.1 Cutting of Pipes Using faulty Electric shock (body 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
using Fiber Cutter fiber cutter or parts injuries like 2) Substitution: NA 2) Substitution: NA Manager)
coming in hand or skin 3) Engineering -NA 3) Engineering -NA
contact with injuries) 4) Administration: 4) Administration: Chandra (Site
damaged wires  LEW to conduct monthly inspection of all  Signage on how to use the Supervisor)
electrical tools and installations. material and list of DO’s and
 Supervisor has to ensure the machine is in DON’Ts of the machine to be
good and working condition. The safety placed visible to the operator.
guard should be properly in place.  Workers to be trained on the
 Compatibility of source voltages and tools use of cutter.
are to be verified before use.  Storeman to check for any
 Electrical cord should have no defects and visual defects for equipment. If
hangs 2m above the ground level and on 3 2 6 damaged, to remove from site. 3 1 3
nonconductive supports.  Before use, workers are to
 Sockets of approved types and of correct check if equipment is in good
color (industrial type plugs/receptacles) are working condition.
to be used. 5) PPE :NA
 Electrical tools are to be protected by RCCB
or double insulated.
 Apply PTW.
5) PPE :
 Must wear safety shoes, hand gloves and
safety helmet at all time.

Coming in Hand/ eye injuries 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
contact with the 2) Substitution: NA 2) Substitution: NA Manager)
blade 3) Engineering -NA 3) Engineering -NA
4) Administration: 4) Administration: Chandra (Site
 Provide training on the use of machines.  Provide and attend training on Supervisor)
 Installation of Machine Guard the use of machine
 Proper PPE are worn while at work 5) PPE :NA
5) PPE : 3 2 6 3 1 3
 Must wear safety shoes, hand gloves and
safety helmet at all time.

12
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 13 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
Accident turn Amputation / 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
on speed cutter cuts/lacerations 2) Substitution: NA 2) Substitution: NA Manager)
while changing 3) Engineering -NA 3) Engineering -NA
blades 4) Administration: 4) Administration: Chandra (Site
 Only trained supervisors and workers are  Replace noisy mechanical Supervisor)
allowed to do the changing blades. parts.
 Workers are to make sure the power supply 4 2 8  Proper and regular 4 1 4
of the sped cutter has been disconnected maintenance of equipment and
before changing blades. tools to be done.
5) PPE : 5) PPE :NA
 Must wear safety shoes, hand gloves and
safety helmet at all time.

6) PIPE THREDING WORKS


6.1 Threading of Pipes Using faulty Mild Electric shock 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
threading 2) Substitution: NA 2) Substitution: NA Manager)
machine or 3) Engineering -NA 3) Engineering -NA
coming in 4) Administration: 4) Administration: Chandra (Site
contact with  LEW to conduct monthly inspection of all  Implement logout / tag out Supervisor)
damaged wires electrical tools and installations. procedure.
 Compatibility of source voltages and tools  Provide and attend training.
are to be verified before use. 5) PPE :NA
 Electrical cord should have no defects and
hangs 2m above the ground level and on
nonconductive supports.
 Sockets of approved types and of correct
colour (industrial type plugs/receptacles) are
to be used. 4 2 8 4 1 4
 Electrical tools are to be protected by RCCB
or double insulated.
5) PPE :
 Must wear safety shoes, hand gloves and
safety helmet at all time.

