JOB TITLE / AIM: Loading, offloading of materials, Concrete Poring with concrete bucket

JSA DATE: 27-06-2014 JSA NO./ REVISION:


SUPERVISOR/ JSA LEADER: Zakir Ali/Jabir Khan SCRIBE: Haider Khan
PARTICIPANTS : M. Fahim, Yar Muhammad, Muhammad Asif
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Mobilization of Equipment & Materials
2. Loading & unloading of materials
3. Lowering of Steel Cage structure & concrete poring
4. Working at night shift hours
5. Demobilization

Part 3: Equipments / Tools to be used: Crane, Rigging accessories & Hand Tools
Part 4: Contingency Plans. Standard PPE’s: First aid kit must be present at work site and the HSE personnel will be the first response in case of
emergency, ERPs & Emergency contact numbers to be in placed at job location

Part 5:JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In
case of any new hazard indentified by any of the working team member during the job, JSA review process should be carried on.
JSA No: JOB TITLE: Loading, unloading of materials, Concrete Poring with concrete bucket
Step Describe Job Step Potential Hazards Hazard Controls
No
1 Mobilization of equipment &  Involvement of unskilled personnel  Trained & skilled staff to be authorized for
Materials working
 Ensure JSA briefing & Daily TBT to all
workforce prior to commence activity
 Use of appropriate PPE’s
 Unauthorised/ uninspected  Only inspected Equipments/Tools must be
equipment/tools at site allowed at work site
 Use right tools for right job
 Personnel injury / property damage  Ensure safe transportation of
equipment/materials at work site
 Avoid throwing of materials
 All of materials to be secured while its
transportation to work site
 Close safety supervision
2 Loading & unloading of materials  Uncertified Crane & Operator,  Crane & its operator should be certified
 Personnel hit by movement of crane  Banks man/signal man should be available
 Unbalancing of out riggers at site to control the movement of heavy
 Unauthorized personnel involvement vehicles/equipments
 Place crane at levelled & compacted
ground surface
 Keep away all unauthorized people during
movement of heavy vehicle/equipments
 Ensure Close HSE monitoring
/supervision
 Sling broken, load drop  Ensure proper & inspected accessories
 Miscommunication/signal error being used for lifting operation
 Ensure that load is properly placed &
lifted
 Ensure proper communication between
JSA No: JOB TITLE: Loading, unloading of materials, Concrete Poring with concrete bucket
Step Describe Job Step Potential Hazards Hazard Controls
No
rigger/signal man & operator
 Keep away during crane operation
 Swing area should properly barricaded
 Slip, Trip & fall  Ensure proper stacking of all materials at
site
 Keep access/walk ways always clear from
any obstruction
 Ensure proper housekeeping of workplace
all the time
 Inclement weather condition  Stop crane work in case of any inclement
weather conditions (Rain, storm, fog etc.)
 Restrict movement of heavy
vehicles/equipments in rain/fog
 Fire & explosion  Ensure availability of inspected fire
extinguishers at site
 Flame arrestor to be installed in all
vehicles/equipments
3 Lowering of Steel Cage structure &  Personnel hand injury while handling  Ensure Involvement of skilled labour
Concrete poring with steel,  Ensure use of proper PPE’s
 People under suspended load,  Deliver TBT before commencing work
 Unbalancing of load  Ensure use of inspected & colour coded
hand tools & rigging accessories
 Area should be properly barricaded during
lifting operations
 Restrict unauthorized movement
 Improper signalling during lowering of  Ensure proper communication between
steel cage structure rigger/signal man & operator
 Rigger/signal man should wear vest
JSA No: JOB TITLE: Loading, unloading of materials, Concrete Poring with concrete bucket
Step Describe Job Step Potential Hazards Hazard Controls
No
 Inappropriate PPE’s/Tools during  Use of appropriate PPE’s during concrete
concrete work  Ensure use of inspected tools for the right
job
 Availability of fresh water at site
 Skin contact with concrete or other
 First aid box should be in place at site
chemicals
4 Working at night shift hours  Poor visibility at night hours  Ensure proper lighting arrangement for
late night working hours
 Vehicles/equipments hit with people,  Careful movement of vehicles in night
equipment or structure hours
 Place refection tapes at hard barriers,
structures
 Banks men should worn high visibility
reflection vests
 Slip , trip & fall  No working should be allowed in poor
lighting conditions
 Ensure proper housekeeping to avoid
tripping
5 Demobilization  Same as item one Same as item one

Prepared By: Hafeez Ullah Khan Approved By: