1 1. Mobilization of 3 numbers of 1. Hit by machine & parts 1. Ensure safe download 1. SOP
hydraulic piling machine, tool during unloading activity. procedure.
equipments, counter weight and 2.Crane
parts to site.
site. 2. Hit by spun piles during 2. Ensure mobile crane & checklist.
lifting down from trailers wire rope in good
2. Mobilization of various sizes working condition 3.Delivery
of spun piles to site. . Schedule
2 Installation,
Installat ion, testing & 1. Struck by moving parts 1. Installation manual Machinery
commissioning of piling during installation of machine Manual
machinery & equipments.
4 Lift-up of spun piles of various 1. Wire rope snapped during 1. Regular checking of 1.PM Crane
size & weight and piling works lifting of spun pile into piling wire rope sling before 2. PMA
machine. lifting of spun piles. 3.SOK
ESTIMATED MANPOWER
Total workforce per day App. 17 workers Working Hours 8 hours per day
ASSESSMENT POINT
No of Worker No of Point Exposure/Day No of Point
0–4 1 0 –2 1
5–8 2 3–4 2
9 – 12 3 5-6 3
13 -16 4 7-8 4
17 - 20 5 9 - 10 5
Type of Hazard /Risk / Accident Point Injury Point Risk Point Point G
Danger Likelihood D Consequences E F (D + E + F)
6. Trip & fall into pile Very Likely 3 Minor Injury 1 High 3 7
hole in ground.
4. Lift-up of spun piles of various size & weight into piling machine 13 2
and piling works.
1 Unloading of spun pile, piling 1. Unload material / parts / spun piles in safe manner. Delivery Schedule
machine parts & equipments. 2. Inform workers during Safety Briefing of unloading Safety Briefing
activities. Falling object
3. Secure unloading area from trespassers. hazard
2 Install piling machinery parts 1. Ensure safe installation procedures for machinery Machinery Manual
and equipments. parts.
2. Work in pairs. Tool Box Meeting
4 Lifting of spun pile into piling 1. Ensure piling machine, lifting gear, wire rope sling Piling machine
machine in good condition. checklist
2. Check for fatigue, damaged, bird cage & broken
wires.
6 Trip & fall into pile hole 1. To cover-up exposed pile hole.
7 Operating piling machine 1. Operators to possess Sijil Operator Krin fro JKKP SOK
2. To operate in safe manner. Piling Plan
8 Excessive black smoke 1. To ensure periodic maintenance of piling machine. Maintenance Sch
2. To ensure compliance to environmental regulations. EQA 1984
9 Oil leakage from machines. 1. To maintain machinery in good condition. EQA 1984
2. Provide drip tray for leaking oil.
10 Noise pollution from piling 1. Wear ear protection at high noise level areas. Ear protection
works. 2. Ensure noise level kept to minimum.