Sr. No. Observations Control measures Timescale


Hazards and consequences Immediately and longer term actions
1 I observed that flammable materials Immediate Action = containers Immediately
should be closed when not in use
and substances founded near
Short Term Action = Ensure 1 month
Electrical DB’s which may cause a that areas meet legal
requirements When
risk of fire or explosion.
Long Term Action=
needed
Store in approved storage
rooms and cabinets
2 I observed cigarettes buds near flammable Immediate Action = prohibit workers
Immediately
materials which may cause a risk of fire or to smoking in working/storage
explosion. areas Daily or
Short Term Action = Carry out Weekly
regular monitoring to check people to
follow safety rules. Two Months
Long Term Action=
Designated areas for Smoking
should be provided
3 Trip hazard were observed on pedestrians Immediate Action = proper fitting and
Immediately
Walk ways near computer room because managing
Of trailing cables. Of electrical wiring by a technical
Person. 3 days
Short Term Action = Inspection
should be made
To ensured that connection are Weekly
In good condition.
Long Term Action=
Arrangements of a tour with
Electrical engineering to check
Condition of wire.

4 I observed too much waste and spoiled Immediate Action = Remove the Immediately

/conversion/tmp/activity_task_scratch/549751908.doc
Material in kitchen like polythene bags waste material
Waste cooking oil which may cause slip From kitchen 1 week
Hazard. Short Term Action = Ensured
proper segregation By different 1 week
waste bins.
Long Term Action=
Ensure proper monitoring and
Supervision of good house keeping
In kitchen and dispose of kitchen
waste in designated area
5 I observed chemical and substances spillageImmediate Action = The flow should
Immediately
causing a risk of slip hazards. be cleaned, keep them free of
clutter. 1 day
Short Term Action = Keep walk
ways, platforms and clearly from of all
un necessary materials and obstacles.
When needed
Long Term Action=
Use bins for scrap and boxes for
nut bolts.
6 I observe that water pipe was left Immediate Action = Pipe should beImmediately
unattended on floor which may cause the properly rolled
risk of slip, trip and sever physical injure And placed on proper place. 1 day
Short Term Action = Ensuring
that area is clean and walk ways 1 week
are free from spillage.
Long Term Action=
Signage should be placed to warn
others from potential hazard.
7 I observed that poor sanitation system and Immediate Action = Provide a goodImmediately
Washing facility in motor car and heavy sanitation System and washing
Machine workshop. Causing a risk of facility. 2 weeks
biological hazards. Short Term Action = Sanitation
system already Available should 1 month
be inspected.
Long Term Action=
Sanitation system and Washing
facility should provide According to
legal requirements.
8 I observed that during storage there was a Immediate Action = provide Immediately
Risk of spillage and leakage oil and Spillage trays and kit. 2 days
Chemical from drums. Short Term Action = notices and
warning signs Should be placed
where Dangerous goods are 2 week

/conversion/tmp/activity_task_scratch/549751908.doc
stored.
Long Term Action=
Emergency evacuation procedures
and communications Flow chart
important contact Number and first aid
kit should be proved
9 I observe that oxygen bottles and acetylene Immediate Action = Separate Immediately
Was stored together which may cause a oxygen and fuel Gases.
Risk a fire or expulsion. Short Term Action = Cylinder 1 week
containing Flame able gases must
not be Stored in open proximity
closed, Or where other sources of
Ignition are present.
Long Term Action= 14 to 28 days
Sign should be placed where
flame able compressed gases
are present and appropriate pre
caution.

