You are on page 1of 6

GC3 – THE HEALTH AND Candidate’s observation

SAFETY PRACTICAL APPLICATION sheet

Sheet number: __ of 6

Student name: PREETHAM SHETTY K Student number: 00458710

Place inspected: XYZ BUILDERS (MANGALORE) Date of inspection: 09 /11/2018

Sl.no Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
1 It was observed that a highly Remove combustible material away
combustible material is present from the worksite Immediately
near a hot working site
Provide a proper storage facility with
Risk of the material being proper ventilation 1 week
exposed to a spark ,causing
explosion and might lead to Provide supervision while hot
fatality and loss to property working Immediately
2 It was observed that cables Use or warning signs or elevate the
were passing across the position of the cables Immediately
walkway
Use of floor cord covers in order to
Risk of slip trip and fall which reduce the risk of slip and trip, and
might lead to injury or damage prevent damage to the cord 2 days
of products
3 It was observed that a person is Make sure the operator not have a Immediately
wearing loose clothes and no loose items while operating
proper PPE while operating a
grinding tool Provide necessary protective
equipment’s Immediately
Risk of entanglement with
moving part of the tool which Providing adequate training and
might lead to severe bleeding supervision when using the machine 1 week
due to cuts in the body

4 It was observed that a person Provide the worker with suitable PPE
was welding without any for eye and respiratory protection Immediately
suitable PPE
Provide a working space for welding
Risk of inhaling fumes or with proper exhaust system to draw
exposure of harmful fumes to away harmful fumes 4 days
naked eyes leading to health
related problems
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet

Sheet number: __ of 6

Student name: PREETHAM SHETTY K Student number: 00458710

Place inspected: XYZ BUILDERS (MANGALORE) Date of inspection: 09 /11/2018

5 It was found that workers Switch off the generator while


working near power generator anyone working near to it Immediately
where there is high noise
without proper ear protection Provide with ear defenders to the
workers Immediately
Risk of hearing loss and other
non-auditory diseases leading Relocate or enclose the generator
to stress away from the work area 1 week day

6 It was observed that there was Cut off the supply and replace the
wire around the resting area wires which are not properly
without proper insulation insulated Immediately

Risk of getting in contact with Put up warning signage’s Immediately


live wire leading to
electrocution or might cause a Reroute the wiring with proper
fire insulation away from the work area 4 days

7 It was observed that there were Adding necessary number of fire


no fire extinguishers found in extinguishers in the work area Immediately
the work area
Storage facility to be built to keep
Risk of human life, property the fire fighting equipment’s 1 week
without proper fire controlling
equipment’s in case of fire Inspections should be conducted on
the fire extinguishers in the work
area by a competent person 1 week

8 It was observed workers If possible to avoid working at height Immediately


working at height without body
harness /PPE Provision of PPE/ full body harness Immediately

Risk of falling from height Inspection of body harness and


leading fatality or severe injury training to be provided for workers
working at height 1 week
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet

Sheet number: __ of 6

Student name: PREETHAM SHETTY K Student number: 00458710

Place inspected: XYZ BUILDERS (MANGALORE) Date of inspection: 09 /11/2018

9 It was observed that the Stop the on-going work Immediately


scaffolding used have
insufficient bracing install the necessary bracings by a
trained scaffolding person Immediately
Risk of falling from height due
to weak set up of bracing Inspection of scaffolding before each
leading to injury or fatality work shift and after an occurrence
which could affect a scaffolds
structural integrity Daily

10 It was observed that there was Proper drinking water facility in


no proper drinking water facility bottles temporarily Immediately
provided in the work area

Risk of dehydration leading to A building with basic facilities like


dizziness, weakness in muscles drinking water, wash area and toilet 1 week
and headache near to the work area

11 It was observed that waste Cleaning the work area Immediately


materials were thrown all over
the place Segregate the materials and stack
properly in a designated area everyday
Risk of slip, trip and fall leading
to injuries

