JUDE & L CONSTRUCTION, LLC.

Activity Hazard Analysis (AHA) P-985-SH-AHA-008.


Activity/Work Task: DEMOLISION WORKS
Risk Assessment Code (RAC) Rating Matrix
Project Location: NSA I – Bahrain
Contract Number: N33191-19-C-0805 Probability
Severity
Date Prepared: 20.10.2020 Frequent Likely Occasional Seldom Unlikely
Catastrophic E E H H M
Prepared by (Name/Title): PATRICK BIBILA N.
Critical E H H M L
Marginal H M M L L
Reviewed by (Name/Title):
Negligible M L L L L
Notes: (Field Notes, Review Comments, etc.) Step 1: Review each “Hazard” with identified safety “Controls” and
determine RAC rating (above).
“Probability” is the likelihood to cause an incident, near miss, or
RAC Rating
accident and identified as: Frequent, Likely, Occasional, Seldom or
E = Extremely High
Unlikely.
Risk
Severity” is the outcome/degree if an incident, near miss, or accident
H = High Risk
did occur and identified as: Catastrophic, Critical, Marginal, or
M = Moderate Risk
Negligible
L= Low Risk
Step 2: Identify the RAC (Probability/Severity) rating as E, H, M, or L
for each “Hazard” on AHA. Annotate the overall highest RAC at the
top of AHA.
Job Steps Hazards Controls RAC
 The Competent Person shall survey the integrity of the
 Collapse of Structure structure prior to the start of demolition operations.
 Collapse of a Portion of the  All required permits shall be obtained.
Structure  Locate, shut off, cap, or otherwise control all utilities.
 Water pipes, Cable Damage  Fire extinguishers shall be available on site and Emergency
 PREPARATORY OPERATIONS
 Fire Hazards
L
Services numbers shall be posted.
 Exposure of the Public to Falling  Dewater to avoid flood in any dug or excavated area
Debris  Work zone must be completely fenced in and of a sufficient
 Flood in excavated area distance away from sidewalks to remove any hazard to the
public.
 PERSONAL PROTECTIVE  Falling/Flying Debris  All workers on site shall wear hard hats.
EQUIPMENT  Dust Inhalation  A supply of dust masks shall be kept on hand to fill worker
 Eye Injuries requests.
 Cuts/Scrapes/Abrasions  All workers shall wear safety glasses.
 Struck By  Workers handling debris from the demolition will wear
 Caught Between work gloves.
 All workers on site shall wear approved, hi-visibility safety
vests, to make them visible to the equipment operators.
L
 DISMANTLING OF TANK  Structure Collapse  Proceed with demolition in a systematic manner.
STRUCTURE  Falling and flying Debris  Any worker signaling the operator shall always be in plain
 Pollution sight of the operator.
 Housekeeping  All workers shall remain at least 8-10 feet from the
 Fire equipment used to perform the demolition. Only workers
 Slips/Trips/Falls necessary to the operation shall be permitted in the work
zone during this operation.
 Barrels and caution tape will be used to demarcate the L
demolition zone.
 Debris removal will not begin until the removal can be
safely performed without exposure to structural collapse
or falling debris.
 Water will be sprayed to keep down the dust from the
demolition.
 Water will not be allowed to accumulate and cause a
hazardous condition.
 Concrete and masonry debris will be removed to a
separate container.
 Workers shall be instructed to possess heightened
awareness of their surroundings both during the
demolition and removal of debris
 SHORING  Cave ins  Test Equipment and Methods for Evaluating Soil Type
 material damage due collapse of (pocket penetrometer)
soil (existing pipes)  Implement suitable type of shoring to prevent soil from
collapsing.
L

1.Trench boxes (shielding) 2. Hydraulic shoring


Environmental consideration  Noise  Ensure noise level is less than 85 db, in case it is more
 Vibration than, provide suitable ear protection.
 Heat  Monitor heat and schedule work as per wbgt chart.
 Wind  Wind speed max for concrete pump operation wind
speed of 10m/s
Other reference:
29 CFR 1926.850-1926.860
Training Requirements/Competent or
Equipment to be Used Inspection Requirements
Qualified Personnel name(s)
 Jack Hammer Competent/Qualified Personnel required Inspection to include Equipment using check lists.
 First Aid Kit for the following: Inspection of excavated trench using check list by competent person.
 Dewater equipment  Demolition competent person Daily site safety inspections by SSHO.
 MINI excavator  Mini excavator operator
 SSHO