You are on page 1of 117

Area: KP26-32

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
AIMEN LAJDEL
RETEL Manpower
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI

Name

ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEM


Type
PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.

* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.

*All site workforce are wearing proper PPE

*Every work spot is under RETEL HSSE supervision


HSSE LOWLIGHTS / HAZARDS and FINDING
* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK

* LACK OF MEDICAL ASSISSTANCE IN THE FIELD

* Missing PPE onsite, issue cleared with the procurement departement; Waiting for the delivery scheduled to be don

* Missing Safety/Road signs onsite, issue cleared with the procurement departement; Waiting for the delivery schedu
furniture
PICTURES
Other Concerns / Observations
DAILY HSSE REPORT

TBL PROJECT

Weather Conditions : Clear Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
MOUNIR MRAD
12/10/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final & TOPOGRAPHY SURVEY
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR ON
HSE SUPERVISOR ON
ACITIVITY SUPERVISOR ON
OPERATOR ON
OPERATOR ON
OPERATOR OFF
WORKER ON
WORKER ON
WORKER OFF
WORKER ON
OPERATOR ON
WORKER ON
WORKER ON
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC ON
QA/QC ON
LOGISTIQUE COORDINATOR ON
Driving
Qualification
Authorization

TRANSPORTATION & JOURNEY MANAGEMENT


Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
17 396
204 2556
1 21
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.

ke sure that all the team proceed it in a safe manner.

HSSE LOWLIGHTS / HAZARDS and FINDINGS


BORS CLIMB ON THE TRUCK

LD

ent departement; Waiting for the delivery scheduled to be done on Friday 7th December 2018

he procurement departement; Waiting for the delivery scheduled to be done on Friday 7th December 2018 ith the rest of the

PICTURES
Other Concerns / Observations
12/10/2018

& TOPOGRAPHY SURVEY

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

Site HSE Induction & Orientation

NT
Kilometers
Field operation start to date
3500
3350
1850
0
0
0
8700

Field operations start to date


396
2556
21
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0

on Friday 7th December 2018

ed to be done on Friday 7th December 2018 ith the rest of the


Area: KP26-32

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
RETEL Manpower AIMEN LAJDEL
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI
Name

ETAP Manpower
ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEMEN

Type

PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.
* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.
*All site workforce are wearing proper PPE
*Every work spot is under RETEL HSSE supervision
HSSE LOWLIGHTS / HAZARDS and FINDINGS
* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK
* LACK OF ROLL BARS INSIDE PICK UPS
* LACK OF MEDICAL ASSISSTANCE IN THE FIELD
* Missing PPE onsite, issue cleared with the procurement departement; Waiting for the delivery scheduled to be done on
* Missing Safety/Road signs onsite, issue cleared with the procurement departement
*Copies of all inspection certificates should be present on site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


DAILY HSSE REPORT

TBL PROJECT

Weather Conditions :Clear Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
MOUNIR MRAD
12/11/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final & TOPOGRAPHY SURVEY
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR ON
HSE SUPERVISOR OFF
ACITIVITY SUPERVISOR ON
OPERATOR ON
OPERATOR ON
OPERATOR OFF
WORKER ON
WORKER ON
WORKER OFF
WORKER ON
OPERATOR ON
WORKER ON
WORKER ON
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC ON
QA/QC ON
LOGISTIQUE COORDINATOR ON
Driving
Qualification
Authorization
TRANSPORTATION & JOURNEY MANAGEMENT
Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
15 411
180 2736
1 22
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.
ke sure that all the team proceed it in a safe manner.
HSSE LOWLIGHTS / HAZARDS and FINDINGS
BORS CLIMB ON THE TRUCK

LD
ent departement; Waiting for the delivery scheduled to be done on Friday 7th December 2018
he procurement departement
site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


12/11/2018

& TOPOGRAPHY SURVEY

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Site HSE Induction & Orientation
NT
Kilometers
Field operation start to date
3750
3550
2050
0
0
0
9350