10 I observed that overloaded racks and Immediate Action = Orderly Immediately


Cabinets which may cause risk of injury arrangements and storage of
Or fatality due to falling of items from hight. materials. When needed
Short Term Action = Donot store
things on the top Of racks and
keep material tidy And stacked Time to Time
safety.
Long Term Action=
ensured that potential hazards
Of working in an office
Environments are highlighted.
11 I saw the excessive speed of forklift truck Immediate Action = Stop the Immediately
during of loading the boxes in ware house activities and Counselling with
this may cause risk of serious injury operator to reduce excessive
Accident like collision and over turning. speed. 2 to 3 days
Short Term Action = Put speed
limit signage in Ware house and
other precautionary signboards
and own main roads inside factory. Monthly
Long Term Action=
Adequate training should be
Provided to operators maintain
Signboards by strict supervision.
12 I observed risk of moving vehicles which Immediate Action = provision of Immediately

/conversion/tmp/activity_task_scratch/549751908.doc
May hit to the person during the over banks man to Control the vehicle
Turning of shafting and stacking materials. movements 1 day
Short Term Action = Ensure that all
areas are well Lit and isolate the
space. 1 week
Long Term Action=
Separate walk ways for Vehicle
and pedestrians should Be
Provided.
13 Fork Lift Truck were parked in the Immediate Action = Ask the Immediately
pedestrian walk ways with load in lifting operator to unload Goods and
operation causing a risk of falling load on parked in designated Area.
people cause a fracture disability and Short Term Action = Inspection Daily
Death. should be made to ensure proper
parking and unobstructed parking
area. Monthly
Long Term Action=
Provision of safety training to
Driver and proper monitoring to
Ensure safe system of work.
14 I observed that operator was lifting of Immediate Action = training in Immediately
Manually heavy items incorrectly. Which safe manual Handling be provided.
Might caused risk of back injury. Short Term Action = When 1 day
carrying bags put them On your
shoulder or hip. When needed
Long Term Action=
Use a lifting machinery and avoid
manual handling.

15 I observed an awkward posture during pipe Immediate Action = provide Immediately


Welding in workshop which may cause risk proper working platform according to
Of muscle strain. job nature. 1 week
Short Term Action = provision of
training Instruction information and
Supervision about job. Time to Time

Long Term Action=


To investigate the effect of
Specific health hazard of worker
So that short term and long term
Measures can be taken to control
Hazards.
16 Control panel area was not proper Immediate Action = provide 1 week

/conversion/tmp/activity_task_scratch/549751908.doc
Designed, operator has to adopt poor proper sitting arrangements
posture during work causing a risk a Short Term Action = reducing 1 to 2 month
WRULDs, MSDs, Back pain, Stress and the work hours by Providing
Fatigue. frequent job breaks and Rotation.
Long Term Action= Yearly
provision of ergonomically
Control panel and conduct
training
17 I observed that workers were using Immediate Action = Tools should be
1 day
Damage tools with broken handles which suitable for Task and environment
May cause risk of cuts, abrasion and and Properly insulated
Hammer head fly. Short Term Action = Provision of 2 days
PPE to minimize The
consequences 3 month
Long Term Action=
regular monitoring and Inspection
to check the condition Of tools.
18 I observed the risk of amputation part of Immediate Action = Adjust the Immediately
body due to lack of guard of crane exhaust fan
Guard according to Power
and water pump in industry. machine. 5 days
Short Term Action = Maintenance of
the guard, checks the condition
which are already adjust on the 2 weeks
moving part of the machinery.
Long Term Action=
Fixed the guard on all machinery
where necessary to protect the
worker.
19 In welding operation welder using electrode Immediate Action = provision of Immediately
Cutting without wearing PPEs and area face shield to Workers.
Was not well tidy. Which may cause risk of Short Term Action = Working area2 weeks
I problems and risk of fire. should be tidy And well lit.
Long Term Action=
Management provide health 3 month
surveillance training information,
Instruction and provide job rotation

20 I observed a risk of health due to poor Immediate Action = Install a 4 to 6 days


Ventilation system in warehouse. temporary ventilation System,
exhaust fan. 1 month
Short Term Action = Regularly
schedule maintenance and
cleaning procedure of ventilation 2 to 3 years

/conversion/tmp/activity_task_scratch/549751908.doc
system.
Long Term Action=
Ventilation system can be
Advanced
21 I observed the risk of inhalation of Immediate Action = Provision Immediately
Chemicals and hazardous substances and enforce to use RPEs.
Which may cause risk of inflammation to Short Term Action = Erection of 2 weeks
Eyes, dermatitis and respiratory problems appropriate LEV System.
Long Term Action= 6 month
Develop an effective monitoring
System and regular checks and
Health surveillance.

