JOB SAFETY ANALYSIS Date:
Page: 1 of 2

Project: Ajyal international School Project


Project#: Area:Dist Ajyal Dammam Saudi Arabia General Comments: Proper PPE, TBT should be conducted before start the job,
Access control authority would be DEL Site Manager/Site Engineer
Date: Supervisor:
Job Description: Work at Height
Detail of Equipment & Responsible Severity
Item
Activity
Risk Involved Control Measure
Tools used Person Rating
Area I/C 3
● MATERIAL CAN FALL. ● MATERIAL WILL BE FASTENED PROPERLY BEFORE
TRANSPORTING (Authorized
1 ● VEHICLES. TRANSPORTING TO SITE.
SCAFFOLDING Person).
2
MATERIAL AT ● PERSONAL INJURY. ● ONLY EXPERIENCED, SKILLED AND TRAINED
SITE.
PERSON SHOULD BE ALLOWED 3
● UNAUTHORIZED /
● SCAFFOLDI ● ALL HANDTOOLS SHOULD BE INSPECTED PRIOR TO
UNTRAINED/ 3
NG INEXPERIENCED START OF JOB
UNLOADING OF
MATERIALS PERSONNEL ON THE JOB ● SCAFFOLDING PIPES WITH CORROSION SHOULD
SCAFFOLDING 3
. (PIPES,
2 MATERIAL.
JOINTS, ● UNEVEN GROUND NOT BE USED.
PLANKS, 2
STORAGE OF BASE ● FAULTY/ POOR ● MATERIAL WILL BE UNLOADED WITH BOOM TRUCK
PLATE, TOE
SCAFFOLD CONDITION SCAFFOLDING ● CERTIFIED BOOM TRUCK OPERATOR WILL CARRY
BOARD & 3
MATERIAL. MATERIAL
etc.) OUT THE TASK.
● IMPROPER
3 ERECTION & ● MATERIAL WILL BE STORED IN A DESIGNATED AREA. 3
SCAFFOLDING ERECTION
DISMANTLING
OF ● .LEVEL ● TAG SYSTEM NOT ● MATERIAL WILL BE STORED ON SCAFFOLD RACKS.
SCAFFOLDING. STRIP, FOLLOWED. ● HARD BARRICADE AND SIGNAGE WILL BE PROVIDED
HAMMER, 3
METER TAP ● WRONG MATERIAL
4 & ROPE.
HANDLING/ FALLING OBJECT ● GROUND SURFACE SHOULD BE LEVELED

● RED TAG MUST BE PLACED/ HANGED AT THE START 3


● PERSONNEL INJURY.
OF SCAFFOLDING
● PERSONNEL FALL. ● ENSURE VERTICAL PIPES ALLIGNMENT AND CHECK
IT WITH HAND LEVEL
● OBJECT FALL.
● ENSURE ALL JOINTS ARE PROPERLY TIGHTENED
● PROPERTY LOSS ● USE BRACING PIPES AND OUTERRIGGERS PIPES
WHERE NECESSARY.
● ONLY CERTIFIED SCAFFOLDERS WILL PERFORM THE
JOB.
● SCAFFOLDERS WILL BE TRAINED ON SAFE WORKING
AT HEIGHT.
● ABOVE 1.8M HEIGHT SAFETY HARNESS WILL BE
WITH DOUBLE LANYARD. 100%TIE OFF WILL BE
ENSURED.
● SCAFFOLD PLATFORM WILL NOT BE OVERLOADED.

● HAND RAIL AND TOE BOARDS WILL BE INSTALLED


WITH SCAFFOLDING PLATFORM.
● ALL EMPLOYEES WILL WORK WITH PROPER PPES.

● LADDER SHOULD BE CONSTRUCTED AT SUITABLE.


● ELECTRIC SHOCK DUE
TO POWER LINE ● METAL PLANKS SHOULD BE PROERLY PLACED ON
PIPES WITH HOOKS AND USE BINDING WIRE FOR
BINDIND WHERE NECESSARY
● NO PERSON SHOULD GO IN DROP ZONE.
SCAFFOLDING AREA.
● AREA SHOULD BARRICATED WHILE ERECTION OR
DISMENTLING THE PLATFORM.

● AREA MUST BE CHECKED & FREE FROM ELECTRICAL


WIRES BEFORE ASSEMBLING TO THE CRANE.

OVERHEAD Area
● SCAFFOLD ● PERSONAL INJURY ● ENSURE OVERHEAD CLEARANCE WHILE
ELECTRICAL Representative
POWER LINES STRUCTUR OPERATING THE EQUIPMENT
● PROPERTY LOSS
E

5 NIGHT WORKING
ACTIVITIES ● LIGHTS ● HAND INJURY/EYE ● ENSURE WORKERS ARE COMPLYING PPE’S
Area I/C 2
INJURY REQUIRED. (Authorized
● STANDS Person).
Trdsssssdrttt ● ELECTRIC SHOCK / ● EXTINGUISHER MUST BE PRESENT AT ALL
3
ELECTROCUTION TIME

● IMPROPER ILLUMINATION ● LIGHT SHOULD BE PROPER PRIOR TO START


2
THE WORK.
● PERSONAL INJURY
● ALL POWER CABLES SHOULD BE INSPECTED
● PROPERTY LOSS AND INSULATED. 3

● LIGHTS SHOULD BE INSTALLED OVER HEAD


HEIGHT TO AVOID GLARING TO PERSONAL.

● IF GENERATOR USE FOR ELECTRICITY SHOULD BE


PROPERLY GROUNDED

● ALL TOWER CRANE LIGHTS SHOULD BE CHECKED


AND USE WHEREVER NECESSARY.

● HOUSEKEEPING 3
2
HOUSEKEEPING MANUAL CLEANING
6 OF AREA ● AREA BARRICADING AREA IN- 3
CHARGE
● PPE

● PROPERTY LOSS

● SLIP/TRIP

● FALL FROM HEIGHT

Severity Rating : (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage

(3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident

Are you aware of, and do you have the correct PPE? What are the risks? How do controlled risks?

_______________________________ __________________________
AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE