JSA FOR DISMANTLING OF STRUCTURE

S.NO SCOPE OF HAZARD CONTROL MEASURES


ACTIVITY
1) PREPARATORY 1) Collapse of Structure 1) The Competent Person shall survey the integrity of the structure
OPERATIONS 2) Collapse of a Portion of the prior to the start of demolition operations.
Structure 2) All required permits shall be obtained.
3) Asbestos/Lead Exposure 3) Prior to the start of the demolition, abatement of all asbestos or
4) Electrical, Gas, Water, lead, by a licensed removal company, will be completed.
Sewer, Cable Damage 4) Locate, shut off, cap, or otherwise control all utilities.
5) Glass Fragmentation 5) All glass shall be broken out and removed to the proper disposal
6) Fire Hazards container.
7) Exposure of the Public to 6) Fire extinguishers shall be available on site and
Falling Debris Emergency Services numbers shall be posted.
8) Rodents 7) Work zone must be completely fenced in and of a sufficient
distance away from sidewalks to remove any hazard to the
public.
8) A certified exterminator will treat the entire building in
accordance with governing health regulations
2) PERSONAL 1) Falling and flying debris 1) All workers on site shall wear hard hats.
PROTECTIVE 2) Dust Inhalation 2) A supply of dust masks shall be kept on hand to fill worker requests.
EQUIPMENT 3) Eye Injuries 3) All workers shall wear safety glasses.
4) Cuts/Scrapes/Abrasions 4) Workers handling debris from the demolition will wear work
5) Struck By gloves.
6) Caught Between 5) All workers on site shall wear approved, hi-visibility safety vests, to
make them visible to the equipment operators

3) DISMANTLING OF 1) Structure Collapse 1) Proceed with demolition in a systematic manner, working from the
STRUCTURE 2) Falling Debris top of the structure downwards.
3) Pollution 2) Any worker signalling the operator shall be in plain sight of
4) Housekeeping the operator at all times.
5) Fire 3) All workers shall remain at least 8-10 feet from
6) Slipping hazard the equipment used to perform the demolition.
7) Tripping hazard 4) Only workers necessary to the operation shall
8) Falling hazard be permitted in the work zone during this
operation.
5) Barrels and caution tape will be used to demarcate
the demolition zone.
6) Debris removal will not begin until the removal can be
safely performed without exposure to structural collapse or
falling debris.
7) Water will be sprayed to keep down the dust from
the demolition.
8) Water will not be allowed to accumulate and cause
a hazardous condition.
9) Drainage for temporary water use will be provided.
10) Structural framing members shall not be removed until
all stories above them have been demolished and
removed.
11) Framing members will be removed to a separate container.
12) Concrete and masonry debris will be removed to
a separate container.
13) Workers shall be instructed to posses heightened
awareness of their surroundings both during the
demolition and removal of debris.