13
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 14 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
7) WORK AT HEIGHT ACTIVITIES
7.1 Work-At-Height - Using ladder on Superficial cuts/ 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
Use platform unstable floors sprains 2) Substitution: NA 2) Substitution: NA Manager)
3) Engineering -NA 3) Engineering -NA
4) Administration: 4) Administration: Chandra (Site
 Platform ladders are to be used for light  Buddy system is to be Supervisor)
duty activities and only at locations where implemented when using
scaffolding. Scissor lift and any other mode ladder where there is another
of working platform cannot be used. worker holding the ladder firm
 Adequate handhold shall be provided to a when the other is climbing
height of one meter above the place of the onto it or working on the
landing of the heights runs to be reached by rungs.
the feet of any person on the ladder  Ladders are to be inspected
 Toe-board are to be provided. daily to ensure it is in good
 Ladder is to be placed on firm and even condition and there are no
ground. defective parts.
 No work at height more than 3m is allowed  Platform ladder cannot be used
to be carried out on ladders. along any open sides of the
 The rungs and footrest of the ladder should building at all times
be free of damage and defects. 5) PPE :NA
 Apply PTW foe WAH 4 2 8 4 1 4
5) PPE :
 Must wear safety shoes, hand gloves and
safety helmet at all time.

14
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 15 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
7.2 Work-At-Height - Toppling of Head injuries/major 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
Use scissor lift scissor lift due body injuries/death 2) Substitution: NA 2) Substitution: NA Manager)
to use on 3) Engineering -NA 3) Engineering -NA
uneven floors 4) Administration: 4) Administration: Chandra (Site
 Scissor lift are to be operated on even and  Adequate and secured Supervisor)
stable floors guardrails provided
 All workers working on the scissor lift to be  Implement fall prevention
issued with safety harness and to be secured plan
to the mid railing  \workers are to be WAH
 In the event of the scissor lift breaking certified and works to be a
down, workers are not to climb down the WAH supervisor
scissor arms. 5) PPE:NA
 Daily pre-checks to be carried out by
operators to ensure everything is in order.
 provision of safety harness and anchorage
location
 scissor lift certified safety use with valid
certificates
 workers trained on use of safety harness
 Make sure that application for permit is
implemented and signed by an authorized 5 2 10 5 1 5
personnel.
 Apply PTW for WAH
 qualified MEWP operator with valid
certification
5) PPE:
 Must wear safety shoes, hand gloves and
safety helmet, safety belt & full body
harness at all time where is applicable.

15
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 16 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
8) LIFTING WORKS
8.1 Lifting and Manually lifting Back aches / pains 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
installation of pipes of Heavy pipes 2) Substitution: NA 2) Substitution: NA Manager)
( Manually) 3) Engineering :NA 3) Engineering :NA
4) Administration: 4) Administration: Chandra (Site
 Use mechanical lifting aids e.g approved  Provide and attend training. Supervisor)
chain block, pulley.  Deployment of more than one
 Use proper lifting posture and method. worker to carry the lad to
5) PPE: 3 2 6 prevent over lifting 3 1 3
 Must wear safety shoes, hand gloves and 5) PPE: NA
safety helmet at all time.

9) PAINTING WORKS
9.1 Application of Storage of Fire / explosion / 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
coating/ touch up paints serious injuries 2) Substitution: NA 2) Substitution: NA Manager)
using roller or paint fatalities 3) Engineering :NA 3) Engineering :NA
brush 4) Administration: 4) Administration: Chandra (Site
 Paints should be stored in a dry and in a  Workers are reminded during Supervisor)
designated area and should be away from the tool box meeting that there
other flammable materials. are no other hot works that has
 “Non-smoking” signs to be put at the paint to be carried out in areas where
storage area. painting works are on-going.
 A fire extinguisher is to be placed at the  There should be no smoking at
storage area. all times in the storage area.
5 2 10 5 1 5
 When carrying out painting works, site 5) PPE:NA
supervisor is to ensure there are no other hot
works being carried out in the same area.
 Workers to be briefed on SDS of paint.
5) PPE:
 Must wear suitable PPE like safety shoes,
hand gloves and safety helmet at all time.