Field operations start to date


411
2736
22
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0
S

on Friday 7th December 2018


Area: KP27-32

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
RETEL Manpower AIMEN LAJDEL
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI
Name

ETAP Manpower
ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEM

Type

PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.
* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.
*All site workforce are wearing proper PPE
*Every work spot is under RETEL HSSE supervision

HSSE LOWLIGHTS / HAZARDS and FINDING


* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK
* LACK OF ROLL BARS INSIDE PICK UPS
* LACK OF MEDICAL ASSISSTANCE IN THE FIELD
* Missing PPE onsite, issue cleared with the procurement departement; Waiting for the delivery scheduled to be don
* Missing Safety/Road signs onsite, issue cleared with the procurement departement
*Copies of all inspection certificates should be present on site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


DAILY HSSE REPORT

TBL PROJECT

Weather Conditions :Clear Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
MOUNIR MRAD
12/12/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final & TOPOGRAPHY SURVEY
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR ON
HSE SUPERVISOR ON
ACITIVITY SUPERVISOR ON
OPERATOR ON
OPERATOR ON
OPERATOR OFF
WORKER ON
WORKER OFF
WORKER ON
WORKER ON
OPERATOR ON
WORKER ON
WORKER ON
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC ON
QA/QC ON
LOGISTIQUE COORDINATOR ON
Driving
Qualification
Authorization
TRANSPORTATION & JOURNEY MANAGEMENT
Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
17 428
204 2940
1 23
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.
ke sure that all the team proceed it in a safe manner.

HSSE LOWLIGHTS / HAZARDS and FINDINGS


BORS CLIMB ON THE TRUCK

LD
ent departement; Waiting for the delivery scheduled to be done on Friday 7th December 2018
he procurement departement
site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


12/12/2018

& TOPOGRAPHY SURVEY

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Site HSE Induction & Orientation
NT
Kilometers
Field operation start to date
4000
3750
2250
0
0
0
10000

Field operations start to date


428
2940
23
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0

on Friday 7th December 2018


Area: KP27-36

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
RETEL Manpower AIMEN LAJDEL
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI
Name

ETAP Manpower
ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEM

Type

PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.
* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.
*All site workforce are wearing proper PPE
*Every work spot is under RETEL HSSE supervision

HSSE LOWLIGHTS / HAZARDS and FINDING


* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK
* LACK OF ROLL BARS INSIDE PICK UPS
* LACK OF MEDICAL ASSISSTANCE IN THE FIELD
* Missing PPE onsite, issue cleared with the procurement departement; Waiting for the delivery scheduled to be done on Fr
* Missing Safety/Road signs onsite, issue cleared with the procurement departement
*Copies of all inspection certificates should be present on site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


DAILY HSSE REPORT

TBL PROJECT

Weather Conditions :Clear Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
MOUNIR MRAD
12/13/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final & TOPOGRAPHY SURVEY
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR ON
HSE SUPERVISOR ON
ACITIVITY SUPERVISOR OFF
OPERATOR ON
OPERATOR ON
OPERATOR OFF
WORKER ON
WORKER OFF
WORKER ON
WORKER ON
OPERATOR ON
WORKER ON
WORKER OFF
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC ON
QA/QC ON
LOGISTIQUE COORDINATOR OFF
Driving
Qualification
Authorization
TRANSPORTATION & JOURNEY MANAGEMENT
Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
14 442
180 3120
1 24
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.
ke sure that all the team proceed it in a safe manner.

