DOC No ABG-742

PACKAGE “P” POWER PLANT PAGE No 1 of 2


YANBU III POWER AND DESALINATION PLANT REV 0
DATE

ENVIRONMENTAL INSPECTION CHECKLIST

No General Comment
1 Dust maintained to acceptable levels
2 Machinery noises properly managed
3 Workshop floors clean and free of spillages
4 Wash traps free of built up material
5 Wash areas in a clean state
6 Work areas free of waste concrete
7 No visible erosion
8 Refueling vehicles have drip trays
Are MSDS available with the refueling
9
vehicles
10 Is general housekeeping being done
Hazardous Materials
1 Containers are clearly labelled
Containers stored within a bund or roofed
2
and fenced area
3 Bunds free of cracks, water and spilt liquids
4 Valves on bund drainage are locked shut
Triple plate interceptors free of
5
hydrocarbons
6 MSDS's are available
7 Spill Kits are on site
8 Spill Kits are complete
9 Hazardous areas clearly identified
Waste Management
Bins have sufficient volume or are regularly
1
emptied
2 Sufficient bins for each waste type
3 Bins correclty labelled
4 Waste batteries appropriately stored
5 Oily rags and oil filters recycled
6 No contamination of waste streams
7 Site is generally clean and free of rubbish
Contamination
1 Ground free of contamination
2 Water not polluted
3 No oil leaks
4 Visible Concrete spills
Any hazardous waste/material not correctly
5
stored
DOC No ABG-742
PACKAGE “P” POWER PLANT PAGE No 2 of 2
YANBU III POWER AND DESALINATION PLANT REV 0
DATE

ENVIRONMENTAL INSPECTION CHECKLIST

6 Any visible signs of waste being burned


7 Are there any spillages at refuelling stations