16
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 17 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
Chemical splash Skin/ eye irritation 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
on skin / into 2) Substitution: NA 2) Substitution: NA Manager)
eye 3) Engineering : 3) Engineering :NA
 While mixing paints, hand protection gloves 4) Administration:NA Chandra (Site
of appropriate materials must be worn. 5) PPE:NA Supervisor)
4) Administration: NA 4 2 8 - - -
5) PPE:
 Suitable long sleeves, eye goggles and
gloves to be worn while at paint

Inhalation of Dizziness/ nausea/ 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
paint fumes unconsciousness 2) Substitution: NA 2) Substitution: NA Manager)
3) Engineering : 3) Engineering :NA
 An area where painting is to take place is in 4) Administration:NA Chandra (Site
the open, if more ventilation is required, 5) PPE:NA Supervisor)
blowers / extractors will be used.
4) Administration: NA 3 2 6 - - -
5) PPE:
 Suitable long sleeves, eye goggles and
gloves to be worn while at paint

10) AIR COMPRESSURE TESTING


10. Pressure testing Hose damaged Physical injury 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
1 using air (5-40 Psi) during using 2) Substitution: NA 2) Substitution: NA Manager)
3) Engineering: NA 3) Engineering:NA
4) Administration: 4) Administration: Chandra (Site
 Must properly barricade at working area  Supervisor to ensure only the Supervisor)
with appropriate warning signage. trained and authorised operator
 Daily check on the connecting hose to check are using the equipment.
for damages. 5) PPE:NA
5) PPE: 3 2 6 3 1 3
 Must wear safety shoes, hand gloves and
safety helmet at all time.

17
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 18 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
Over-pressures Eyes and others 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
of receiver due body parts injuries 2) Substitution: NA 2) Substitution: NA Manager)
to faulty safety 3) Engineering: NA 3) Engineering:NA
valve 4) Administration: 4) Administration: Chandra (Site
 Air compressor to be inspected by the  Supervisor to ensure only the Supervisor)
MOM-Authorised examiner every 2 years. trained and authorised operator
 Must properly barricade at working area 4 2 8 are using the equipment. 4 1 4
with appropriate warning signage. 5) PPE:NA
 Ensure not to exceed allowable test pressure
5) PPE:
 Must wear safety shoes, hand gloves and
safety helmet at all time.

Exposure to hot Hand, leg and other 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
surface of the parts of body 2) Substitution: NA 2) Substitution: NA Manager)
machine injuries 3) Engineering : 3) Engineering :NA
 Keep clear fingers and hair away from the 4) Administration:NA Chandra (Site
exposed parts. 5) PPE:NA Supervisor)
 Don’t place the hand neat the exposed part
 Use proper hand tools for the job 4 2 8 - - -
4) Administration:
 Provided adequate signage and barricade.
5) PPE:
 Must wear safety shoes, hand gloves and
safety helmet at all time.

Whipping of the Physical injuries 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
air hose 2) Substitution: NA 2) Substitution: NA Manager)
3) Engineering : 3) Engineering :NA
 Provide anti-whip arrestors to prevent 4) Administration:NA Chandra (Site
whipping of the air hose. 5) PPE:NA Supervisor)
4) Administration:
 Provide training for the workers on the safe
4 2 8 - - -
of the air compressor.
5) PPE:
 Must wear safety shoes, hand gloves and
safety helmet at all time.

18
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 19 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
11) MAINTENANCE WORKS
11. Maintenance works Back strain Back injury/ 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
1 with equipment / from manual Environment 2) Substitution: NA 2) Substitution: NA Manager)
machinery lifting/ Oil pollution/ Hand/ 3) Engineering -NA 3) Engineering -NA
spillage onto body injuries 4) Administration: 4) Administration: Chandra (Site
ground/ Cuts/  Proper lifting.  Use mechanical devices to Supervisor)
lacerations  Workers are to be briefed on how to do replace manual lifting.
proper manual handling. Do not over exert  No hot works to be carried out
or carry heavy load. Seek assistance if 3 2 6 near equipment/ machinery 3 1 3
required. that are going to undergo
 Using of spill trays to contain oil spills maintenance.
wherever possible. 5) PPE:NA
 Clean up any oil spill immediately.
5) PPE:
 Appropriate hand gloves to be worn

