- Test all horns and lights, inspect all mirrors and windows for
defects and repair and replace before shipping to site
- All personnel on-site to be appropriately inducted before
initially engaging for work.
- Slip/trip/fall, - All workers including subcontractors must have completed
- Power line contact the Induction Training and hold a current card or
2. Mobilization of resources - Struck by moving equipment’s certification; Advise workers and other persons on site of L
- Caught in Between work to be carried out.
- All workers to attend STARRT to be aware of work/site
specific hazards, control and prevention.
- Appropriate PPE to be worn.
- Be aware of the location of the evacuation muster point and
safest route to it.
Doc. No: F5B-BMJV-0001-AHA-HSE 00 Rev No: 00 Rev. Date: 07-NOV-2020 Page 1 of 11
ACTIVITY HAZARD ANALYSIS (AHA)
FOR PRECAST MANHOLE CONSTRUCTION
6. Concrete Activities - Skin and eye irritation - All personnel to be trained in the proper use, storage and L
- Vibration affect injury (VWF) transportation of all chemicals in use.
- Concert burns from splashes from pouring concrete. - STARRT card will cover control measures including pinch
- Contamination of ground from spilt concrete. point and keeping hands and feet clear of them.
- Personnel to be given training on the dangers of working
with concrete. This will be done from a T.B.T and COSHH
training.
- All personnel to be kept clear of all material being lifted into
the work area.
- Only trained personnel will construct form work and all form
work will be inspected after completion and the inspection
documented.
- Only authorized personnel to be allowed in the work area.
- All personnel to be trained and competent in using all
machinery and equipment being used.
- All personnel forming re-bar to wear gloves and eye
protection.
- Personnel to be supervised and make sure that all body
parts (hands and fingers) are free from crush areas at all
13. Loading, transporting - Vehicles colliding with other site vehicles and - Loads to be covered before transportation. L
material and moving - Vehicle loading and unloading area too be clearly
Doc. No: F5B-BMJV-0001-AHA-HSE 00 Rev No: 00 Rev. Date: 07-NOV-2020 Page 5 of 11
ACTIVITY HAZARD ANALYSIS (AHA)
FOR PRECAST MANHOLE CONSTRUCTION
14. Personnel Movement in - Personnel getting injured from falling over tools - Make sure all housekeeping is done at all times and L
and around work zone. and material in the precast area designated pedestrian walk ways are provided and
- Damage to material and equipment signed.
- Fatal, Broken bones. - All material to be stored properly in a designated area and
- Bruising, strains and sprains. cordoned off with warning tape and cones.
- Work area to be maintained as clean and tidy
- All area to be cordon off and only authorized personnel
allowed in the work area.
- Also designated walk ways to be constructed for all
pedestrian access and egress and all signed.
- All openings to be covered and signs placed on top to
warn all not to remove and of the danger
- Barriers and fencing to be placed around precast area
with appropriate signage warning operatives and all
-Induction
-Tool box talks “importance of a tidy and clean site”
- Slips, Trip, Falls
-Correct PPE
- Dust
-Inspections
- Material Handling
-Material stacked ready for removal
19. Housekeeping - Fire L
-Waste removed
- Prick injuries
-Dust suppression
- Uneven ground
-Area graded when required
- Environmental damage
-De-nailing
-Spills cleared