This document outlines the job safety analysis for installing scaffolding at a data hall location. The work requires personnel to wear protective equipment like helmets, vests, safety shoes, and glasses. Potential hazards of the work include pinching, falling scaffolding or personnel, and dropped materials. Recommended actions are to have a work permit and toolbox meeting, only allow certified personnel to install scaffolding following regulations, ensure fall protection is used properly, and maintain housekeeping after work.
This document outlines the job safety analysis for installing scaffolding at a data hall location. The work requires personnel to wear protective equipment like helmets, vests, safety shoes, and glasses. Potential hazards of the work include pinching, falling scaffolding or personnel, and dropped materials. Recommended actions are to have a work permit and toolbox meeting, only allow certified personnel to install scaffolding following regulations, ensure fall protection is used properly, and maintain housekeeping after work.
This document outlines the job safety analysis for installing scaffolding at a data hall location. The work requires personnel to wear protective equipment like helmets, vests, safety shoes, and glasses. Potential hazards of the work include pinching, falling scaffolding or personnel, and dropped materials. Recommended actions are to have a work permit and toolbox meeting, only allow certified personnel to install scaffolding following regulations, ensure fall protection is used properly, and maintain housekeeping after work.
SEQUENCE OF BASIC JOB POTENTIAL HAZARDS RECOMMENDED ACTION
STEPS OR PROCEDURE
1. Install Scaffolding - Pinched - Prepare work permit
-Toolbox meeting before working - Scaffolding - Not use scaffolding before inspection - Slipped by Scaffolding Inspector HSE Indokomas - Fallen Personnel - Instal scaffolding follow regulation - Dropped Materials standart - Scaffolding installation by competent - Aids fall personil ( certificate) - The scaffolding collapsed - Personnel wearing PPE
- Work at heights must use PPE/Body
Haness, and be used correctly/associated properly Make sure other personnel are not right under the scapolding installation - Standby Inspector Scaffolding - After Installation Scaffolding inspect By Inspector Scaffolding or HSE Indokomas for Tagging Safe ( Green Tag ) - Housekeeping After working - Working - - Personnel wearing PPE - Concentration while working 7..Touch up / Finising - Slipped - Fall - Prepare the 'Touch up' tool - Aroma inhaled - Make sure the personnel when working in a safe condition - Wearing a mask