22 I observe the risk of obstructions of Immediate Action = Removal of Immediately


Electronics waste like blubs, tube lights, waste from
Washer and dryer on main walk ways. Walkways. 1 week
Which can cause foot injury. Short Term Action =
Segregation of electronics waste On going
and dump them in proper place.
Long Term Action=
Proper supervision and monitoring of
waste material by a competent and
responsible person
23 I observed risk of anaemia and cornea due Immediate Action = provision of Immediately
to emission of radiation during led jackets and film batch.
radiography Short Term Action = Cover the 3 days
all radiation emitted material with
radiation absorbent material.
Long Term Action= 1 week
Using a low exposure material
And provision of training,
Instruction and supervision.

24 I observed the noise hazard for workers Immediate Action = Check noise Immediately
who were working near a electric generator exposure, use Suitable PPEs,
Room Which may cause temporary or hearing protection 1 day
permanent hearing loss. Short Term Action = Provide job
rotation and Reduce exposure When needed
Time.
Long Term Action=
Provide hearing protection
Training and health surveillance.
25 I observed that there was a beautiful Commendable

/conversion/tmp/activity_task_scratch/549751908.doc
Carpeted and air-condition mosque for
Industry staff.
(Good practice)
26 I observed that fresh and filtered water was Commendable
Available at work place every where
(Good Practice)
27 I observed a good means of Commendable
Communication
(Good Practice)

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00425559________________________

Location Zain Engineering Company (Pvt) Ltd. Date of review 27 /03 /18

Introduction including overview of area inspected and activities taking place

/conversion/tmp/activity_task_scratch/549751908.doc
ZEC, now leading full services engineering company which is PEC registered, ISO
9001, 14001 and OHSAS 18001 certified was set up in 2002. Providing an arry
services in electrical, civil, mechanical and fire fighting engineering, installations,
services generator installations, electric panels.
Over the years ZEC has been privileged to work with different organizations and has
completed numerous commercial and industrial projects of national importance ZEC
has a quality management system and occupational health and safety management
system that satisfies all the requirements of ISO 9001, 14001, and OHSAS, 18001
and is committed to prevention of injury and ill health to his employers and others.
The authorized capital of the company as increased from rupees 80 million to rupees
120 million and the paid-up capital to Rs. 105 million.
Location 8 km Multan road Lahore 54000 Punjab, Pakistan.
The company as certified to confirm to ISO 9001, 2008, ISO 14001,2015 ISO
9001,2015 and OHSAS 18001, 2007.
ZEC is currently structured around major departments which are as follows.
 Manufacturing
 Engineering Design
 Quality Control
 Quality assurance
 Localization
 ISO Management Department
 Man power providers
 Maintenance
 Supply and purchase
 Ware house
 Marketing
 Administration
 Commercial
 Finance and Account
 Research and Development
 Imports
 Business Development
 Human Resources
Executive Summary