HSSE LOWLIGHTS / HAZARDS and FINDINGS


BORS CLIMB ON THE TRUCK

LD
departement; Waiting for the delivery scheduled to be done on Friday 7th December 2018
procurement departement
site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


12/13/2018

& TOPOGRAPHY SURVEY

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Site HSE Induction & Orientation
NT
Kilometers
Field operation start to date
4250
3950
2450
0
0
0
10650

Field operations start to date


442
3120
24
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0

ay 7th December 2018


Area: KP27-36

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
RETEL Manpower AIMEN LAJDEL
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI
Name

ETAP Manpower
ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEM

Type

PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.
* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.
*All site workforce are wearing proper PPE
*Every work spot is under RETEL HSSE supervision

HSSE LOWLIGHTS / HAZARDS and FINDING


* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK
* LACK OF ROLL BARS INSIDE PICK UPS
* LACK OF MEDICAL ASSISSTANCE IN THE FIELD
* Missing PPE onsite, issue cleared with the procurement departement; Waiting for the delivery scheduled to be done on Fr
* Missing Safety/Road signs onsite, issue cleared with the procurement departement
*Copies of all inspection certificates should be present on site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


DAILY HSSE REPORT

TBL PROJECT

Weather Conditions :Clear Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
MOUNIR MRAD
12/14/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final & TOPOGRAPHY SURVEY
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR ON
HSE SUPERVISOR ON
ACITIVITY SUPERVISOR ON
OPERATOR ON
OPERATOR ON
OPERATOR OFF
WORKER ON
WORKER ON
WORKER ON
WORKER ON
OPERATOR ON
WORKER ON
WORKER ON
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC ON
QA/QC ON
LOGISTIQUE COORDINATOR ON
Driving
Qualification
Authorization
TRANSPORTATION & JOURNEY MANAGEMENT
Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
18 460
180 3300
1 25
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.
ke sure that all the team proceed it in a safe manner.

HSSE LOWLIGHTS / HAZARDS and FINDINGS


BORS CLIMB ON THE TRUCK

LD
departement; Waiting for the delivery scheduled to be done on Friday 7th December 2018
procurement departement
site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


12/14/2018

& TOPOGRAPHY SURVEY

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Site HSE Induction & Orientation
NT
Kilometers
Field operation start to date
4500
4150
2650
0
0
0
11300

Field operations start to date


460
3300
25
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0

ay 7th December 2018


Area: KP29-36

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
RETEL Manpower AIMEN LAJDEL
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI
Name

JED JRAD

ETAP Manpower
ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEM

Type

PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.
* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.
*All site workforce are wearing proper PPE
*Every work spot is under RETEL HSSE supervision
*Check machines and tools before use
HSSE LOWLIGHTS / HAZARDS and FINDING
* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK
* LACK OF ROLL BARS INSIDE PICK UPS
* LACK OF MEDICAL ASSISSTANCE IN THE FIELD
* Missing PPE onsite, issue cleared with the procurement departement; Waiting for the delivery scheduled to be done on Fr
* Missing Safety/Road signs onsite, issue cleared with the procurement departement
*Copies of all inspection certificates should be present on site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


DAILY HSSE REPORT

TBL PROJECT

Weather Conditions :STORM Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
MOUNIR MRAD
12/15/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR OFF
HSE SUPERVISOR ON
ACITIVITY SUPERVISOR OFF
OPERATOR ON
OPERATOR ON
OPERATOR OFF
WORKER ON
WORKER OFF
WORKER ON
WORKER ON
OPERATOR ON
WORKER ON
WORKER OFF
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC OFF
QA/QC OFF
LOGISTIQUE COORDINATOR OFF
Driving
Qualification
Authorization
MECHANICAL SUPERVISOR NO
TRANSPORTATION & JOURNEY MANAGEMENT
Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
11 471
180 3480
1 26
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.
ke sure that all the team proceed it in a safe manner.

