You are on page 1of 2

Name: Zohaib Khan

UOL Safety, Health and Environmental Management-0


Roll No: MSPM02201027

OBSERVATION REPORT
S/No Observation Observed by Date & Venue Pictures

zohaib khan

25/10/2020
Observation: Edge Protection Missing

UOL
1 Control Measure: to avoid Fall Suitable and Standard
Edge Protection System must be in place

Observation: Worker at site without mandatory PPES,


Improper Access & Egress, Missing Edge Protection.
Exposed rebar's (Steel)

zohaib khan

25/10/2020
Control Measure: All Employees Must worn
Mandatory PPE's before entering site,

UOL
2 Safe Access & Egress Must be Provided prior to start
the work
to avoid Fall (Material or Personal) Suitable and
Standard Edge Protection System must be in place.
Rebar's cap must be placed on exposed rebar's (steel).

Observation: Improper Material Storage


Electrical Cable trailing on wet roadway and Steel Bars,
No Flag man in Place to control Vehicle Moment, No
Pedestrians walkway, poor housekeeping.
Control Measure: Material must be store in designated
storage area or Proper barricade with appropriate
zohaib khan

signage's must be in place before store material on


site. 25/10/2020

UOL
3 Electrical Cable must be protected from water,
material that can damage cable in order to avoid shock
and other related Electrical hazards.
Flag man must provided for safe movement of vehicles.
Pedestrians Walkway must separated from roadways
proper signage with speed limit and hard barricade
must be in place for safe entry and exit of workers.
Housekeeping must be maintain to avoid slip trips and
fire.

Observations: Missing edge Protection.


Material store on the edge.
Vehicles park at site.
zohaib khan

Control Measure: to avoid Fall (Material or Personal)


25/10/2020

Suitable and Standard Edge Protection System must


UOL

4 be in place.
Material must be always store away from unprotected
edges to avoid material fall on workers, equipment's
etc.
Vehicle must be park in designated parking area not
at site.

Observation: Poor Housekeeping, Unprotected


Opening, Un Secured Edges.
zohaib khan

25/10/2020

Control Measure: Good Housekeeping must be


maintain at site in order to avoid slip, trip and fire
UOL

5 occurrence, Unprotected Openings must be secured


with covers and Warning sigs must be in placed, All
unsecured edges must be secured by providing guard
rails.

Observation: No Access & Egress


Unsafe work at Height (WAH)
Control Measure: Unsafe work at height must be
zohaib khan

suspended and stop immediately for Height work


25/10/2020

Mandatory PPE's ( Helmet, Safety Shoes, Gloves,


UOL

6 Glasses etc.) and FPE's ( Safety Harness, Lifelines, Fall


block Arrestor Safety Net) Must be provided, Also Safe
access & Egress to work area must be provided before
starting the Activity. and The Area must be Barricaded
also Warning signs in place in different location to
avoid unauthorized entry .
zohaib khan

Observation: Poor Housekeeping, Un Secured Edges.


25/10/2020

Control Measure: Good Housekeeping must be


UOL

7 maintain at site in order to avoid slip, trip and fire


occurrence, All unsecured edges must be secured by
providing guard rails.

Observation: Workers at site without mandatory PPES,


Improper Access & Egress, Missing Edge Protection.
Exposed rebar's (Steel)
zohaib khan

25/10/2020

Control Measure: All Employees Must worn Mandatory


PPE's before entering site,
UOL

8 Safe Access & Egress Must be Provided prior to start


the work
to avoid Fall (Material or Personal) Suitable and
Standard Edge Protection System must be in place.
Rebar's cap must be placed on exposed rebar's (steel).
Observation: Improper Material Storage, No Flag man
in Place to control Vehicle Moment, No Pedestrians
walkway, poor housekeeping.
Control Measure: Material must be store in designated

zohaib khan
storage area or Proper barricade with appropriate

25/10/2020
signage's must be in place before store material on

UOL
9 site.
Flag man must provided for safe movement of vehicles.
Pedestrians Walkway must separated from roadways
proper signage with speed limit and hard barricade
must be in place for safe entry and exit of workers.
Housekeeping must be maintain to avoid slip trips and
fire.

Observation: Improper Material Storage


Electrical Cable trailing on wet roadway and Steel Bars,
No Flag man in Place to control Vehicle Moment, No
Pedestrians walkway, poor housekeeping.
Control Measure: Material must be store in designated
storage area or Proper barricade with appropriate

zohaib khan
signage's must be in place before store material on

25/10/2020
site.

UOL
10 Electrical Cable must be protected from water,
material that can damage cable in order to avoid shock
and other related Electrical hazards.
Flag man must provided for safe movement of vehicles.
Pedestrians Walkway must separated from roadways
proper signage with speed limit and hard barricade
must be in place for safe entry and exit of workers.
Housekeeping must be maintain to avoid slip trips and
fire.