Professional Documents
Culture Documents
Date Safety Date Safety Date Rectification Unsafe Observation Nearmiss Observation
Observation
Report # Observation Report Received Report Submitted
Report Inspected by Contractor. by Contractor
Open Item Closed Item Open Item
0 4 4 0
Date of System Corrective Action Taken (Reply Correction Status (Closed or
Report No. Location Description of observation Risk Level Comments
inspection Element by Contractor) Date Pending)