HSE Observation Report

Date: 17-11-2022
Potential
Location Action required /
S.no Issues Photograph Risk Rectification Close Out Photo
Recommendations
Level

Contractor need to
Operatives were Life
provide a safe & proper
found working Critical
working platform and
1 Basement- unsafe while conduct awareness
One
4 performing the job, working
training to the workforce day
potential risk of fall
regarding safe working
from height
platform

Observed that no Contractor must ensure Non-Life


Fire extinguisher that Fire extinguisher Critical
Basement- and fire watch 1>3
2 and Trained fire watch working
2 available at hot work must be in place during day
activity hot works
HSE Observation Report

Contractor need to
provide temporary Non-Life
Operatives were
closed / no access Critical
found working in
Level-1, warning signs if the 1>3
3 access without any working
A05 access is closed due to
warning signs of day
work to notify the
access is closed
workers in case of
emergency

Contractor need to Non-Life


ensure that all electrical Critical
Observed electrical
connections on site must 1>3
4 Basement- industrial plugs with working
be checked, all
2, 3 damaged cover. day
industrial plugs must
have cover
HSE Observation Report

Damaged power tool


was found on site, Contractor need to
Potential risk of ensure All power tools/ Non-Life
electrocution and electrical connections Critical
Basement- short circuits, and no 1>3
5 must be inspected prior working
2 monthly color code, to use by a competent day
Evidence that no person and color code
inspection being must be in place
conducted

Poorly routed
electrical cable was Non-Life
Contractor need to
observed, energized Critical
ensure that all Energized
cable was found 1>3
6 Basement- cables must be routed working
hanging at drive
2 separately from the day
access, potential risk
access
of cable hitting with
vehicles
HSE Observation Report

Contractor need to Non-Life


Observed that
ensure all operatives are Critical
operatives not
Basement- wearing Mask & provided with proper 1>3
7 working
2 PPE (safety glasses &
eye protection for day
mask ) and it is being
painting works
enforced to worn

Broken lights were Contractor must clear all Non-Life


observed on floor, the broken pieces on Critical
8 Basement- potential risk of floor properly, regular 1>3
4 injury, evidence that inspection to be working
no regular inspection conducted at all the day
conducted areas
HSE Observation Report

Contractor must advise


their operatives not to Non-Life
Found using use damaged ladders, Critical
9 Basement- Damaged A-type ensure that all defective 1>3
1 ladder by Meras and damaged ladders working
operatives must be removed from day
site.

Non-Life
No proper disposal Contractor need to Critical
Basement- of chemical waste 1>3
10 ensure that all chemical working
3 was observed waste disposed properly day
HSE Observation Report

Observed that the Contractor need to Non-Life


eye wash station ensure that all Critical
inspection tag is not emergency equipment 1>3
11 Basement- working
updated. No on site are checked and
1 day
evidence of current inspected in regular
inspection conducted basis

Contractor need to
advise their sub
Poor housekeeping contractor remove the Non-Life
was observed at waste from site on Critical
1>3
12 Basement- several places, regular basis, and working
2 evidence of Poor maintain a good day
Housekeeping housekeeping at all
over the building
premises

Prepared by:
Mohammed Vajid Ali
HSE Observation Report

Life Critical Major failure e.g. fatality, LTI, major injury, or Immediate> 1 Working day (if not temporary suspended)
dangerous occurrence
Non-Life Critical Potential Minor injury Incident, Environmental or 1 > 3 working day
Welfare Issue.
Good Practice N/A None however look to share good practice