The document is a job safety analysis form for loading pipes and lifting a cooling tower machine in a cooling tower room operation area. It lists potential hazards such as pinching, falling, exposure to dust and shards of material. It recommends workers do briefings, ensure the work area is clean, and use personal protective equipment like safety shoes and glasses to mitigate the hazards.
The document is a job safety analysis form for loading pipes and lifting a cooling tower machine in a cooling tower room operation area. It lists potential hazards such as pinching, falling, exposure to dust and shards of material. It recommends workers do briefings, ensure the work area is clean, and use personal protective equipment like safety shoes and glasses to mitigate the hazards.
The document is a job safety analysis form for loading pipes and lifting a cooling tower machine in a cooling tower room operation area. It lists potential hazards such as pinching, falling, exposure to dust and shards of material. It recommends workers do briefings, ensure the work area is clean, and use personal protective equipment like safety shoes and glasses to mitigate the hazards.
[Tt] Trouble Ticket / [Mcm] Date : Change Management Number Ref Number: January 04, 2023
Company : Subcontractor: Location Of Work :
PT. Indokomas PT. Surya Marga Luhur Cooling Tower Room Operation (Sml) Area Description Of Work : Loading Pipe and Lifting Cooling Tower Mechine in Cooling Tower Room Operation Area Required And/Or Recommended Personal Protective Authorised By: Equipment:
Safety Shoes, Safety Glassess, Helmet Vest, Face Mask,
Measuring Tape, Varnier Calliper, Leather Gloves.
Sequence Of Basic Job Potential Hazards Recommended Action
Steps Or Procedure 1. Loading Pipe and 1. Pinched 1. Do Briefings Lifting Cooling Tower 2. Fallen Personal 2. Make Sure The Area Is Clean Mechine in Cooling 3. Exposed To Dust And Not Wet Tower Room 4. Aids Fall 3. Ensure Workers Use 5. Exposed To Shard Approriate Personal Protective Of Material Equipment When Working 4. Ensure That Workers Carry Out Work According To Dettermned Standars