12) HOT WORK ACTIVITIES


12. Hot works (Welding Spark/fire Skin (part of body) 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
1 for API gas pipe burn 2) Substitution: NA 2) Substitution: NA Manager)
joints) 3) Engineering: NA 3) Engineering -NA
4) Administration: 4) Administration: Chandra (Site
 Only trained operators are allowed to use  Keep fire extinguisher. Supervisor)
the equipment.  Supervisor monitoring
 Work in safe location. activities.
 Shut off the blowpipe when not in use. 5) PPE:NA
 Clamp the work piece; do not hold it by
hand.
 Application of PTW for Hot Work 4 2 8 4 1 4
 Ensure proper barricade at working area
with appropriate waring signage.
 Keep the hose away from the working area
to prevent contact with flames, heat, sparks
or hot spatter.
 SWP briefing.
5) PPE:
 Must wear safety shoes, hand gloves face
shield, ear plug, safety goggles and safety
helmet at all time.

19
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 20 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
Fire & Burns or fatal 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
explosion accident to workers. 2) Substitution: NA 2) Substitution: NA Manager)
Property damage. 3) Engineering: 3) Engineering -NA
 Move to safer work place for the task. 4) Administration: Chandra (Site
 Removed surrounding any combustible  Supervisor monitoring Supervisor)
materials. activities.
 Provided proper ventilation. 5) PPE:NA
4) Administration:
 Only trained operators are allowed to use
the equipment. 5 2 10 5 1 5
 Keep fire extinguisher at all time during the
task.
 Supervisor monitoring activities.
5) PPE:
 Must wear safety shoes, hand gloves and
safety helmet at all time.

Misuse oxygen fatality / serious 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
(Explosion) injury /physical 2) Substitution: NA 2) Substitution: NA Manager)
injuries 3) Engineering: 3) Engineering -NA
 Never allow oil or grease to come into 4) Administration: Chandra (Site
contact with oxygen valves or cylinder  Regularly check the regulator Supervisor)
fittings. is safe for oxygen and for the
 Never use oxygen with equipment not cylinder pressure.
designed for it  Supervisor monitoring
4) Administration: activities.
 Only trained operators are allowed to use 5) PPE:NA
the equipment. 5 2 10 5 1 5
 Keep fire extinguisher at all time during the
task.
 Supervisor monitoring activities.
5) PPE:
 Must wear safety shoes, hand gloves and
safety helmet at all time.

20
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 21 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
Maintain all Gas Burn /fatality / 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
equipment and keep leak(Explosion) serious injury 2) Substitution: NA 2) Substitution: NA Manager)
in good condition. 3) Engineering: 3) Engineering -NA
Regular check all  Keep hose clear of sharp edges and abrasive 4) Administration: Chandra (Site
connection and surface.  Maintain all equipment and Supervisor)
equipment for fault  Do not allow hot metal or spatter to fall on keep in good condition.
and leak. hoses. Regular check all connection
 Handle cylinders carefully, keep them in an and equipment for fault and
upright position and fasten it. leak.
 Gas supply off at the cylinder when job 5) PPE:NA
5 2 10 5 1 5
finish keep fire extinguisher.
4) Administration:
 Provided adequate signage and barricade.
 Keep fire extinguisher at all time during the
task.
 Supervisor monitoring activities.
5) PPE:
 Must wear safety shoes, hand gloves and
safety helmet at all time.

Trip and fall Physical injuries 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
(Hit by 2) Substitution: NA 2) Substitution: NA Manager)
wire/hose or 3) Engineering: NA 3) Engineering -NA
other materials) 4) Administration: 4) Administration: Chandra (Site
 Hose not allowed running at the walkway.  Regular inspection. Supervisor)
3 2 6 3 1 3
 Proper housekeeping.  Brief to worker.
5) PPE: 5) PPE:NA
 Must wear safety shoes, hand gloves and
safety helmet at all time.

