TITLE OF WORK/PROJECT
TANK MODIFICATION
ERECTION OF SCAFFOLD
Industrial galvanized steel scaffold 13m high will be erected around the oil storage tanks 14m high
to access the top of the oil storage tank by competent scaffold erectors. Scaffold shall be
inspected and tagged after approval
Trades/Craft Men Safety personnel, skilled men (2 welders and 2fitters),2 riggers,
(List them)
Means of protection to 1. Alignment with PZ Wilmar Project team and Plant Operation Executives;
others(List them) 2. Liaison, adequate communication and arrangement with other project
contractor groups or person within close proximity to our operations or
that can be affected by our activities;
3. Work location to be condoned of
4. Appropriate signage to be displayed;
5. Adequate monitoring and Supervision;
Means of Access to
Height(List them) 1. Scaffold
*Subject to technical review for continuous improvement in situations requiring
special approach or presenting specific technical challenges.
Emergency Response PZ APAPA Clinic, Placement of the emergency response numbers on site In case of
Plan emergency:
Prior to entry and/or work on the pipe fabrication
1. The safety officer will ensure all workers understand likely causes of hot
work/fire outbreak/ emergency.
2. Karbak safety officer and Plant Safety Representatives will ensure that all the
rescue equipment are available to effect a rescue during hot work / fire
outbreak/lifting operation emergency.
3. Fire watch, fire extinguisher and fire blanket will be available and be inspected.
4. Karbak safety officer/ first aider will be available for immediate rescue of the
personnel
5. Karbak safety officer establishes communication with all workers.
The safety officer remains in constant communication with workers during lifting
operation.
The safety officer must be notified immediately if any personnel recognizes: -
unusual action/ behaviour - an unexpected hazard - an unsafe act or - detects a
condition prohibited by the permit.
If there is need for medical attention, affected personnel will be taken to Calvary
Hospital Ogba.
Method of Communication- Audible voice
1 Olumuyiwa Metajuwa
2 Aboluje Kayode
3 Ekundayo Omotola
4 Ajakaye Titus
Risk assessments should be reviewed at least annually, or after accidents, near misses and when significant changes in personnel
or work practices occur.
Location Activity
PZ, APAPA GENERAL, HOT AND HEIGHT WORK
Issue
Declaration
Project and safety officers should monitor and review the application of the specified controls.
Prepared by Date
Fawole Oluseyi 28/11/18
Signature Date
I certify that all controls are in place which reduce risk to as low as is reasonably practicable, all workers have
been informed and safe systems of work have been applied.
Action
Risk rating
Required
Low
For example, minor injury occurring infrequently to few staff. Not a priority, but
may need
attention to
prevent future
and long term
consequence