HSSE LOWLIGHTS / HAZARDS and FINDINGS


BORS CLIMB ON THE TRUCK

LD
departement; Waiting for the delivery scheduled to be done on Friday 7th December 2018
procurement departement
site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


12/15/2018

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Site HSE Induction & Orientation

YES
NT
Kilometers
Field operation start to date
4750
4350
2850
0
0
0
11300

Field operations start to date


471
3480
26
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0

ay 7th December 2018


Area: KP30-38

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
RETEL Manpower AIMEN LAJDEL
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI
Name

JED JRAD

ETAP Manpower
ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEMEN

Type

PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.
* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.
*All site workforce are wearing proper PPE
*Every work spot is under RETEL HSSE supervision
*Check machines and tools before use
HSSE LOWLIGHTS / HAZARDS and FINDINGS
* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK
* LACK OF ROLL BARS INSIDE PICK UPS
* LACK OF MEDICAL ASSISSTANCE IN THE FIELD
* Missing PPE onsite, issue cleared with the procurement departement; Waiting for the delivery scheduled to be done on Friday
* Missing Safety/Road signs onsite, issue cleared with the procurement departement
*Copies of all inspection certificates should be present on site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


DAILY HSSE REPORT

TBL PROJECT

Weather Conditions :CLEAR Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
MOUNIR MRAD
12/15/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR OFF
HSE SUPERVISOR ON
ACITIVITY SUPERVISOR ON
OPERATOR ON
OPERATOR ON
OPERATOR OFF
WORKER ON
WORKER ON
WORKER ON
WORKER ON
OPERATOR ON
WORKER ON
WORKER OFF
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC ON
QA/QC ON
LOGISTIQUE COORDINATOR ON
Driving
Qualification
Authorization
MECHANICAL SUPERVISOR NO
TRANSPORTATION & JOURNEY MANAGEMENT
Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
16 487
180 3660
1 27
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.
ke sure that all the team proceed it in a safe manner.
HSSE LOWLIGHTS / HAZARDS and FINDINGS
BORS CLIMB ON THE TRUCK

LD
departement; Waiting for the delivery scheduled to be done on Friday 7th December 2018
procurement departement
site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


12/16/2018

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Site HSE Induction & Orientation

YES
NT
Kilometers
Field operation start to date
5000
4550
3050
0
0
0
12600

Field operations start to date


487
3660
27
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0
S

ay 7th December 2018


Area: KP30-38

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
RETEL Manpower AIMEN LAJDEL
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI
Name

JED JRAD

ETAP Manpower
ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEMEN

Type

PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.
* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.
*All site workforce are wearing proper PPE
*Every work spot is under RETEL HSSE supervision
*Check machines and tools before use
HSSE LOWLIGHTS / HAZARDS and FINDINGS
* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK
* LACK OF ROLL BARS INSIDE PICK UPS
* LACK OF MEDICAL ASSISSTANCE IN THE FIELD
* Missing PPE onsite, issue cleared with the procurement departement; Waiting for the delivery scheduled to be done on Friday
* Missing Safety/Road signs onsite, issue cleared with the procurement departement
*Copies of all inspection certificates should be present on site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


DAILY HSSE REPORT

TBL PROJECT

Weather Conditions :CLEAR Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
MOUNIR MRAD
12/17/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR ON
HSE SUPERVISOR ON
ACITIVITY SUPERVISOR ON
OPERATOR ON
OPERATOR ON
OPERATOR OFF
WORKER ON
WORKER OFF
WORKER ON
WORKER ON
OPERATOR ON
WORKER ON
WORKER ON
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC ON
QA/QC ON
LOGISTIQUE COORDINATOR ON
Driving
Qualification
Authorization
MECHANICAL SUPERVISOR NO
TRANSPORTATION & JOURNEY MANAGEMENT
Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
16 503
180 3840
1 28
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.
ke sure that all the team proceed it in a safe manner.
HSSE LOWLIGHTS / HAZARDS and FINDINGS
BORS CLIMB ON THE TRUCK

LD
departement; Waiting for the delivery scheduled to be done on Friday 7th December 2018
procurement departement
site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


12/17/2018

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Site HSE Induction & Orientation

YES
NT
Kilometers
Field operation start to date
5250
4750
3250
0
0
0
13250

Field operations start to date


503
3840
28
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0
S

ay 7th December 2018


Area: KP30-38

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
RETEL Manpower AIMEN LAJDEL
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI
Name