/conversion/tmp/activity_task_scratch/549751908.doc
It was pleasant to observe a high standard housekeeping in production area. There
was an appropriate amount of lighting inside and outside the building. The welfare
facilities like canteen, washrooms were of a good standard. In production area the
most of the machine operation was observed satisfactory.
However during the inspection it was identified that some areas poses a risk of
serious injuries or ill health and were in need of improvement. Areas of concern were
loose wiring, improper use of electrical facilities, improper use of power tools,
different types of welding facilities, chemical handling and storage facilities, manual
handling, cargo lift, fork lifter, poor health management of employees, handling and
storage of compressed gas cylinders. Poor stacking in warehouse, vehicle
movement through the plant, and also the increased risk of fire hazards as the
unintended use of fire water hydrant system was observed.
Most of hte problems are that were observed were related to lack of maintenance
and general lack of understanding of need for safety practices and good health and
also poor monitoring and inspection system of different area for continual
improvement. Recommendation includes development of safe instruction / method
statements, trainings of staff and preventive maintenance of equipments and display
of warning signs and monitoring of critical activities related to various areas which
are lowcost, particularly when related to the risks observed.
Detailed observations made during inspection were also attached with report.

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00425559________________________

Location Zain Engineering Company (Pvt) Ltd. Date of review 27 /03 /18

Main findings of the inspection

Chemical Storage

/conversion/tmp/activity_task_scratch/549751908.doc
There is risk chemical store near electrical DB,s. Chemical and dangerous goods
should always be moved on a specially designed area. Requires use of material
safety data sheets, requires of labels and other warnings and must be chemical to be
listed to control hazards and precaution to be explained. Engineering Controls Are
Usually Required. Fire/Explosion/Physical Hazard Data must be ensured &
Precautions for Safe Handling and Use, Control Measures/Protection Information,
Additional Infroamtion/Special precaustions must be ensured. All Chemical
containers will be labelled.

 The International labour Organization (ILO) has set out convention C155 and
Recommendation R164 which apply to work place health and safety
standards.
Slipping Hazards due to Spillage
There is high risk slipping due to Spillage of chemical and oils. According to ILO,
Health & safety Convention Employers shall be required to ensure that, so far as is
reasonably practicable, the chemical, physical and biological substances and agents
under their control are without risk to health when the appropriate measures of
protection are taken. The manager must ensure that there is proper housekeeping at
the workplace. Proper ensured Waste Management, Chemical / Spill
Management/Environmental Monitoring, Suitable waste containers will be provided
to facilitate safe and environmentally sound temporary storage. Collections will be
scheduled to prevent over-accumulation of wastes. Waste Collection Points (WCPs)
will have separate storage containers for prime recyclables (plastics, glass, ferrous
metals and non-ferrous metals) —SEGREGATION, Emergency Response action to
be taken in the event of a spill or fire. The Environmental Coordinator will undertake
regularly inspections to check that chemicals are properly stored, labeled and
handled. It is also the responsibility of all employees / subcontractors to ensure that
chemicals are properly stored, labelled and handled and that there is an MSDS
available for all chemicals. Trained Spill Response Teams; Provision of spill clean-up
and containment equipment / materials; Spill Contingency and Response training
and practice drills and Environmental Effects monitoring after a spill. Employee
ensured the time of spill, Spill Reporting, Amount of spill, Source of Spill, Location of
Spill, Proximity to Aspects.

/conversion/tmp/activity_task_scratch/549751908.doc
• According to Pakistan Environment Protection Act 1997: 1. Requires Employers to
carry out Risk Assessment 2. Make arrangements to implement necessary control
measures 3. Appoint competent people and arrangement for appropriate information
and training.

Vehicle Movement and Pedestrians

There is risk moving vehicle being hit by over turning. The employer has duty to
ensure the Watch for road signs, workers, and detours. Expect to encounter slow
trucks and other heavy moving construction traffic. Ensured Reduce moving vehicle
speed, especially on bridges, which may freeze before the road does. Avoid un-
necessary stops. You may lose momentum and/or control. Ensured all area should
be barricaded before shifting and handling of material with trained and competent
Banks Man. Provide all standard PPE,s to Banks man and other workers. Employers
has duty to according to legal requirement to provide a safe work place ,free from all
recognized hazards, prevent personal injuries between moving Equipment and those
workers' who are on foot. Conduct the employee's awareness training's regarding
heavy vehicle movement, Periodically Review Procedures, Restrict entry onto site of
non-essential personnel. Establish Controlled Entry Points to site. Coordinate
Operations of Various Trades Working in the Same Areas. Provide Fundamental Site
Rules and Training to all Persons at Risk. Adequate Lay-Down Areas Established,
Employees must learn, follows, and obeys established rules.

