JOB SAFETY ANALYSIS (JSA) Repo

Site: DAHEJ Date: 07/12/2023


Dept/Plant: PROJECT(CIVIL) Time :12:00 P.M.
Process/Activity /Step: Heating on chullha by dry wooden at near by T.N. Projets office. - Heating, Transfer,
Mixing and Laying

Observation
Sub Activity /
No Hazard Impact
Sub Step (in sequence)
(what could go wrong)
Mobilization and Solid Bitumen falls and Hit
Properly Storage of hazards.
1 Bitumen

1.Tank fall and hit hazard while


putting tank on place (Chulha/Stove)

2.Injury due to tank fall down while


Heating of Bitumen in Hot
shifting and from chip of wood while
1 tank by firing of wood
putting wood into Chulha (stove) for
(in Chulha - Stove)
burning
3.Bitumen (coaltar) filled drum hit
hazard while shifting as surface is
uneven

1.Injury due to drum hit hazard


Pouring of Bitumen in Hot
2.Injury due to spillage of hot
tank by keeping bitumen
Bitumen in work area
2 drum over the Heating tank
3.Drum leakage and spillage
(Located on Hot
4.Drum slip due to uneven surface
Chulha/stove)

Collection of Hot bitumen 1.Burn injury due to hot bitumen


3 from Hot tank to spillage
Handling/Transfer Bucket 2. Injury due to sharpe edge
Transfer of hot Bitumen in
bucket from from hot tank
1.Burn injury due to hot Bitumen
4 area to Mixure machine
splash
near to Storage tank civil
foundation area

1.Machine moving part hazards


(Guard is missing)
2.Burn injury while pouring Bitumen
Preparation of Hot bitumen
5 mixture in Mixure machine.
into mixure machine
3.Injury due to Leak / Spill of hot
bitumen
4.Dust exposure

Shifting of Hot mixture from 1.Filled/Empty Trolley moving


Mixture machine to civil hazards
6 foundation by Trolley 2.Injury due to trolley hit
(Laying of ready mixture on 3.Burn injury due to hot mixture.
Civil Foundation) 4.Dust exposure

Name/Sign
1 Indulal Chawda
2 Paresh Pandya
3 Sarvesh Mishra
4 Yogesh Gadhvi
5 Manoj Soni
Doc. No. : DKC/HSE/FM/106
JOB SAFETY ANALYSIS (JSA) Report Date : 15/09/2014
Rev.No. : 03
JSA #: DKM/PROJ(C)/JSA/008
Rev. No. : 00
23 Doc used in Study/Ref :
M. Equipment : CHULLHA ,STEEL DRUM, STEEL KETALI.
near by T.N. Projets office. - Heating, Transfer, JSA Team : Mr. Indulal Chavda, Mr. Manoj Kite, Mr. Lohar Jayavant, Mehul, and
Mukesh (T.N. Projects )

Recommended Additional Controls / Safe Job


Existing Controls
procedure

Condition of Bitumen heating tank to be


check.
1.Gum boot to be provided for this job.
Trained and experience workers be
2.Only use good condition drum, ensure no leakage in
perform the job.
drum
Activity to be carried out under close
3.Provide/repair handle which is broken
supervision.
4.While shifting drum, provide more manpower to lift anfd
Use PPEs like Safety Helmet,Safety
put on the tank
shoes,Cotton Handgloves and safety
5.Tool box talk before starting activity
Goggles.
Keep away unwanted manpower.

Drum is kept near to the Chulha,


shifting distance is reduced while
unloading from vehicle
Trained and experience workers be 1.Drum to be inspected before charging of bitumen in hot
perform the job. tank.
Activity to be carried out under close 2.Ensure no leakage/spillage of bitumen in work area.
supervision. 3. Do barrication by providing enough space.
Use PPEs like Safety Helmet,Safety 4.Tool box talk before starting activity
shoes,Cotton Handgloves and safety
Goggles.

Collection tool is provided with long


handle
Trained and experience workers be
1.Ensure quality and capicity of bucket for filling and
perform the job.
shifting of bitumen .
Activity to be carried out under close
2.Work permit system to be followed.
supervision.
3.Tool box talk before starting activity
Use PPEs like Safety Helmet,Safety
shoes,Cotton Handgloves and safety
Goggles.
Trained and experience workers be
1.Move only on defined path, ensure housekeeping is
perform the job.
good .
Activity to be carried out under close
2.Ensure quality and capicity of bucket for filling and
supervision.
shifting of bitumen .
Use PPEs like Safety Helmet,Safety
3.Work permit system to be followed.
shoes,Cotton Handgloves and safety
4.Tool box talk before starting activity.
Goggles.

Trained and experience workers be


perform the job.
Activity to be carried out under close 1.Provide guard on machine moving parts
supervision.
Use PPEs like Safety Helmet,Safety
shoes,Cotton Handgloves and safety
Goggles.

Trained and experience workers be


perform the job.
1.Careful drive of hand trolley while moving
Activity to be carried out under close
2.Tool box talk to workmen
supervision.
3.Use Gum boots during the activity.
Use PPEs like Safety Helmet,Safety
shoes,Cotton Handgloves and safety
Goggles.
Reviewed By: Dr.V.N.Badoni
SE/FM/106
4

(C)/JSA/008

L KETALI.

e, Mr. Lohar Jayavant, Mehul, and

By Whom /
Date

Sarvesh Mishra /
Paresh Pandya /
Yogesh Gadhvi /
Immediate

Sarvesh Mishra /
Paresh Pandya /
Yogesh Gadhvi /
Indulal Chawda /
Immediate

Sarvesh Mishra /
Paresh Pandya /
Yogesh Gadhvi /
Immediate
Sarvesh Mishra /
Paresh Pandya /
Yogesh Gadhvi /
Immediate

Sarvesh Mishra /
Paresh Pandya /
Yogesh Gadhvi /
Immediate

Sarvesh Mishra /
Paresh Pandya /
Yogesh Gadhvi /
Immediate

r.V.N.Badoni

You might also like