JED JRAD

ETAP Manpower
ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEMEN

Type

PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.
* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.
*All site workforce are wearing proper PPE
*Every work spot is under RETEL HSSE supervision
*Check machines and tools before use
HSSE LOWLIGHTS / HAZARDS and FINDINGS
* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK
* LACK OF ROLL BARS INSIDE PICK UPS
* LACK OF MEDICAL ASSISSTANCE IN THE FIELD
* Missing PPE onsite, issue cleared with the procurement departement; Waiting for the delivery scheduled to be done on Friday
* Missing Safety/Road signs onsite, issue cleared with the procurement departement
*Copies of all inspection certificates should be present on site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


DAILY HSSE REPORT

TBL PROJECT

Weather Conditions :CLEAR Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
MOUNIR MRAD
12/18/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR ON
HSE SUPERVISOR ON
ACITIVITY SUPERVISOR ON
OPERATOR ON
OPERATOR ON
OPERATOR OFF
WORKER ON
WORKER ON
WORKER ON
WORKER ON
OPERATOR ON
WORKER ON
WORKER ON
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC ON
QA/QC ON
LOGISTIQUE COORDINATOR ON
Driving
Qualification
Authorization
MECHANICAL SUPERVISOR NO
TRANSPORTATION & JOURNEY MANAGEMENT
Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
17 520
180 4020
1 29
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.
ke sure that all the team proceed it in a safe manner.
HSSE LOWLIGHTS / HAZARDS and FINDINGS
BORS CLIMB ON THE TRUCK

LD
departement; Waiting for the delivery scheduled to be done on Friday 7th December 2018
procurement departement
site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


12/18/2018

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Site HSE Induction & Orientation

YES
NT
Kilometers
Field operation start to date
5500
4950
3450
0
0
0
13900

Field operations start to date


520
4020
29
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0
S

ay 7th December 2018


Area: KP31-38

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
RETEL Manpower AIMEN LAJDEL
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI
Name

ETAP Manpower
ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEMEN

Type

PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.
* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.
*All site workforce are wearing proper PPE
*Every work spot is under RETEL HSSE supervision
*Check machines and tools before use
HSSE LOWLIGHTS / HAZARDS and FINDINGS
* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK
* LACK OF ROLL BARS INSIDE PICK UPS
* LACK OF MEDICAL ASSISSTANCE IN THE FIELD
* Missing PPE onsite, issue cleared with the procurement departement; Waiting for the delivery scheduled to be done on Friday
* Missing Safety/Road signs onsite, issue cleared with the procurement departement
*Copies of all inspection certificates should be present on site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


DAILY HSSE REPORT

TBL PROJECT

Weather Conditions :CLEAR Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
MOUNIR MRAD
12/19/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR ON
HSE SUPERVISOR ON
ACITIVITY SUPERVISOR ON
OPERATOR ON
OPERATOR ON
OPERATOR OFF
WORKER ON
WORKER ON
WORKER ON
WORKER ON
OPERATOR ON
WORKER ON
WORKER ON
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC ON
QA/QC ON
LOGISTIQUE COORDINATOR ON
Driving
Qualification
Authorization
TRANSPORTATION & JOURNEY MANAGEMENT
Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
18 538
180 4200
1 30
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.
ke sure that all the team proceed it in a safe manner.
HSSE LOWLIGHTS / HAZARDS and FINDINGS
BORS CLIMB ON THE TRUCK

LD
departement; Waiting for the delivery scheduled to be done on Friday 7th December 2018
procurement departement
site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


12/19/2018

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Site HSE Induction & Orientation
NT
Kilometers
Field operation start to date
5750
5150
3650
0
0
0
14550

Field operations start to date


538
4200
30
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0
S

ay 7th December 2018


Area: KP31-38

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
RETEL Manpower AIMEN LAJDEL
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI
Name