Provide fire Improper Physical Injury / 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
extinguisher within storage & death to person (s) 2) Substitution: NA 2) Substitution: NA Manager)
valid expiry date arrangement due to fire / 3) Engineering: NA 3) Engineering -NA
nearby storage area, explosion 4) Administration: 4) Administration: Chandra (Site
inspection by safety  Cylinders to be stored at sheltered from  Provide fire extinguisher Supervisor)
personnel. combustible materials or heat source. within valid expiry date nearby
5 2 10 5 1 5
 Signs indicating “NO SMOKING / NO storage area, inspection by
NAKED FLAME” to be displayed at safety personnel.
storage area. 5) PPE:NA
5) PPE:
 Must wear safety shoes, hand gloves and
safety helmet at all time.

21
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 22 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
12. Cutting of pipes use Use of grinder Finger amputation/ 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
2 of grinder cutter at constraint laceration/ body part 2) Substitution: NA 2) Substitution: NA Manager)
space, jump cut by grinder & 3) Engineering: NA 3) Engineering -NA
form and self- circular saw 4) Administration: 4) Administration: Chandra (Site
climbing  All grinders shall be inspected by LEW in a  Grinders are not allowed to be Supervisor)
platform. monthly basis. used in constraint space, jump
 Supervisor shall make sure the grinders are form and self-climbing
in good and functioning condition. platform.
 Supervisor to ensure the worker has a proper  Supervisor to highlight in daily
bench/table for material fabrication work. toolbox meeting in a daily
 Store man to ensure that the suitable safety 4 2 8 basis. 4 1 4
guard for the machine/tool is in place and is  Supervisor to conduct internal
in a functioning condition for its safety training for safe use of grinder.
feature prior to issue to the worker. 5) PPE:NA
 Supervisor to delegate related works to the
experienced workers.
5) PPE:
 Must wear safety shoes, anti-cuts resistance
hand gloves, ear plug, safety goggles and
safety helmet at all time.

13) GI JACKETING WORKS


13. Drill works of GI Strick by Ill-health/ physical 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
1 sheet by battery drill rotating drill bit injuries (injuries 2) Substitution: NA 2) Substitution: NA Manager)
and flying hand or finger & 3) Engineering: NA 3) Engineering -NA
object or eyes) 4) Administration: 4) Administration: Chandra (Site
rubbish  Pre-check condition of bit before use.  Do not wear loose cloth, Supervisor)
 Brief to worker to hand keep distance from jewellery and long hair to be
drill. kept clear of moving parts.
5) PPE: 4 2 8 5) PPE:NA 4 1 4
 Use proper hand gloves and safety glass &
dust mask.

22
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 23 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
13. Cutting of GI sheet Cutting by snip Ill-health/ physical 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
2 by snip cutter cutter or sharp injuries (injuries or 2) Substitution: NA 2) Substitution: NA Manager)
edge of GI sheet cutting hand or 3) Engineering: NA 3) Engineering -NA
finger) 4) Administration: 4) Administration: Chandra (Site
 Important to grip the handle firmly.  Choose the right snip cutter for Supervisor)
 Use snip cutter that in good condition. the job.
 Squeeze the handles together with just  Avoid misuse of snip cutter.
enough force to produce a short, accurate 5) PPE:NA
cut line.
 Avoid pinching your hand with the end of
the handles when the snips close
completely.
 Never run your fingers along a recently cut 4 2 8 4 1 4
edge of gi sheet.
5) PPE:
 Must wear safety shoes, hand gloves and
safety helmet at all time.

