You are on page 1of 6

HSE RISK ASSESSMENT FOR CIVIL WORKS, ISOLATORS AND DUCT INSTALLATION

REFERENCE NO.: WAVES POWER/FM/RA/01 Revision : 00


PERSONS/ BASELINE RESIDUAL
ASSETS/ RISK RISK
HAZARD / CONSEQUEN
RE DESCRIPTION OF ENVIRONME ADDITIONAL CONTROL RESPONSIB
ASPECTS CES (RISK / EXISTING CONTROL MEASURES
F. ACTIVITIES / TASKS NT/GROUPS MEASURES LE PARTY
DESCRIPTION IMPACT) P C R P C R
/
EXPOSED
1 Civil Works ( Installing Manual handling. Personnel Adeeb team Proper instruction should be 4 3 H Close supervision. Team 3 2 M
wooden doors and injury ( Eye provided to the team about work- leader,
gypsum boards) Slip, trip and fall. and Skin Assets related hazards. All the tools and equipment’s Engineer
People should be inspected regularly.
irritation, cut
Electrocutions. valid permits need to be obtained.
injuries) Barricade area with warning
around the
Fly particles working toolbox talk tape.
Property
area.
Defective power damage suitable PPE to be used( Safety
tools. goggles, safety helmet, safety
Chronic mask , ear plug, safety shoes and
Inhaling dusts. Effect( safety gloves)
allergies,
cancer) cutting machines should be
inspected before starting the
Musculoskel work.
etal
disorder. competent and trained persons
only allowed to use the cutting
machine.

All the wastes to be removed after


done the task
2 Painting Works Slip, trip & fall Personnel Adeeb team Proper instruction should be Close supervision. Team 2 1 L
from height. injury ( Eye provided to the team about the leader,
and Skin Assets work-related hazards. All the tools and equipment’s Engineer
Defective hand People should be inspected regularly.
irritation, cut
tools to use. valid permits need to be obtained.
injuries) Barricade area with warning
around the
Fire hazards. working toolbox talk tape.
Property
area.
Manual Lifting. damage Suitable PPE to be used( Safety SDS(safety Data sheet) should be
goggles, safety helmet, safety available.

Page 1 of 2
HSE RISK ASSESSMENT FOR CIVIL WORKS, ISOLATORS AND DUCT INSTALLATION

Inhaling. Chronic mask , ear plug, safety shoes and


Effect( safety gloves) Fire extinguisher should be
allergies, available.
cancer) All the waste is to be removed
after done the task.
Musculoskele
tal disorder.

3 Isolator installing, Electrocution. Burn Technician Proper instruction should be 3 4 H Close supervision Team 3 2 M
testing and (internal, and provided to the team before Make sure the supply is properly leader,
commissioning. Slip, trip & fall external), Equipment’s starting the Inspection for proper isolated. Engineer
from height. Major injury, shutdown of machine. Barricade the area with warning
Fire, tape.
Human error. Valid work permits need to be Fire Extinguisher should be
Personal obtained prior to the isolation. present within the work area.
Defective hand injury, Replace spare parts and wiring
tools to use. Apply LOTO with proper quality and standard.
Damage All the tools and Equipment’s
Fire hazard due to to property & Proper training before should be inspected regularly.
short circuit materials commencement of work
Proper PPE to be provided.
Toolbox Talk

Secure the area with barricade.

Continual supervision
Qualified personnel to carry out
the task.
4 Duct installation Electrocution. Burn Technician Proper instruction should be 3 4 H Close supervision. Team 3 2 M
Slip, trip & fall (internal, and provided to the team before leader,
from height. external), Equipment’s starting the duct installation. Barricade the area with Engineer
Major injury, .
warning tape.
Human error Fire, Valid work permits need to be
Personal obtained.
Defective hand injury. Fire Extinguisher should
tools to use. Cutting Proper training before be present within the
Fire hazard due to injury, commencement of work work area.
short circuit.
Proper PPE to be provided
Dust inhalation (Safety Helmet, Safety Goggles,
Page 2 of 3
HSE RISK ASSESSMENT FOR CIVIL WORKS, ISOLATORS AND DUCT INSTALLATION

Damage to Safety Shoes, Safety Gloves, Ear All the tools and
property & plug and Dust Mask) Equipment’s should be
materials. inspected regularly.
Toolbox Talk .

Secure the area with barricade.


