You are on page 1of 2

1 Activity Hazard Analysis (AHA)

2
Activity/Work Task: Erection and Dismantle of Scaffold at Overall Risk Assessment Code (RAC) (Use highest code)
Temple Tower
Project Location: McArthur Highway Urdaneta, Risk Assessment Code (RAC) Matrix
Pangasinan,Philippines
Contract Number: 1908-026 Probability
Severity
Date Prepared:MARCH 01 - 31, 2022 Frequent Likely Occasional Seldom Unlikely
Prepared by (Name/Title): Catastrophic E E H H M
RIAN KENNETH DE GUZMAN /SAFETY LEAD
Critical E H H M L
Reviewed by (Name/Title): Marginal H M M L L
Negligible M L L L L
Notes: (Field Notes, Review Comments, etc.) Step 1: Review each "Hazard" with identified safety "Controls" and determine RAC (See above)
"Probability" is the likelihood to cause an incident, near miss, or accident and
identified as: Frequent, Likely, Occasional, Seldom or Unlikely.
RAC Chart
"Severity" is the outcome/degree if an incident, near miss, or accident did occur and E = Extremely High Risk
identified as: Catastrophic, Critical, Marginal, or Negligible H = High Risk
Step 2: Identify the RAC (Probability/Severity) as E, H, M, or L for each "Hazard" on M = Moderate Risk
AHA. Annotate the overall highest RAC at the top of AHA. L = Low Risk
Job Hazards Controls RAC
Steps
1. Preparation of materials and area 1.1 Unstable ground conditions trenches 1.1.1 Select solid ground conditions. Place weight distribution timbers Moderate
excavations back filled parallel for soil board pads. Risk
1.2

2. Erection and Dismantling of Scaffold 2.1 Un-Authorized/Incompetent person 2.2.1 Only trained and certified by TESDA or other concern government High
agency shall required to installed scaffold. Risk
2.2 Collapse of Scaffold 2.2.2 Working loads, Work platforms and scaffold will be capable of
carrying the design load under varying circumstances depending up on the
condition of use.

3 Manual Handling/Lifting 3.1.1 Ensure buddy buddy system,Proper wearing of Hand gloves,Proper Low Risk
3.1 Caught-in between , Struck by,Pinch
point communication
.4.1 Back Strain
4.Hauling of Scaffold Materials Low Risk
4.2 Caught in between, caught-into, cut 4.1.1 Apply proper manual lifting technique will be impose in each manual
lift.
4.3 Ergonomics
4.1.2 Buddy buddy system

4.1.3 Proper wearing of hand gloves

5.1 Slip,trip and fall Low Risk


5. Housekeeping 5.2 5.2 Fall 5.1.1 Ensure 10 to 15 minutes for housekeeping before leaving work site

5.1.2 Clear all heights from falling materials

Training Requirements/Competent or
Equipment to be Used Inspection Requirements
Qualified Personnel name(s)
=Pipes =Scaffolder =NCII Certificates
=Clamps =Scaffold
=H-Frames
=Ledger
=Soil board
=Toe Board
=Cross Brace
=Ratchet

3 Revised Sept 2017