Job Steps:
1.Work preparation and mobilization of equipment and personnel’s
2. Storage and transportation of source.
3. Setup of RT activity
4. Working at height
5. Performing radiography test.
6.Source storage back to pit

PRECAUTIONS: Inform to all operation personnel’s , contractors and security Guards

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Work preparation and mobilization Unauthorised equipment/tools brought out to Prior to mobilizing to site ,all equipment shall be
of equipment and personnel’s site  Inspected and tagged by DEL E&I
 Inspected and approved by BHPB
 Provided with an inspection checklist-that
shall be completed on daily basis.
Unsafe / un secure transportation of source Source shall be transported in locked box in rear
of pick up.
Shipment container to be a BHPB approved lead
or steel lined and maintained in dedicated vehicle
(Pick up in locked box tied down in back of pick
up.)
Transportation vehicle shall transport source from
DODO gate to new flare line near condensate
pipeline.
Handling materials All materials to be handled and stored in
accordance with approved MSDS
All activities to be undertaken in accordance with
Inspects method statement approved by BHPB.
Unskilled or uncertified persons handling Only RT level 1 or 2 certified personnel’s should
source handle source.
These persons shall be equipped with dosimeter,
film badge, survey meter and wearing full PPE at
all times.
Workers unaware of hazards associated with Ensure all persons on job are presented with an
testing awareness package prior to work commencing.
The awareness package must present this JSA as
well as all appropriate parts of the inspectest
method statement for RT,
24 hrs prior to start a RT certificate with a
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
drawing of the site highlighting the work area and
the exclusion zone will be submitted.
Four permitter’s lights with spotters will be
deputed.
The area will be barricade with RT tape.
2 Storage and transportation of source. Source stolen DEL to maintain security precautions to prevent
armed theft of source as follows.
The source will be locked in its designated storage
area immediately after use.
 Poor illumination Use IS rated potable lights
 Manual Handling Use proper manual handling-Conduct tool box
meeting at site with crew.
3. Set up for RT activity SIMOPS / inadequate barrication around test Ensure barrication is installed at a distance
point calculated where the radiation intensity should not
exceed 7.5 Usv/hr.
Barrication to be erected in accordance with
source strength limits as per decay chart for
source.
AT NO TIME SHALL ANY PERSON OTHER
THAN THE CERTIFIED RADIGRAPHER
ENTER THIS EXCLUSION ZONE DURING
TESTING AT ANY TIME FOR ANY LENGTH
OF TIME.
INADEQUATE SIGNAGE / WARNING Signage located at each end of the test point must
SYSTEMS show trefoil and labelled radiography testing in
progress in with gamma alarm which will have a
certificate.
An audible gamma alarm with LED light shall
also be displayed during testing.
HSEC personnel will be on site at all times.
Nearby security check post in RT range shall be
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
informed 24 hrs prior to activity.
Inadequate protection for operators Person to conduct radiography must have hiding
place /barrier enough not to exposed radiation.
Exposure to other workers Ensure at least four persons are assigned as
lookouts to prevent other workers from entering
test point barricatedarea.
At no time shall any person other than the
certified radiographer enter this exclusion zone
during testing at any time for any length of time
Inadequate communication A radio will be on work front at all times.

Hand Injury Ensure proper hauling of materials /get help if


required/wear hand gloves.
Night activities/Poor visibility No work to be undertaken at night if the
lightening is in sufficient.\
Inform CCR tech on radio about radiographer
work zone movement.
3 Working at height (On scaffold Not complying with working at height All personnel’s prior to work at height
platform) procedures  Must have work at height training and
wear green id
 Proper access ladder (approved / certified)
shall be used.
 Wear full body harness with 100% tie off
at all times.
4 Performing radiography test Un skilled and un certified persons handling Only RT level 1 and 2 certifie personnel shall
source handle source .
These persons shall be equipped with
dosimeter ,film badge ,survey meter and be
wearing full PPE at all times.
Test performed in safe manner All testing to be undertaken in accordance with
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
inspectest and BHPB approved procedures.
Strong wind No testing in strong wind.

Source blockage in guide tube /Dropped source 1-Area cleared and PRO (Mr .Abid Naeem or Mr.
exposed on ground Arshad Iqbal ) immediately informed.\
2-Actions to be implemented in accordance with
directions given by site PRO.
In adequate preparation in the event of A drill shall be conducted prior to job execution at
emergency response requirement site ,to be witnessed by clients Representatives.
Report of the drill shall be submitted immediately.