FALIH SDN BHD JOB SAFETY ANALYSIS JSA/PILING 1 OF 5

DOC. NO. PAGE NO.

Project Ladang 3, Kuala Terengganu


Terengganu Ref. No HI / PILING

Title Hazard Identification Date Start Nov 19, 2011

Scope / Location Piling for Substructure


Substruct ure Completion March 19, 2012
Date
Personal Protective Safety helmet / safety boot /goggles Prepared
Prepar ed By Mohd Yahizan
Equipment
Safety Equipment Fire extinguisher / signage / safety Remark
signage
Machinery / Tool / 1. Hydraulic Injection Piling Manpower Supervisor
Supervisor –2
Equipment machine-3 nos. Surveyor – 1
Chainman – 1
2. Mobile crane -25 ton Cut-off pile head – 2
Piling Operator-3
Piling Worker - 10

 No WORK ACTIVITY


ACTIVITY HAZARD IDENTIFIED
IDENTIFIED SAFETY CONTROL
CONTROL REF

1 1. Mobilization of 3 numbers of 1. Hit by machine & parts 1. Ensure safe download 1. SOP
hydraulic piling machine, tool during unloading activity.  procedure.
equipments, counter weight and 2.Crane
 parts to site.
site. 2. Hit by spun piles during 2. Ensure mobile crane & checklist.
lifting down from trailers wire rope in good
2. Mobilization of various sizes working condition 3.Delivery
of spun piles to site. . Schedule
2 Installation,
Installat ion, testing & 1. Struck by moving parts 1. Installation manual Machinery
commissioning of piling during installation of machine Manual
machinery & equipments.

3 Survey work for piling point & 1. Surveyor/chainman


Surveyor/chainman knock 1. Beware movement of Piling Plan.
Install survey peg / Marking on down by piling machine  piling machinery.
machinery.
ground .
2. Trip & fall into exposed 2. Cover-up exposed pile
 pile hole. holes

4 Lift-up of spun piles of various 1. Wire rope snapped during 1. Regular checking of 1.PM Crane
size & weight and piling works lifting of spun pile into piling wire rope sling before 2. PMA
machine. lifting of spun piles. 3.SOK

2. Replace damaged wire


rope.
5 Welding of extension piles. 1. Spark & toxic gas from 1. Wear eye protection. Welder
welding works Certification
2. Wear gas mask.
6 Piling machine / generator
generat or set Ground contamination with 1. Regular maintenance EQA 1974
leaks oil onto ground oil. of machinery & gen set.

2. Provide drip tray.


FALIH SDN BHD JOB SAFETY ANALYSIS JSA/PILING 2 OF 5
DOC. NO. PAGE NO.

Project Ladang 3, Kuala Terengganu Ref No RAW / PILING

Title Risk Assessment of Worker Date November 19, 2011

ESTIMATED MANPOWER
Total workforce per day App. 17 workers Working Hours 8 hours per day

ASSESSMENT POINT
 No of Worker No of Point Exposure/Day No of Point
0–4 1 0 –2 1
5–8 2 3–4 2
9 – 12 3 5-6 3
13 -16 4 7-8 4
17 - 20 5 9 - 10 5

 No of Point Exposure Point Point C


TYPE OF HAZARD / RISK / DANGER Worker A hour/day B (A + B)
Exposed
1. Hit by falling machine, equipments, spun 4 1 4 2 3
 piles during unloading from low loader, trailers

2. Struck by moving parts during installation, 4 1 4 2 3


testing & commissioning of piling machines.

3. Knock down by piling machine during survey 2 1 4 2 3


& pegging work.

4. Lift-up of spun piles from ground into piling 4 1 8 4 5


machines & piling works

5. Spark & toxic gas from welding of extension 2 1 3 2 3


 piles.

6. Trip & fall into exposed pile hole in ground. 10 3 8 4 7

7. Operate piling machinery without Sijil 3 1 8 4 5


Operator Krin from JKKP.

8. Excessive black smoke from exhaust. 2 1 1 1 2

9. Oil leakage from hydraulic & machinery. 2 1 1 1 2

10. Excessive noise exposure. 4 1 4 1 2


FALIH SDN BHD JOB SAFETY ANALYSIS JSA/PILING 3 OF 5
DOC. NO. PAGE NO.

Project Ladang 3, Kuala Terengganu Ref No QRT / PILING

Title Qualitative Risk Table Date November 19, 2011

Accident Likelihood Point Injury Consequences Point Risk Point

Highly Unlikely 0 Nil 0 Nil 0


Unlikely 1 Minor Injury 1 Low 1
Likely 2 Major Injury 2 Medium 2
Very Likely 3 Fatal 3 High 3

Type of Hazard /Risk / Accident Point Injury Point Risk Point Point G
Danger Likelihood D Consequences E F (D + E + F)

1. Hit by falling piles / Likely 2 Major Injury 2 High 3 7


machines.

2. Struck by moving parts Likely 2 Minor Injury 1 Low 1 4


of machine during install.

