Professional Documents
Culture Documents
ACTIVITY TITLE: LOADING AND UNLOADING OF PILE CONTRACTOR: CHINA HARBOR ENGINEERING COMPANY
PIPES DATE: SEPTEMBER 27, 2020
BRIEF DESCRIPTION OF THE ACTIVITY: loading and unloading of pile pipes from fabrication workshop to breakwater area.
REVISION STATUS
REV. DATE DESCRIPTION
HAZARD/RISK MANAGEMENT HAZARD/RISK IDENTIFICATION
Can all personnel in the group answer YES to the Does the work involve/require? WORK AREA: FABRICATION WORKSHOP
following questions:
• Is a separate lifting plan required? NO ACTIVITY: LOADING AND UNLOADING OF PILE PIPES
• Have all the significant hazards involved with the
• Working in a noisy area? YES
work been identified? YES
• Line breaching or potential Hydrocarbon release? NO SUPERVISOR: MR. CHEN
• Have control measures been identified for these
hazards? YES • Any Environmental impact? NO
• Have the people responsible for implementing these • Working near objects that may move? YES HSSE OFFICER: OSIOBE WEALTH
control measures been identified and are the controls • Working in an area with poor lighting or a tight/confined
in place? YES Space? NO PROJECT MANAGER: MR. TING MING GANG
• Has the method of communication been agreed and • Working at height? NO
tested? YES
• Working near areas that could cause personnel to slip, HSE MANAGER: LIU JIANWEI
• Is everyone aware what is being done at the work- trip or fall? YES
site? YES • Using portable electric equipment? YES
• Are we aware of what everyone else is doing at the • Working with dangerous goods and substances
work-site? YES hazardous to health? NO
• Does everyone know that any changes to the work • Personnel who are new to the location or each other? NO
plan have been communicated to everyone involved • Equipment which is potentially dangerous? YES
in the work? YES
If so the work may be hazardous and care should be
• Does everyone know that any new people joining taken to ensure the work is done safely
the work party must be given a full and thorough
update off what is going on? YES Remember, everyone is responsible for:
• Using the correct tools for the job
• Being aware of the hazards around them and
If the answer to any of these questions is remaining vigilant to change.
NO, then the safety of people is at risk. • Using/wearing the correct PPE for the task.
• Making themselves aware of, and working within the
requirements of the PTW system and construction
The tool box talk leader should confirm the procedures
understanding of the group by asking open
questions on the above points
JOB SAFETY ANALYSIS (JSA) FOR LIFTING WITH GANTRY CRANES
S/N0 Operation/Activity Possible Hazardous Situations Indicate Necessary Measure to be taken (how can the Responsible Control in
Stage (The Steps (What could go wrong and What hazards be prevented and /or eliminated) (Who is going to take place
involved in doing the would the effects be) action) YES þNO
job)
1 Pre-task planning Poor job planning • PTW completed and obtained HSSE Supervisor
Fall • Pre-job/Tool Box talk/JSA discussed and all hazards and Construction Manager
Poor lifting accessories controls explained and understood prior to starting the job. HSSE Officer
• PPE issued (Protective Footwear, hard hats, coveralls, hand
Collision
gloves and safety glasses,(clear glasses worn for night work, if
required to do night shift).
• Equipment and all tools inspected prior to use and defective
items removed from use and replaced. YES
• Sufficient lighting towers to illuminate the work area if night
work should be carried out.
• Jewelries, rings, bracelets etc. removed prior to starting
work.
• Trailer installed with stand-shore to prevent fall
Type of Permit Required
Additional PPE Requirements Use of competent and licensed trailer drivers
(please indicate by ticking Special tools or equipment required
(Please list)
2 Set up ofbox)
work area Cuts • Area free from obstruction. Foreman Piping
General Permit to Work þ 1. Mandatory
Bruises PPE þ Drilling
Sufficient space available.
Rigs Shackles Permit Receiver þ
Hot Work 2. Face shield • Area barricaded and safety
Welding Machines signs in place Grease PumpSafety Officer YES
• First aid box/first Aider available
Lifting Permit þ 3. Fall arrestor Gantry Cranes þ Excavator
• PPE issued (Protective Footwear, hard hats, coveralls, hand
Excavation Certificate 4. High visibility vest þgloves
Pay loader With Bucket Concrete
and safety glasses,(clear glasses worn for night work). Pump + Hoses
ManMobilization
basket Certificate 5. Dust Mask
Involvement Pay loader With Fork Man Basket HSSE Supervisor
3
MEWP equipment
of
Certificate
& Materials
of unskilled
6. Breathing Apparatus Trained & skilled staff to be authorized for job
Self-Loading Mixers/Washer Truck Shovels, Pile Head Mold, Manager
Construction Hammers,
personnel
Other.__________________ Unauthorised/ uninspected Obtain relevantAnd
Wire Ropes permit þ
before vehicle/equipment
Slings entry in Equipment’s
Surveyor Foreman
7. Other.______________ the area HSSE Officer
___ equipment/tools at site Trolleys CFA Cage Vibrator
Personnel/Structures
JSA Review Process hit by Y N Ensure use of appropriate PPE’s on site Comments
trailer trucks and gantry crane
Was the work crew involved in formulating the JSA? Y JSA Briefing to all of workforce involved
Personnel injury / property
Did the work crew review/discuss the JSA prior to starting task?
damage Y Deliver tool box talk to all of trailer drivers & operators YES
Was the JSA referred to during the task? Y
Banks man should be available at site
Were the job steps followed? Y
Keep away all unauthorized people during movement of
Can you suggest improvements to the JSA? (Provide details) trailer trucks and gantry crane
Do not left un attendant any of equipment/tool in the area
Ensure Close HSSE monitoring /supervision
4 Loading & unloading of Uncertified Crane & Operator, Crane & its operator should be certified
pile pipes
Personnel hit by movement of Banks man/signal man should be available at site to control
crane the movement of trailer trucks and gantry crane
Unbalancing of pipes
Keep away all unauthorized people during movement of
Unauthorized personnel
trailer trucks and gantry crane
involvement
Sling broken, load drop Ensure Close HSSE monitoring /supervision
Miscommunication/signal error Ensure proper & inspected accessories being used for lifting
Slip, Trip & fall operation
Inclement weather condition Ensure that load is properly placed & lifted