Continual supervision

Qualified personnel to carry out


the task.
5 Use of hand tools and Slips & trips. Personnel Adeeb team A proper permit shall be available 3 3 M Use proper manual handling Team 2 1 L
Power Tools. injury like to start the work. technics as per OSHAD Cop 15.0 leader,
Sharp Objects fracture Assets Safe material handling techniques Damaged tools shall be removed. Engineer
should be followed. Do not obstruct
Dust formation Property Environment Pre-use checks of tools shall be access/Emergency exit.
damage al damage carried out prior to starting All other PPEs must be used such
Cuts activity. as safety boots, hard hat, safety
People Competent person to be gloves, Goggles, reflective vest,
Musculoskeletal around the authorized to operate the tools. protective clothes, safety etc.
disorder working Proper material stacking shall be
area. followed to avoid slip, trip and
fall.
Areas need to be barricaded and
unauthorized entry needs to be
restricted.

Page 3 of 4
HSE RISK ASSESSMENT FOR CIVIL WORKS, ISOLATORS AND DUCT INSTALLATION

6 Working At Height Working on the Serious Adeeb team 1. Only trained competent person 4 3 H Daily toolbox talk should be Team 3 2 M
USING LADDER roof, Personnel shall perform the task. performed and recorded. leader,
injuries like 2. Coordinate with concerned Unauthorized people must be Engineer
Fall from height, department for the permit and prohibited entry by proper
fracture,
Assets access for the working area. barricade and with warning
severe back signage.
Material fall. 3. A proper permit shall be
pain, neck All material, tools, PPE, should be
available to start the work.
injury, properly secured from falling.
Slip, Trips, Fall, 4. MS & RA and PTW instructions
Disability. People shall be followed. Cables to be tied to prevent
tripping.
Adverse weather around the 5. All ladders must be inspected
condition Access and egress to be safe and
working and tagged.
clean.
area. 1. Unauthorized people must be
Property Exclusion Zone and proper
prohibited entry.
damage barricading in the working area.
All shall be responsible for not
trespassing in the area of
Visitors operation.
In case of any adverse weather
condition roof top work must be
stopped.
A buddy system should be
implemented during work at
height.
OSHAD Cop No; 23 working at
height requirements must be
complied.
All other PPEs must be used such
as safety boots, hard hat, safety
gloves, Goggles, reflective vest,
protective clothes, safety. etc.

7 Working at height Fall from height, Serious Adeeb team Only trained competent people 3 4 H daily toolbox talk should be Team 3 2 M
using scaffolding. Personnel shall perform the task. performed and recorded. leader,
Material fall. injuries like Coordinate with concerned Unauthorized people must Engineer
department for the permit and be prohibited entry by
fracture,
Slip, Trips, Fall, Assets access for the working area. proper barricade and with
severe back A proper permit shall be warning signage.
pain, neck available to start the work.

Page 4 of 5
HSE RISK ASSESSMENT FOR CIVIL WORKS, ISOLATORS AND DUCT INSTALLATION

Adverse weather injury, People MS & RA and PTW instructions All material, tools, PPE,
conditions. Disability. around the shall be followed. should be properly secured
working All lifting Equipment’s must be from falling.
Electrocution inspected. Cables to be tied to prevent
area.
Unauthorized people must be tripping.
Property prohibited entry. Access and egress to be safe
and clean.
damage
Exclusion Zone and proper
Visitors
barricading in the working
area.
All shall be responsible for
not trespassing in the area
of operation.
In case of any adverse
weather condition roof top
work must be stopped.
A buddy system should be
implemented during work at
height.
OSHAD Cop No; 23 working
at height requirements must
be complied.
All other PPEs must be used
such as safety boots, hard
hat, safety gloves, Goggles,
reflective vest, protective
clothes, safety. etc.

8 House keeping Fire hazards. Damage to Technician Proper training before 3 3 M Proper housekeeping. Team 1 1 L
handling of tools property End user commencement of work All trash and scrap will be place leader,
Slip, Trip, Fall Interruption Client Proper PPE to be provided. in proper containers. Engineer
to site Toolbox Talk Tools and unused materials will
operation Continual supervision be cleaned up after finishing a
job or before leaving the job site
LEGEND: P: Probability, 1-Rare; 2-Possible; 3-Likely; 4-Often; 5-Frequent

C: Consequences; 1-Insignificant; 2-Minor; 3-Moderate; 4-Major; 5-Catastrophic

R: Risk Level; L-Low; M-Moderate; H-High; E-Extreme

Page 5 of 6
HSE RISK ASSESSMENT FOR CIVIL WORKS, ISOLATORS AND DUCT INSTALLATION

Page 6 of 6

You might also like