Lack of Guards
There is high risk of amputation part of body due to lack of guard. According to ILO,
Health & safety Convention, The legal responsibility for health and safety at work
rests primarily on the employer. The employer has a duty to provide & create the
safe place of work, safe plant and Equipment, All the machinery, tools, plant and
equipment used by employees at work should be reasonably safe and without health
risk. Employer, ensured to need inspect, service, repair and replace the defective
tools. Maintenance work often involves the removal or disabling of safeguards and
control systems. The employer is responsible for the safe condition of tools and
equipment used by employees but the employees have the responsibility for properly
using and maintaining tools.

/conversion/tmp/activity_task_scratch/549751908.doc
Noise Hazards

There is noise risk for the workers who are working near Electric generator. The
employers should ensure that workers working near electric generators have wear
ear defenders. Employers must provide baseline audiograms with in the first six
months of an employee's exposure to85 dB(A) or above (or one year if the company
industries uses mobile test services and annual audiograms must be provided
thereafter. Employers must monitor, at least once the noise exposure of workers
whose TWA are 85 dB or greater. Re-monitoring is necessary with a change in
equipment or work process that causes a significant increase in exposure level, All
continues, intermittent, and impulsive noise between the levels of 80 and 130 db
must be included in the exposure assessment area monitoring is permitted,
continuous, Workers must be allowed to observe the monitoring procedures and
must be told about their exposure. Hearing protection must be provided at no cost to
employees and must be worn all workers exposed to them. Employees must be
trained in the use and care of the protectors.

Radiation Hazards
During inspection radiation hazards were observed people were working without
PPE,s . As it has an acute and chronic effects,
So, employer has an obligation that:

1. General Public shall not be exposed to more than 1mSv per year.
2. Occupational exposure shall not exceed 20 mSv per year. The employer
should provide overhauls and film batch, covered all radiation material with
radiation observant material. Providing job rotation and provision of training
and health surveillance must be ensured.

 According to ILO, Occupation Safety and Health Convention, 1977: As far as


possible, the working environment shall be kept free from any hazard due to
radiation.

/conversion/tmp/activity_task_scratch/549751908.doc
UNIT GC3 – THE HEALTH AND Candidate report template
SAFETY PRACTICAL APPLICATION

Student number 00425559________________________

Location Zain Engineering Company (Pvt) Ltd. Date of review 27 /03 /18

Conclusions

/conversion/tmp/activity_task_scratch/549751908.doc
During the whole risk assessment process, Chemical handling and storage is found
a major week area in ZEC. Early attention, employees training with low cost can is
very useful to eliminate the risk. under the ILO occupational safety and Health
Convention C155; Article 16 (1) employers have a responsibility to ensure equipment
is safe, and also the employers responsibility in 1934 factories ACT, hazardous
substances act 2003, and Pakistan Environmental Protection ACT (PEPA) 1997.
Routine maintenance, monitoring and inspection system is identified as an area for
chemical and oil spillage where attention is needed. Lack of proper housekeeping
and storage of goods areas requiring immediately management attention placement
of proper housekeeping and removal of waste with help of low cost can eliminate the
risk. According to ILO occupational safety and Health Convention C155,
recommendations R 164, employers have a responsibility to ensure workplace is
safe and also the employers responsibility in 1934 factories ACT.
The poor maintenance of road, improper marking of roads and poor vehicle
management plan. unspecified speed limit, unidentified parking area are also the
week area which poses risk of collision of vehicle and personnel, And can be
improved through low cost and through communication and training of employees.
As according to ILO occupational safety and Health Convention C155, Article 16 (1)
employers have a responsibility to ensure equipment is safe, and also the employer's
responsibility in 1934 factories ACT.
As according to ILO occupational safety and Health Convention C155.Article 16 (1)
employers have a responsibility to ensure equipment is safe, and also the employers
responsibility in 1934 factories ACT. and compressed gas rule1970 it is employers
responsibility to provide guidelines for handling and storage compressed gas
cylinder and here in ZEC the it is a neglected portion of safety perspective and can
be improved maintenance of and with training and monitoring through involving of
low cost.
Fire prevention facilities are provided throughout the plant area but due to poor
maintenance. monitoring and lack of awareness it poses the increased risk of fire
hazards and need to be carried out immediately in order to comply with ILO
Guidelines on occupational safety and health Management System ( ILO-OSH) 2001
and ensure the safety of workers also to comply with 1934 factories ACT and
Pakistan Environmental ACT (PEPA) 1997 through involving low cost of
maintenance, monitoring and periodic inspections. Also training of workers should
have refresher training to remind them of the importance of fire prevention. This may

