Professional Documents
Culture Documents
4. Rarely (once in < 20 years) D. Medical Treatment / Damage 4 M = Medium Risk (ALARP, reduce to As Low As Reasonably Practicable).
H M M L L
5. Highly Unlikely (once in > 20 years) E. First Aid Injury 5 M M L L L L = Low Risk (Negligible / Tolerable, monitor and manage risk).
Mandatory PPE to be
PPE worn as
→ required
→
POST SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES
RISK REQUIREMENTS
4. Rarely (once in < 20 years) D. Medical Treatment / Damage 4 M = Medium Risk (ALARP, reduce to As Low As Reasonably Practicable).
H M M L L
5. Highly Unlikely (once in > 20 years) E. First Aid Injury 5 M M L L L L = Low Risk (Negligible / Tolerable, monitor and manage risk).
POST SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES
RISK REQUIREMENTS
4. Rarely (once in < 20 years) D. Medical Treatment / Damage 4 M = Medium Risk (ALARP, reduce to As Low As Reasonably Practicable).
H M M L L
5. Highly Unlikely (once in > 20 years) E. First Aid Injury 5 M M L L L L = Low Risk (Negligible / Tolerable, monitor and manage risk).
POST SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES
RISK REQUIREMENTS
Person fall in the trench Install stakes and warning tape around trenches
Dust goes in respiratory system Ground personnel to wear high visibility jackets
Mishandled or poorly placed material Remove debris and excavated soil near excavation
Excavated material or other objects site PPE
falling on workers Wear respiratory mask if working downwind Activity supervisor
Personnel hit by excavator, grader or High Place excavated material at safe distance from the First aid kit Low
wheel loader trench HSE Officer
Mobile equipment incident due to Never walk under and beside excavator loader, Warning tape
Excavation unstable adjacent structures wheel loader or front end loader and backhoe
works Workers go down in trenches while Be aware of nearby vehicles and mobile equipment High visibility jackets
trenching causing soil to vibrate
Back injury when working with shovel Keep heavy equipment away from trench edges
under bad posture Do not go down in the trench while excavating the
Personnel trip / falling hazards due to trench
excavated material Wear correct safety boots and mind steps / do not
Personnel get bite by snakes or rush
scorpions Watch for venomous animals and wear safety
Collision with underground utilities boots and leather gloves
Underground maps and utilities representative
present on site
Manual digging when required
4. Rarely (once in < 20 years) D. Medical Treatment / Damage 4 M = Medium Risk (ALARP, reduce to As Low As Reasonably Practicable).
H M M L L
5. Highly Unlikely (once in > 20 years) E. First Aid Injury 5 M M L L L L = Low Risk (Negligible / Tolerable, monitor and manage risk).
POST SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES
RISK REQUIREMENTS
Object / material / tools fall on Have correct back posture, good spinal alignment
personnel when working with shovel, pickaxe and rake
Personnel back injuries due to manual Team carrying loads over 25 Kg
lifting or bad posture when working with
hand tools
• Person fall in the trench • Install stakes and warning tape around trench
• Dust goes in respiratory system • Inspect trenches at the start of each shift.
• Mishandled or poorly placed • Remove debris and excavated soil near
material excavation site
• Excavated material or other • Wear respiratory mask if working downwind
objects falling on workers • Place excavated material at safe distance
• Personnel hit by screening from the trench
machine, excavator or wheel loader • Never walk under and beside excavator PPE
• Mobile equipment incident due to loader, wheel loader or screening machines
unstable adjacent structures • Be aware of nearby vehicles and mobile First aid kit Low Activity supervisor
Asphalting • Workers go down in the trench High equipment causing soil to vibrate
and while back filling • Keep heavy equipment away from trench Subterranean plan HSE Supervisor
Compacting • Back injury when working with edges
shovel under bad posture • Do not go down in the trench while excavator Awareness
• Personnel trip / falling hazards or screening machine is back filling trench
due to excavated material • Use proper ladder and have buddy system /
• Automotive vehicle accident watchman when worker maintaining filling material
inside the trench
• Wear correct safety boots and mind steps /
do not rush
• Park light vehicles away from activity
4. Rarely (once in < 20 years) D. Medical Treatment / Damage 4 M = Medium Risk (ALARP, reduce to As Low As Reasonably Practicable).
H M M L L
5. Highly Unlikely (once in > 20 years) E. First Aid Injury 5 M M L L L L = Low Risk (Negligible / Tolerable, monitor and manage risk).
POST SUPERVISORY
Activity POTENTIAL HAZARD RISK RISK CONTROL MEASURE RESOURCES
RISK REQUIREMENTS
Chemical contact with skin (Skin Wear chemical gloves / plastic gloves long sleeves
Irritation) Wear face shield or safety goggles
Chemical contacts with eyes Rinse eyes immediately with fresh water
Chemical pouring on the coverall or Wear plastic coveralls / Tyvex coveralls
clothes Avoid spill of chemicals, proceed carefully PPE
Chemical spill on the ground Collect empty cans and bring back to plant area Activity supervisor
Use of Throwing empty chemical cans in the High Keep fire away from chemicals, never smoke Eye wash Low
chemicals desert Fire extinguisher in place HSE Officer
(Cement) Fire catching on chemicals Follows instruction as per MSDS (Material safety MSDS
Allergy to skins data Sheet)
Dermatitis Seek guidance for the manufacturer document First Aid Kit
Abrasion Reduce exposure to chemical
Breathing chemical spray Avoid manual handling over 25 kg
Manual handling
Equipment and tools remain on site Put back equipment to proper place Plastic bags Activity supervisor
House Slip trip and fall Medium Clear all work place from trash Low
keeping Trash left in the work place Segregate trash Trash bins HSE Officer
4. Rarely (once in < 20 years) D. Medical Treatment / Damage 4 M = Medium Risk (ALARP, reduce to As Low As Reasonably Practicable).
H M M L L
5. Highly Unlikely (once in > 20 years) E. First Aid Injury 5 M M L L L L = Low Risk (Negligible / Tolerable, monitor and manage risk).