Contractor Leader Name: Lim Kien You Contractor EHS Representative Name: Putera Afiq Bin Putera
Signature:
Signature:
If Routine Work Plan cannot be followed exactly as sequenced then stop work, contact Project Coordinator and Project Manager
for modification and initialing.
Sequence of Work/Basic Job Steps Safety Concerns/Potential Hazards Safety precaution required to eliminate / control hazards
1) Clean the granite surface plate with IPA Irritation when using IPA Wear proper gloves when using IPA
Physical injury (cut) when handling the unit Wear proper gloves when handling the unit
Scheduled waste generation due to contaminated Throw contaminated wipes inside designated waste bin
wipes
Do not mixed contaminated wipes with general waste
Potential impact to water quality Do not throw IPA inside sink.
2) Calibrate the granite using inclinometer Trip and fall hazard when using inclinometer Ensure the inclinometer wire not scatter on the floor when using it
according to the sizes (due to the inclinometer wire)
Ergonomics hazard Ensure to handle the inclinometer properly and take a break once in while
3) Clean the granite plate again after done Irritation when using IPA Wear proper gloves when using IPA
calibration
Physical injury (cut) when handling the unit Wear proper gloves when handling the unit
Scheduled waste generation due to contaminated Throw contaminated wipes inside designated waste bin
wipes
Do not mixed contaminated wipes with general waste
Potential impact to water quality Do not throw IPA inside sink.
3) Working during pandemic COVID-19 outbreak Potential exposure to COVID-19 Ensure to wear face mask all the time
Ensure physical distancing of 1 meter is follow when carry out the work
Sanitize hand frequently.