/conversion/tmp/activity_task_scratch/549751908.doc
include a wider problem: this should be evaluated as other workers may also need
similar training.
All the area identified in the findings of the report could result in the injury or a
fatality, which would cause suffering to the victims and their families. Employers
have a legal and moral duty of care to tack action and reduce the risks identified.
The inspection identified a number of good practices where storing management of
hazards was in place. including production line practices, and welfare facilities. The
good practices identified are commended and should be continued.
Health and safety needs to be of a high priority as failure to manage risk can lead to
prosecution or compensation claims, which can only have an adverse effect on the
ZEC’s reputations and financial position as well as the health and safety of the
people involved.
I suggest that my recommendation is implemented at the earliest opportunity
according to the priority allocated to them in the next section of the report. By doing
this, ZEC will openly demonstrate to all workers that their health and safety is being
taken seriously at all level of management. Also it will show that in the long term a,
positive health and safety culture is being developed, which will reduce the sizeable
costs attributed to accidents and enhance the reputation of the organization in a very
competitive market place.

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00425559________________________

Location Zain Engineering Company (Pvt) Ltd. Date of review 27 /03 /18

Recommendations – include as a table in the following format:

Recommendation Likely resource implications Priority Target date


Approximately Cost 20000 High 27-03-2018
(Chemical storage) PKR
A composite warning

/conversion/tmp/activity_task_scratch/549751908.doc
notice, which is
placed at the actual
location of the
dangerous goods
store, Subsidiary risk
levels will also be
applied to these
warning notices.
Copy of MSDS
located near storage
location.
Approimately Cost 100000 High 27-03-2018
Slipping, due to
spillage provision of
secondary
containment for
storage of chemical
to avoid spillage and
wastage of
chemicals. Provision
spill control kits.
Approximately Cost 35000 High 27-03-2018
Provision of proper PKR
stacking material
rack and sheds.
Safety warning signs
properly placed.
Moving vehicle and Approximately Cost High 27-03-2018
pedestrians walk 150000PKR
ways
Trained Banks man
shall be assigned,
wirings sing and road
barrier placement.
Flush light to be
installed during
heavy equipment
movement and
designated
pedestrians walk
ways should be
provided.

Approximately cost 20000 High 27-03-2018


Provide PPE,s as per PKR
MSDS for handling of
Dangerous goods
The total cost would be up High 27-03-201
Provision of to Rs.30,000
Guards:
Provision of guards,
all portable power

/conversion/tmp/activity_task_scratch/549751908.doc
cutter
Local exhaust Estimated cost is Rs High 30-03-2018
ventilation 2,00,000
Ventilation system for
dust removal
Noise and Radiation Approximately Cost 30000 High 27-03-2018
1. Provide the PKR include
Ear Muff and Documentation and admin
Ear canal to cost
control the
hearing loss.
2. Provide
overhauls and
led jackets to
control the
radiation
effects.