Revision:- R-2
Activity Name:- Concreting in Foundation Ref-RPPL/AL/SITE/JSA/010
Shilpa, Air Liquide, Nagpur
Location:- Butibori, Nagpur Date :
Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
Fall of person,
Work inside Improper access. Inspected ladder shall be use for access.
personal injury.
2 excavated pit and
Excavated material Personal injury, fall of
assess egress
like soil, boulder laid material Remove soil, boulder from the edge of excavated pit.
on pit edge.
Uneven surface Proper route shall be identified.
Personal injury, Vehicle should stop min 2 m from excavated pit edge.
3 Vehicle movement Vehicle fall down
Property damage
inside the pit Define route for entry and exit from work place.
Vehicle should be directed by trained person.
Provision of chute resting on ledger with proper tying
arrangement.
4 Hard Barricading Fall of person Personal injury
Check all excavated pit covered with hard barrication.Display
signage board near work place.
Area barricade to restrict entry.
Darkness, fall of Night work permit to be taken from concern engg.and safety dept.
Personal injury,
7 Work during dark hours person, fall of Ensure proper illumination during dark hours.
damage to property
machinery Electrical cable should lead min 3 m height. No exposed electrical
Route shall be illuminated.