3. Knock down during Likely 2 Minor Injury 1 Low 1 4


survey /pegging

4. Lift-up piles into Likely 2 Fatal 3 High 3 8


machine & piling works

5. Spark & toxic gas from Likely 2 Minor Injury 1 Medium 2 5


welding

6. Trip & fall into pile Very Likely 3 Minor Injury 1 High 3 7
hole in ground.

7. Unlicensed operator Likely 2 Nil 0 Nil 0 2

8. Excessive black smoke Likely 2 Nil 0 Nil 0 2

9. Oil leakage from Likely 2 Nil 0 Nil 0 2


machines

10. Noise pollution Likely 2 Nil 0 Nil 0 2


FALIH SDN BHD JOB SAFETY ANALYSIS JSA / PILING 4 OF 5
DOC. NO. PAGE NO.

Project Ladang 3, Kuala Terengganu Ref No HR / PILING

Title Hazard Ranking Date November 19, 2011

Type of Hazard / Risk /Danger Point H Hazard Ranking


(C + G )

1. Hit by falling machine, equipments, spun piles during unloading 10 3


from low loader, trailers.

2. Struck by moving parts during installation, testing & 7 5


commissioning of piling machinery.

3. Knock by piling machine during survey / pegging work. 7 7

4. Lift-up of spun piles of various size & weight into piling machine 13 2
and piling works.

5. Spark & toxic gas from welding of extension piles. 8 4

6. Trip & fall into exposed pile hole in the ground. 14 1

7. Operate piling machinery without SOK license. 7 6

8. Excessive black smoke from exhaust. 4 8

9. Oil leakage from machines. 4 9

10. Noise pollution from piling activities. 14 10


FALIH SDN BHD JOB SAFETY ANALYSIS JSA / PILING 5 OF 5
DOC. NO. PAGE NO.

Project Ladang 2, Kuala Terengganu Ref No RSM / PILING

Title Recommended Safety Measures Date November 19, 2011

 No Work Activity Recommended Safety Measures Remark

1 Unloading of spun pile, piling 1. Unload material / parts / spun piles in safe manner. Delivery Schedule
machine parts & equipments. 2. Inform workers during Safety Briefing of unloading Safety Briefing
activities. Falling object
3. Secure unloading area from trespassers. hazard

2 Install piling machinery parts 1. Ensure safe installation procedures for machinery Machinery Manual
and equipments.  parts.
2. Work in pairs. Tool Box Meeting

3 Survey work 1. Beware of movement of piling machine. Piling Schedule


& pegging 2. Ensure personal safety around machine

4 Lifting of spun pile into piling 1. Ensure piling machine, lifting gear, wire rope sling Piling machine
machine in good condition. checklist
2. Check for fatigue, damaged, bird cage & broken
wires.

5 Welding of extension piles 1. Welders to wear gas mask. Welding safety


2. Provide fire extinguisher at welding area.
3. Ensure welders possess welding certificate.

6 Trip & fall into pile hole 1. To cover-up exposed pile hole.

7 Operating piling machine 1. Operators to possess Sijil Operator Krin fro JKKP SOK
2. To operate in safe manner. Piling Plan

8 Excessive black smoke 1. To ensure periodic maintenance of piling machine. Maintenance Sch
2. To ensure compliance to environmental regulations. EQA 1984

9 Oil leakage from machines. 1. To maintain machinery in good condition. EQA 1984
2. Provide drip tray for leaking oil.

10 Noise pollution from piling 1. Wear ear protection at high noise level areas. Ear protection
works. 2. Ensure noise level kept to minimum.
CONTROL COPY NO

FALIH SDN BHD

JOB SAFETY ANALYSIS FOR PILING WORKS.

for

CADANGAN MEMBINA & MENYIAPKAN 1 BLOK RUMAH


MAMPU MILIK YANG MENGANDUNGI 24 LAPIS KEDIAMAN
(407 UNIT), 7 LAPIS TEMPAT LETAK KERETA BERTINGKAT
DAN KERJA-KERJA INFRASTRUKTUR
YANG BERKAITAN DI ATAS
LOT KERAJAAN, LADANG TOK PELAM
MUKIM BANDAR, DAERAH KUALA TERENGGANU,
KUALA TERENGGANU,
TERENGGANU DARUL IMAN.

DOCUMENT NO: JSA / PILING

JKKP SITE REGISTRATION NO: TG/

JSA / PILING NOVEMBER 19, 2011

Doc. No. Date MOHD YAHIZAN


Safety & Health Officer
Work Activity No.1: Unloading of spun piles/ material / machinery parts / equipments from trailers /
Hazard: Falling object from lifting activities.
Safety Control Measures: 1. Beware of lifting activities. 2. Secure lifting area against trespassers.

Work Activity No.2: Installation of machinery / equipments.


Hazard: Struck by moving parts.
Safety Control Measures: Beware of moving parts of machinery.
Work Activity No.3: Survey work / pegging / marking point for piling.
Hazard: Knock down by piling machine.
Safety Control Measures: Beware of machinery/ Wear luminous safety vest.

Work Activity No.4: Lifting of spun pile into piling machine.


Hazard: Spun fall down due to breakage of wire rope sling..
Safety Control Measures: Beware of lifting & piling by piling machinery
Work Activity No.5: Welding of extension pile.
Hazard: Spark & toxic gas from welding activities..
Safety Control Measures: Wear gas mask / Use blower to blow away gases..

Work Activity N0. 6: Exposed pile h ole in ground.


Hazard: Trip & fall due to uncovered hole.
Safety Control Measures: Cover-up pile hole with plywood.