You are on page 1of 2

Document Reference

Saudi Constructioneers Ltd.


MC-SC-HSE-HIRA-028
Dated: 2023.02.12

OHSE Management System Page


1 of 2

HIRA
No.: HIRA - 028 RISK ASSESSMENT: Stacking of materials AREA / PROJECT: Mohammed Bin Salman City- Al Mishraq
THIS RISK ASSESSMENT MUST BE COMMUNICATED TO ALL EMPLOYEES INVOLVED IN THE ACTIVITY RECORD OF COMMUNICATION TO BE KEPT
TASK / OPERATION /
TOOLS & CLIENT: Mohammed Bin Salman City
ACTIVITY DESCRIPTION: Stacking of materials EQUIPMENT IN Trolley, pick up, various hand tools, plant and equipment
USE: IMPL. DATE: 2023.02.19
Risk Assessment Committee (To consist of OHS&E The purpose of this Risk Assessment is to identify all possible hazards and risks associated with the works
Manager, CM, Site Engineer and representative for CONSEQUENCE (C)
RISK RATING = and to identify mitigation and preventative control measures.
workforce)
LIKELIHOOD x
CONSEQUENCE
Name Signature 5 4 3 2 1

LIKELIHOOD OF EXPOSURE (L)


Alaa Ramadan 5 25 20 15 10 5

Ammar Al Ali 4 20 16 12 8 4

CJ Dempers 3 15 12 9 6 3

Rajesh Marath 2 10 8 6 4 2

1 5 4 3 2 1

Approved By Project
Signature
Manager/Coordinator

Omar Balkhi

LIKELIHOOD OF EXPOSURE CONSEQUENCE

5 CONTINUOUSLY (DAILY) 5 DISASTER MORE THAN ONE DEATH LOSS OR INJURY ≥ SR 100K

SR 50K ≤ LOSS OR INJURY


4 FREQUENTLY (WEEKLY) 4 VERY SERIOUS ONE FATALITY
< SR 100K

DISABILITY / PERMANENT SR 10K ≤ LOSS OR INJURY


3 FROM TIME TO TIME / REPEATEDLY (MONTHLY) 3 SERIOUS
INJURY < SR 50K

SR 1K ≤ LOSS OR INJURY <


2 SOMETIMES / OCCASIONAL (AT LEAST ANNUAL) 2 SIGNIFICANT INJURY WITH LOST TIME
SR 10K

MINOR INJURY WITHOUT


1 RARELY (LESS THAN ONCE PER YEAR) 1 MINIMAL LOSS OR INJURY < SR 1K
LOST TIME

1|Page
Document Reference
Saudi Constructioneers Ltd.
MC-SC-HSE-HIRA-028
Dated: 2023.02.12

OHSE Management System Page


2 of 2

WITHOUT CONTROLS RESIDUAL RISK

A B C A B C
TASK HAZARDS ASSOCIATED WHO CAN BE AFFECTED BY

RISK RATING

RISK RATING
Ser
(What one does in logical WITH EACH TASK THE RISKS (per hazard and HARM / CONSEQUENCE WITH CONTROLS

CONSEQUENCE

CONSEQUENCE
No.

LIKELIHOOD

LIKELIHOOD
RISK SCORE

RISK SCORE
steps) (What can cause harm?) risks identified) (What can happen /
go wrong?)

Saudico / Client / • Ensure all operatives are trained to perform the job.
Time delays and

High

Low
1. Planning. Untrained operatives. Supervision / Skilled & 4 4 16 • All competency certificates must be checked and recorded on site. 4 1 4
rework.
Unskilled Labour • Complete daily STARRT card for activity.
Saudico / Client / Property • Logistics manager to ensure that the location for placing material is
Stacking and storage of Material placed on

High

Low
2. Supervision / Skilled & damage/serious to 4 4 16 approved by the Mohammed Bin Salman City Project Manager and 4 1 4
material. uneven ground.
Unskilled Labour fatal injuries. that it is accordance with all site requirements
• Area of offloading to be barricaded, responsible supervisor to
ensure that only authorized employees enter the area for work.
• SC-SOP-OHSE-Inspection of Plant and Equipment-029 to be
Saudico / Client / Property
Load falling onto implemented and maintained at site.

High

Low
Supervision / Skilled & damage/serious to 4 4 16 4 1 4
employee. • SC-SOP-OHSE-Permit to Work System-091 to be implemented and
Unskilled Labour fatal injuries.
maintained at site.
• SC-SOP-OHSE-Manual Handling-070 to be implemented and
maintained at site.
Saudico / Client /
Stacking and storage Time delays/financial • Designation of stacking and storage areas to be as per the

High

Low
Supervision / Skilled & 4 4 16 2 2 4
area not demarcated. lose. approved site layout plan
Unskilled Labour
• Designation of stacking and storage areas to be as per the
Obstruction of Saudico / Client /
Time delays/financial approved site layout plan.

High

Low
walkways and Supervision / Skilled & 4 4 16 4 1 4
lose. • Ensure minimum 1.2m walkway for fire fighting access in around
roadways. Unskilled Labour
the material stacking area.
• Always keep work area clean and tidy.
• Ensure all balance materials are cleared from work place.
Stacking of material Saudico / Client / Property damage
• Ensure life lines are not crossing access and exits.

High

Low
causing slip, trip, or Supervision / Skilled & Time delays, serious 4 4 16 4 1 4
• All materials must be stacked properly away from access and
falling of employees. Unskilled Labour to fatal injuries.
edges.
• Ensure adequate illumination during night.
Std PPE: Hard Hat, Safety Glasses, High Vis Vest, Coverall, Steel-cap
Additional PPE: Solid barriers / fencing / tower lights/Hand protection
Safety Shoes.

2|Page