You are on page 1of 2

HIRARC NO.

: 00012

HAZARD IDENTIFICATION , RISK ASSESSMENT & RISK CONTROL (HIRARC)


COMPANY TENAGA ARTISAN SDN BHD PREPARED BY MOHD FAIZAL BIN MOHD SAHAR (HSE ADVISOR)
RENOVATION OF THE SHOP IN N.U
PROCESS/LOCATION REVIEW & APPROVED BY
SENTRAL

DATE 18/12/2019 REVIEW DATE

ACTIVITIES Install Partition Wall

HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL

ACTIVITIES /JOB STEP / HAZARDS PIC (DUE DATE/


NO EXISTING CONTROLS LIKELIHOOD SEVERITY RISK RATING RECOMMENDED CONTROL STATUS)
TASK / PROCESS
Apply working pass,
1 Safety briefing. Check all Not applicable Not applicable Not applicable KOH CHOON KIAT
document are ready
Isolation :
- Isolate cutting area
Safety Helmet, Safety Boot,
Administrative Control :
Safety Vest
- Supervision by site supervisor and SHE
Start cuttings metal rods Risk of hand injury and flying Advisor
Briefing the workers before KOH CHOON KIAT
2 by using grinder to make pieces of metal to workers 3 4 12(MEDIUM)
starts the work MOHD FAIZAL SAHAR
frame of partition wall Engineering Control :
- Using grinder with guarding protection
Supervision by site supervisor
PPE :
- Safety goggle

Administrative Control :
Use hand tools to Safety Helmet, Safety Boot,
complete to scope of work Safety Vest - All tools shall be only operated by
listed above: trained employees
Briefing the workers before - Tools shall be inspected by the workers KOH CHOON KIAT
3 Risk of bodily injury 3 3 9(MEDIUM)
1. Player starts the work MOHD FAIZAL SAHAR
prior to use each day.
2. Cutter
- Tools that are not fully operational shall
3. Screw driver Supervision by site supervisor
4. Drill be removed from the work area.

Safety Helmet, Safety Boot,


Safety Vest
Cut plasterboard using a
PPE : KOH CHOON KIAT
4 craft knife and Risk of hand injury 3 2 6(MEDIUM)
Briefing the workers before - Anti cut gloves MOHD FAIZAL SAHAR
straightedge.
starts the work

Page 1 of 2
HIRARC NO. : 00012

Supervision by site supervisor

Administrative Control :
- Inspections of mobile scaffold shall
occur prior to the start of work by the
subcontractor's supervisor
- All employees shall be train and
Safety Helmet, Safety Boot, instructed in the safe use of mobile
Safety Vest scaffold.
Install plasterboard - Only use the mobile scaffold for its
Risk of personnel Injury due
partition wall by using Briefing the workers before KOH CHOON KIAT
5 to working at elevations & 3 4 12(MEDIUM) intended purpose.
scaffold and plaster the starts the work MOHD FAIZAL SAHAR
exposed to a fall - When ascending or descending on a
plasterboard
mobile scaffold the user shall using three
Supervision by site supervisor
(3) points of contact at all times.
- Be aware of your surroundings.
- Always lock tires of mobile scaffold.
- Make sure before pushing mobile
scaffold to relocate no workers above
mobile scaffold

Page 2 of 2