DOC. TITLE Scaffolding Risk Assessment
Rev.

DOC NO. SECL Job no.

Risk
Activity / Basic Job steps Hazards Rating Mitigation /control measures

L M H

Matrix 1 2 3 4 5 Inspect issue and control use of PPE


Hold daily Tool Box meeting Lake of P.P.E Explain daily work activity
L
M
H
Matrix 1 2 3 4 5
When lifting/carrying scaffolding materials only carry recommended
Lifting/carrying scaffolding Strains / Back Injuries. amounts. Tie materials correctly when using a gin wheel and rope, if
materials, Low-level trip, slip or fall. L passing hand to hand, ensure receiver has the material in his/her grasp
Raising/lowering scaffold materials Head, hand, foot injuries. before releasing.
Wear correct type of gloves.
M Use correct manual handling techniques.
Undertake manual handling training.
Check gin wheel and rope in good order, exclusion zone in place
H
Operators must be trained, authorized and hold the relevant qualifications.
Being struck by vehicle or Outriggers must be fully extended.
Mechanical handling of materials. loads being moved to and Any slinging of materials must be undertaken by trained persons or under
Lorry mounted loader/crane. from goods vehicle. L the direct supervision of a trained person.
Those at risk: Scaffold, Inspect equipment before use.
West Qurna Field 2nd
Phase Project
(Early Oil Phase)
Page
DOC. TITLE Scaffolding Risk Assessment
Rev.

DOC NO. SECL Job no.

operatives, other site All equipment must be regularly maintained, tested and examined as
workers M statutory requirements.
driver and the Trained banks men to be used with all cranes and hiab lorries.
Public.
H
West Qurna Field 2nd
Phase Project
(Early Oil Phase)
Page
DOC. TITLE Scaffolding Risk Assessment
Rev.

DOC NO. SECL Job no.

Activity / Job step Hazards Mitigation /control measures

Installation of ties, ring bolts, Stability of scaffold. Eye and hearing protection to be worn during drilling operations.
anchors etc. Noise induced hearing loss. Ties/anchors & physical to be fixed/removed with the progress of the works.
Eye injuries.
Proper Use of Approved full body harness.
Safe system of work in place and briefing given to operatives.
Working at height When erecting/dismantling.
erecting/dismantling either tube and Falls of men and materials Install exclusion zone below the work area.
fitting or system scaffolding, Those at risk: scaffold operatives, Progressively position and fix ladders.
including staircases. others below work area. Erect ties as work proceeds.
Cease work if adverse weather prevails.
Install span set running lines.

Incomplete platforms Fall of men and materials Installation of hard barriers and relevant warning signage clearly displayed, to prevent access.

Access ladders must be tied at the top and footed or secured at the bottom.
Ladders & Step Ladders Head, body injuries. Steps standing on firm, level, non-slippery surface (not frosty, smooth concrete, hardboard
Fall of persons Possible fatality. etc.)
Ladder slipping Persons being injured by falling Ensure steps fully opened out and locked.
Falls of materials/equipment objects. Do not use if damaged, cracked etc.
Do not attempt to move ladder whilst persons or material still on it
Do not use ladders to support other platforms, scaffold boards etc.
Do not carry materials up ladders or steps.
Do not place loose items on a stepladder, attach it securely and remove before moving steps.
West Qurna Field 2nd
Phase Project
(Early Oil Phase)
Page
DOC. TITLE Scaffolding Risk Assessment
Rev.

DOC NO. SECL Job no.

Activity / Job step Hazards Mitigation /control measures

Secured Ladders
Use of a Scaffolding Fatal injuries. No removal of guardrails unless other safeguards against falling first provided.
Falls of persons Head and foot injuries, especially to Ladder access gaps in platforms staggered and protected with guardrail and self-closing gate
Falls of materials members of the public. etc.
Collapse of structure Crushing injuries. No gaps in guardrail over 470mm wide at any side of platform.
Unauthorized use Electric shock and burns, fire. Check scaffold boards for defects regularly for significant damage – cracks, cuts, notches, rot
Lightning strike/overhead cables etc.
Scaffolds to be erected altered or dismantled under qualified scaffolding supervisor
Scaffold checked after bad weather damage etc.
Use full body harness and 100% tie off

Fall prevention must be considered in the first instance, install span-set running lines, inertia
Rescue of someone who has had a Suspension trauma. blocks and protection decks.
fall when harness is attached to Injury to those carrying out the It is important that a rescue plan is in place and understood by the scaffold operatives before
anchor point rescue. work commences.
.
West Qurna Field 2nd
Phase Project
(Early Oil Phase)
Page
DOC. TITLE Scaffolding Risk Assessment
Rev.

DOC NO. SECL Job no.


West Qurna Field 2nd
Phase Project
(Early Oil Phase)
Page
DOC. TITLE Scaffolding Risk Assessment
Rev.

DOC NO. SECL Job no.

.
West Qurna Field 2nd
Phase Project
(Early Oil Phase)
Page
DOC. TITLE Scaffolding Risk Assessment
Rev.

DOC NO. SECL Job no.

.
.

You might also like