AL-HAMAD BLDG. CONT. COMPANY L.L.

C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 1 of 8 October 18, 2018
FORM/RA-15

Project Title :  SHARJAH AIRPORT EXPANSION PROGRAM Scope / Activity: Electric water heater

Project No.: AHJ – 587 Location: Project site

RA Reference AHC/RA/587/015 People: Workers, Foremen, Engineers, Public & Visitors

RA Date 20-01-2022 Equipment: Drilling machine, Tool Box, Water level/Sprit level

RA Revision No. 00 Production: -

SEVERITY RATING: MATRIX 

Health Safety Loss & Environmental Impact Probability

RATING OH&S Environmental   1 2 3

1-2 Low - L Slight injury (No lost time). First Aid Case. Slight Incident 1 1 2 3

3-4 Medium - M Moderate/ Minor injury / Illness Minor Incident Severity 2 2 4 6

Fatal / Permanent disability /Serious injury /


6-9 High - H Major Incident 3 3 6 9
illness
 
REVIEW DATE: _________________________    Unlikely Likely Very Likely
 
Assessed by: Verified by:

Name: Rana Taimoor Ahmad ( Safety Officer) Signature: ______________ Date 20-01-2022 Sr. Project Manager: Eng. Wasel Mouaz

Name: Eng. Amjad (Construction Manager) Signature: ______________ Date


Signature: ___________ Date

Distribution: Original to Site HSE File Cc: HSE Department ; Project File HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 2 of 8 October 18, 2018
FORM/RA-15

Residual
Identified Risk
Risk Responsible
No. Hazard /Aspect Risk / Impact at risk Rating Control Measures
Rating Person
(property, people) (LxS=RR)
(LxS=RR)
1 Not wearing personal Struck by falling object People 3x3=9 Employees to be inducted in the use of 1x1=1 Engineer
protective equipment. or debris, impact and PPE and its maintenance. Foreman,
collision, cuts, Worker.
punctures, chemical Engineer to ensure the adequate supply
burns, electric shocks, of PPE.
exposure to excessive
noise or vibration, eye Foreman to monitor the use of PPE.
injuries,
Campaigns and TBT to be conducted
frequently for the use and compliance of
PPE.

2 People 3x3=9 Workers to be inducted. 1x1=1 Foreman,


Manual handling and Strains and sprain,
Engineer,
shifting. neck and back injuries,
Load to be lifted according to workers worker
slip, falls, crush
injuries, cuts, bruises, capacity and one person shall not lift
chronic pain more than 25 kg alone.

Proper PPE to be worn e.g. hand gloves.

Area to be kept clear of any obstacles.

TBT on manual handling to be conducted.

Supervisor to ensure the compliance of


HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 3 of 8 October 18, 2018
FORM/RA-15

safe working procedures.

Route of carrying the load should be


identified, communicated and checked
for any hurdles

All information about the load such as


height, width, weight, shape needs to be
assessed prior lifting the load

One should not try to exceed his capacity


of lifting load.
Any person with a history of same sort of
incident due to some medical problem
should not be given the same task again.

Rest breaks to be given as per the labour


law and or upon individual requirement.

3 People. 3x3=9 All garbage or extra material shall be 1x1=1 Engineer,


House keeping Injuries due to slips,
removed immediately. Foreman,
trips and falls.
Worker.
Collected garbage shall be taken to the
waste collection area on site.

Hazardous and non-hazardous material


shall be segregated.

Unwanted materials shall be removed

HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 4 of 8 October 18, 2018
FORM/RA-15

from the site on regular basis.

4 Workers, 3x3=9 3rd party Trained scaffolders to be 1x3=3 Engineer,


Working at height. Fall of person or
foremen, appointed to erect the scaffolding. Foreman,
materials from height.
engineers Worker.
Safe access/ladders, working platforms,
toe boards, guard rails, and bracing must
be provided.

Scaffolding inspection tags to be used


mentioning the status of scaffolding by a
competent 3rd party trained scaffolding
inspector.

Full body harness to be worn and


anchored at all times.

All tools to be kept secured to prevent fall


from height and taglines shall be fixed
with the tools

Barricade the beneath area.

No alteration shall be done without


permission.

TBT to be conducted for safe working at


HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 5 of 8 October 18, 2018
FORM/RA-15

height and Foreman to monitor activity at


all times.
5 People. 3x3=9 All electrical DBs, tools, connections and 1x3=3 Engineer,
Electricity Fire, burns & electric
cables etc. should be inspected weekly by Foreman,
shock
the competent person. Worker.

TBT to be conducted for safe work.

Trained and competent worker carry out


the activities.

Use of standard and proper type of cables


hang the cable other than laying on
floors.

Avoid passing through or near water, oil,


flammable gases.

Buried cables must be identified with


signs, make cover for the open cables.

Use of appropriate rated electrical


devices like Breakers, ELCB, RCD and
MCCB etc.

Use of standard type of sockets, proper


cables used with proper cable
termination Use splash proof sockets and
kept in safe place.

HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 6 of 8 October 18, 2018
FORM/RA-15

6 People 3x3=9 Ensure the good quality of tools without 1x1=1 Engineer,
Hand tools and power Injury to all parts of
any damage. Foreman,
tools the body, Electrical
shock Worker.
Appropriate PPEs (hand gloves, dust
mask, goggles) to be used while using
hand tools and power tools.

Inspect the condition of the hand tools


and power tools prior to use.

Monthly inspection by a competent


person of all hand tools and power tools
to be done and records to be maintained.

Damaged hand tools and power tools


should be immediately removed and
replaced with the good one.

7 Health hazard People 3x3=9 Adequate information to be given to all 3x1=3 All personnel
COVID-19 (Corona
( respiratory illness the employees through emails, display
virus) General work
cause by covid-19 posters, notices etc.
place hazard
infection that may
lead to fatality All receiving material to be kept isolated
for certain hours as per specification of
material to reduce the risk of contact and
impact of virus and disease.

In site store area a separate isolated area


will be provided cleaning and disinfection
operation will be done to receiving
material at site.
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 7 of 8 October 18, 2018
FORM/RA-15

To limit closer contact avoid shaking


hands and hugging etc

Handshaking, high five or first bump


should be strictly avoided in office and
site

All visitors to submit a self-declaration


and proof of being vaccinated at site.

Infection symptoms, travel history,


purpose of visit etc to be revealed.

Employees to be encouraged to report


any changes with their health condition
like headache, breathing difficulties,
fever, cough or tiredness.

Employees health monitoring is


mandatory prior to send them to work.

Hygiene practices must be followed like


washing of hands frequently, use of hand
sanitizers, cough or sneeze in tissues and
discard use tissue, avoid touching eyes,
nose or mouth.

8 Emergency. Health effect, injury Workers, 3x3=9 Safety department to be informed 1x1=1 Engineer,
foremen, immediately in case of any Foreman
engineers emergency/accident.
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 8 of 8 October 18, 2018
FORM/RA-15

Affected person will be brought to the


site clinic where the site nurse will
attend.

Ambulance shall be called if required.