13. Seal up with rivet Caught in rivet Ill-health/ physical 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
3 and silicon gun, flying injuries (injuries or 2) Substitution: NA 2) Substitution: NA Manager)
object and sharp cutting hand or 3) Engineering: NA 3) Engineering -NA
edge finger & eyes) 4) Administration: 4) Administration: Chandra (Site
 Familiarise yourself with the equipment  Keep unnecessary personnel Supervisor)
before use. away from work area.
 Keep hand or finger away from ejection 5) PPE:NA
area.
 Important to grip the handle firmly. 4 2 8 4 1 4
5) PPE:
 Must wear safety shoes, hand gloves and
safety helmet & ear plug at all time.

23
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 24 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
14) EMERGENCY OCCURRENCE
14. Emergency On site Injury to personnel / 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
1 occurrence during emergency electrocution / 2) Substitution: NA 2) Substitution: NA Manager)
works falling from height / 3) Engineering -NA 3) Engineering -NA
fire/ exposure to 4) Administration: 4) Administration: Chandra (Site
toxic chemicals  Activate emergency plan and emergency  Follow Range Construction Supervisor)
response team to mitigate emergency 4 2 8 Emergency response plan. 4 1 4
situation. 5) PPE:NA
5. PPE:
 Worker must wear proper PPE as according
to main-contractor requirement

15) HOUSE KEEPING


15. Housekeeping Tripping Injury to workers, 1. Elimination :NA 1) Elimination :NA Pichit (Project On Going
1 hazard, access damaged to property 2. Substitution: NA 2) Substitution: NA Manager)
blocked to loss of time and 3. Engineering –NA 3) Engineering -NA
vehicles, due to money 4. Administration: 4) Administration: Chandra (Site
poor  Briefing workers on the proper housekeeping  Training will be given to Supervisor)
housekeeping during task briefing. workers on the proper
( trip and fall  Barricade the area with warning signs. housekeeping techniques.
hazard.) 2 2 4 2 1 2
 Housekeeping will be carried out regularly. 5) PPE:NA
5. PPE:
 Must wear safety shoes ,hand gloves and
safety helmet at all time.

16) NIGHTS WORKS AFTER OFFICE WORK


16. Emergency On site Injury to personnel / 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
1 occurrence during emergency electrocution / 2) Substitution: NA 2) Substitution: NA Manager)
works falling from height / 3) Engineering: NA 3) Engineering -NA
fire/ exposure to 4) Administration: 4) Administration: Chandra (Site
toxic chemicals  Activate emergency plan and emergency  Follow Range Construction Supervisor)
response team to mitigate emergency 4 2 8 Emergency response plan. 4 1 4
situation. 5) PPE:NA
5) PPE:
 Worker must wear proper PPE as according
to main-contractor requirement

24
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 25 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
17) HUMAN FACTOR(FOREIGN WORKERS WHO ARE NOT
FAMILIAR WITH THE LOCAL WORKING ENVIRONMENT)
17. Housekeeping Tripping Injury to workers, 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
1 hazard, access damaged to property 2) Substitution: NA 2) Substitution: NA Manager)
blocked to loss of time and 3) Engineering -NA 3) Engineering -NA
vehicles, due to money 4) Administration: 4) Administration: Chandra (Site
poor  Briefing workers on the proper  Training will be given to Supervisor)
housekeeping housekeeping during task briefing. workers on the proper
(trip and fall  Barricade the area with warning signs. housekeeping techniques.
hazard.) 5) PPE:  Housekeeping will be carried
2 2 4 2 1 2
 Worker must wear proper PPE as according out regularly.
to main-contractor requirement. 5) PPE:NA

18) WORKING UNDER ADVERSE WEATHER( EXPOSURE TO HOT


WEATHER, LIGHTNING & HAZY CONDITION)f
18. Emergency On site Injury to personnel / 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
1 occurrence during emergency electrocution / 2) Substitution: NA 2) Substitution: NA Manager)
works falling from height / 3) Engineering -NA 3) Engineering -NA
fire/ exposure to 4) Administration: 4) Administration: Chandra (Site
toxic chemicals  Activate emergency plan and emergency  Follow Range Construction Supervisor)
response team to mitigate emergency Emergency response plan.
situation. 5) PPE:NA
5) PPE:
 Worker must wear proper PPE as according
to main-contractor requirement. 4 2 8 4 1 4