AHMED GATTOUFI

ETAP Manpower
ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEMEN

Type

PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.
* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.
*All site workforce are wearing proper PPE
*Every work spot is under RETEL HSSE supervision
*Check machines and tools before use
HSSE LOWLIGHTS / HAZARDS and FINDINGS
* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK
* LACK OF ROLL BARS INSIDE PICK UPS
* LACK OF MEDICAL ASSISSTANCE IN THE FIELD
* Missing PPE onsite
* Missing Safety/Road signs onsite, issue cleared with the procurement departement
*Copies of all inspection certificates should be present on site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


DAILY HSSE REPORT

TBL PROJECT

Weather Conditions :CLEAR Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
MOUNIR MRAD
12/20/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR ON
HSE SUPERVISOR ON
ACITIVITY SUPERVISOR ON
OPERATOR ON
OPERATOR ON
OPERATOR ON
WORKER ON
WORKER ON
WORKER ON
WORKER ON
OPERATOR ON
WORKER ON
WORKER ON
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC ON
QA/QC ON
LOGISTIQUE COORDINATOR ON
Driving
Qualification
Authorization
SUPERVISOR
TRANSPORTATION & JOURNEY MANAGEMENT
Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
19 557
152 4352
1 31
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.
ke sure that all the team proceed it in a safe manner.
HSSE LOWLIGHTS / HAZARDS and FINDINGS
BORS CLIMB ON THE TRUCK

LD

procurement departement
site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


12/20/2018

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Site HSE Induction & Orientation
NT
Kilometers
Field operation start to date
6000
5350
3850
0
0
0
15200

Field operations start to date


557
4352
31
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0
S
Area: KP31-38

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
RETEL Manpower AIMEN LAJDEL
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI
Name

AHMED GATTOUFI

ETAP Manpower
ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEM

Type

PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.
* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.
*All site workforce are wearing proper PPE
*Every work spot is under RETEL HSSE supervision
*Check machines and tools before use
HSSE LOWLIGHTS / HAZARDS and FINDING
* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK
* LACK OF ROLL BARS INSIDE PICK UPS
* LACK OF MEDICAL ASSISSTANCE IN THE FIELD
* Missing PPE onsite
* Missing Safety/Road signs onsite, issue cleared with the procurement departement
*Copies of all inspection certificates should be present on site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


DAILY HSSE REPORT

TBL PROJECT

Weather Conditions :CLEAR Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
MOUNIR MRAD
12/21/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR ON
HSE SUPERVISOR ON
ACITIVITY SUPERVISOR ON
OPERATOR ON
OPERATOR ON
OPERATOR ON
WORKER ON
WORKER ON
WORKER ON
WORKER ON
OPERATOR OFF
WORKER ON
WORKER ON
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC ON
QA/QC ON
LOGISTIQUE COORDINATOR ON
Driving
Qualification
Authorization
SUPERVISOR
TRANSPORTATION & JOURNEY MANAGEMENT
Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
18 575
144 4496
2 33
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.
ke sure that all the team proceed it in a safe manner.

HSSE LOWLIGHTS / HAZARDS and FINDINGS


BORS CLIMB ON THE TRUCK

LD

procurement departement
site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


12/21/2018

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Site HSE Induction & Orientation
NT
Kilometers
Field operation start to date
6250
5550
4050
0
0
0
15850

Field operations start to date


575
4496
33
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0

S
Area: KP38-45

Report Details
Project
RETEL Representative
CLIENT
CLIENT representative at site
Report date
Activity start date
Activity description
PTW Ref
P.O.B
Name
ABDENNACEUR NEJI
IBRAHIM ABIDI
ABDALLAH EL GHOMED
FETHI SAADAOUI
ABDELLATIF HEDHILI
LAZHAR RAGAM
HAITHEM ARDHAOUI
ANIS GHOMED
RETEL Manpower AIMEN LAJDEL
KARIM RHOUMA
ABDELNABI TOUJANI
NOUREDDINE ELGHOMED
AKRAM ELNAKAA
FERJENI GARRAB
WALID HARBAOUI
MOHAMED ZIDI
KHALED TALBI
AIMEN TAYEB
YASSINE HAMDI
Name

