Site Observation Report 026

Project: Building works at Hougang Town


Contract No: D/201/19
Compiled by: ALFREDO JR. A. CLARO Designation: RTO
Date: 027/7/2020 Document no: RTO-026
Attention to: Jared Mok/R Madhavan Designation: Contractor PM/WSHO
Date to respond:28/07/2020
SI Observation Photograph Remarks/Rectification
No measures and date
Photo taken: 27 JULY 2020 Photo To be taken : 28 July 2020

A 2 LCT WORKERS DESILTING


ALL THE HOLDING / SILT
SUMPS

B DE SILTING SUMP IN
PROGRESS BEHIND
SECIRITY GUARD ROOM
C SILTY WATER COMING OUT
FROM THE MAIN ENTRANCE
DOOR. TODAY HEAVY RAIN
ON OUR SITE. PLEASE
PREVENT ANY SILTY WATER
COMING OUT FROM OUR
PROJECT SITE.

Contrator PMgr/Date/Signature WSHO/Date/Signature


Jared Mok Ramachandran Madhavan