12 It was observed that worker is Regular break and rotation of work Immediately
exposed to heat for a long time
Provide Personal protective
Risk of dehydration leading to equipment while working under hot Immediately
dizziness headache and stress environment
while work
Provide with basic welfare facility 1 week
and suitable rest area
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet

Sheet number: __ of 6

Student name: PREETHAM SHETTY K Student number: 00458710

Place inspected: XYZ BUILDERS (MANGALORE) Date of inspection: 09 /11/2018

13 it was observed that there was Placing the barricade and signage’s
no proper barricade or around the excavation Immediately
signage’s put up where the
excavation is taking place Provide training to the workers and
supervise during the process 1 week
Risk of people falling or getting
trapped due to vibrations
caused by a moving vehicles
passing by which might lead to
suffocation or death
14 It was observed that a worker is Warning to be given not to smoke
smoking near a gas cylinder near any explosive material or the immediately
used for welding work area

Risk of explosion leading to Place warning signage’s at places


fatality and damage to property where highly combustible materials Immediately
are kept

Provide a smoking area where it is


safe from catching fire 4 days
15 It was observed that a tool fell Provide barricade under area where Immediately
from height from a worker who the work is taking place at height
was working at height
Netting to be put up under the work
Risk of tool falling on a person’s area so to provide any tools falling Immediately
head leading to severe injury from height

Provide with tool carrying belt so


that tool can be hooked onto the
belt every time 2 days
16 It was observed a truck driver Provide a banks man to guide the
reversing at the walkway driver while reversing Immediately

Risk of getting hit by a truck due Installation of reversing alarm in


to poor visibility of the driver vehicles 4 days
leading to fatality or injury
Provide separate lane for vehicles
and people and necessary training
for the drivers and the banks man 5days
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet

Sheet number: __ of 6

Student name: PREETHAM SHETTY K Student number: 00458710

Place inspected: XYZ BUILDERS (MANGALORE) Date of inspection: 09 /11/2018

17 It was observed workers Providing a helping hand to carry the


unloading stone block with block to minimize the manual
improper body posture handling risk Immediately

Risk of manual handling will Provide with trolley or any


lead to severe back injury and equipment to carry these stones 2 days
work related upper limb
disorder over a period of time Provide training on safe manual
handling to avoid any health related
problems 1 week
18 It was observed that a worker is Provide with necessary Personal Immediately
cutting and polishing the wood Protective Equipment to the worker
without any proper respiratory
mask Installation of exhaust system to
draw out wood dust from the work
Risk of inhaling the wood dust area 3 days
will cause breathing problems
which leads to lung cancer and
asthma
19 It was observed that empty Disposal of these chemical bottles as
paint cans were found near the quickly as possible away from
rest area as well as the place welfare area Immediate
where they have food
Provide training, instruction to the
Risk of entering of these workers and cleaners in safe
hazardous substance in to the handling of chemical substances 1 week
body leading to cancer or other
health issues
20 It was observed that a worker Limit the duration of drilling or let Immediately
drilling without wearing any there be rotation in work
protective equipment’s
Provide with necessary personal
Risk of temporary reduction of protective equipment’s Immediately
hearing loss or have tinnitus
feeling due to exposure of loud Health check-up campaign 1week
noise, due to a lot of vibration it
might affect the nerve and the
muscles making it weak
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet

Sheet number: __ of 6

Student name: PREETHAM SHETTY K Student number: 00458710

Place inspected: XYZ BUILDERS (MANGALORE) Date of inspection: 09 /11/2018

21 It was observed that first aid kit This is a good practice Monitoring
was maintained and available
for around 40 workers
22 It was observed that the
supervisor conducted a toolbox This is a good practice Monitoring
talk before the work started
23 It was observed that emergency This is a good practice Monitoring
contact details were put up
24 It was observed that the
machinery’s and tools used in This is a good practice Monitoring
the site were in good working
condition
25 It was observed that good
security measures were This is a good practice Monitoring
maintained from intruders or
trespassers entering the
worksite