ANOIR CHAYEB
AHMED GATTOUFI

ETAP Manpower
ETAP Manpower

TRANSPORTATION & JOURNEY MANAGEM

Type

PICK UP MAZDA BT 50
PICK UP WOLKSWAGEN AMAROK
PICK UP MAZDA BT 50

HSSE KPIs

RETEL Personnel
Total field Working hours
TBT conducted
Fatalities (FAT)
LTIs
Lost Work Days
Date of the last LTI
Restricted Work Injury (RWI)
Restricted Work Days
Medical Treatment Case (MTC)
First Aid Case (FAC)
Incident
Near Miss
Hazards/Finding
HIPO
Management Walk Around
Total training hours
HSSE HIGHLIGHTS
* PTW, JSA,TBT, duely filled nd discussed with the whole team.
* Daily HSSE Monitoring of RETEL activities and make sure that all the team proceed it in a safe manner.
*All site workforce are wearing proper PPE
*Every work spot is under RETEL HSSE supervision
*Check machines and tools before use
HSSE LOWLIGHTS / HAZARDS and FINDING
* LACK OF LADDER IN ORDER TO LET THE LABORS CLIMB ON THE TRUCK
* LACK OF ROLL BARS INSIDE PICK UPS
* LACK OF MEDICAL ASSISSTANCE IN THE FIELD
* Missing PPE onsite, issue cleared with the procurement departement; Waiting for the delivery scheduled to be done on Fr
* Missing Safety/Road signs onsite, issue cleared with the procurement departement
*Copies of all inspection certificates should be present on site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


DAILY HSSE REPORT

TBL PROJECT

Weather Conditions :CLEAR Date:

Report Details
TBL PROJECT
FeridJLASSI
ETAP
ANOIR CHAYEB
12/22/2018
11/5/2018
Pipe Striniging 12'' & RoW Opening and Marking final & MANUAL WELDING 12'' & radiography test
REFER TO THE PTW REGISTER
P.O.B
Qualification ON / OFF
HSE SUPERVISOR ON
HSE SUPERVISOR ON
ACITIVITY SUPERVISOR ON
OPERATOR ON
OPERATOR ON
OPERATOR ON
WORKER ON
WORKER ON
WORKER ON
WORKER ON
OPERATOR OFF
WORKER ON
WORKER ON
WORKER ON
ACITIVITY SUPERVISOR ON
WORKER ON
QA/QC ON
QA/QC ON
LOGISTIQUE COORDINATOR ON
Driving
Qualification
Authorization
CONSTRUCTION SUPERINTENDENT YES
CONSTRUCTION SUPERVISOR YES
TRANSPORTATION & JOURNEY MANAGEMENT
Kilometers
Registration
Today
7681TN189 250
1355TN187 200
7684TN189 200

HSSE KPIs
Today Field operations start to date
18 593
180 4676
1 34
0 0
0 0
0 0
N/A N/A
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 3
0 0
HSSE HIGHLIGHTS
hole team.
ke sure that all the team proceed it in a safe manner.

HSSE LOWLIGHTS / HAZARDS and FINDINGS


BORS CLIMB ON THE TRUCK

LD
departement; Waiting for the delivery scheduled to be done on Friday 7th December 2018
procurement departement
site in order to present it to whom it may concerns
PICTURES

Other Concerns / Observations


12/22/2018

& MANUAL WELDING 12'' & radiography test

Site HSE Induction & Orientation


YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Site HSE Induction & Orientation

YES
YES
NT
Kilometers
Field operation start to date
6500
5750
4250
0
0
0
16500

Field operations start to date


593
4676
34
0
0
0
N/A
0
0
0
0
0
1
0
0
3
0

ay 7th December 2018

You might also like