25
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 26 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
19) FIRE / EMERGENCY EVACUATION
19. Housekeeping Tripping Injury to workers, 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
1 hazard, access damaged to property 2) Substitution: NA 2) Substitution: NA Manager)
blocked to loss of time and 3) Engineering -NA 3) Engineering -NA
vehicles, due to money 4) Administration: 4) Administration: Chandra (Site
poor  Briefing workers on the proper  Training will be given to Supervisor)
housekeeping housekeeping during task briefing. workers on the proper
(trip and fall  Barricade the area with warning signs. housekeeping techniques.
hazard.) 5) PPE: 2 2 4  Housekeeping will be carried 2 1 2
 Worker must wear proper PPE as according out regularly.
to main-contractor requirement. 5) PPE:NA

20) TERRORISM THREAD


20. Terrorism Threat Unauthorized Cause chaos to work Elimination: NA Administrative Control: Pichit (Project On Going
1 personnel enter site Substitution: NA Relevant information of SG Secure Manager)
the site with Property Damage Engineering Control :NA to update the workers.
dangerous Serious Bodily Administrative Control: Get workforce to be familiar with Chandra (Site
weapon/ Injuries/ Fatality to Ensure all attending SIC to produce the original “Run, Hide & Tell and “ Press, Supervisor)
chemical/ workers ID for verification. Tie and Tell”
Unmanned bag Any suspicious items or personnel seen on site Brief the workforce on the lock
contain must be reported immediately to main contractor. down procedure
explosive bomb Security guard must be alert at all times to
suspicious vehicles left abandoned or seen
repeatedly driven around the site on different
occasions.
Adhere to Main Con Emergency Evacuation 5 3 15 5 2 10
Procedure.
Familiar with Emergency Evacuation route
PPE: Not feasible

26
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 27 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION

Possible Initial Residual Risk Owner (Action Officer)


Accident / Ill Risk Risk
No Work Activity Hazard Health & Existing Risk Control Level Additional Risk Control Level
Persons-at- Name &
Risk S L R S L R Due Date
Designation
21) COVID-19
21. COVID-19 Covid 19 Postive Covid 19 Follow & update on COVID 19 advisories at Appoint SMO/ SDO to conduct, Pichit (Project On Going
1 Coronavirus transmission susceptible to show Government Websites Records remind & update & health records Manager)
Exposure to symptoms such as Body temperature twice daily (morning & of worker. Provide hands
virus bought by Dry Cough afternoon) Maintain social sanitzer when washing bay not Chandra (Site
cross- Tiredness distancing (at least 1-1.5m apart) at all times available. Supervisor)
contamination Difficulty breathing Different team or company shall be maintain at Regularly disinfection of equipment
from a High Fever least 2 meter social distancing and work surface
confirmed case Sore throat Good respiratory hygiene (Always cover mouth Put in place an evacuation plan for
through the and nose with tissue when coughing or sneezing, suspected case as well as for other
following: dispose tissue into bin and wash hand) site personnel
1. Coughing Arrange all staffs/members to attend Covid Safe Any employee who is feeling
and Sneezing Training Course unwell or showing mild symptoms
2.Close contact Download Trace Together Apps for tracing to leave the workplace & consult
- such as Hand contact purpose doctor immediately. Track & record
shake, touching Appoint SMO/SDO to assist in implementation these cases as part of safe
..etc & Coordination of Safe Management of work management measure
place/site Carry out a thorough cleaning &
disinfect all relevant on site area
and assets exposed to confirm cases
5 2 10 5 1 5