AL-HAMAD BLDG. CONT. COMPANY L.L.

C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 1 of 11 October 18, 2018
FORM/RA-15

Project Title :  SHARJAH AIRPORT EXPANSION PROGRAM Scope / Activity: Block works

Project No.: AHJ – 587 Location: Project site

RA Reference AHC/RA/587/006 People: Workers, Foremen, Engineers, Public & Visitors

RA Date 13-12-2021 Equipment: -

RA Revision No. 01 Production: -

SEVERITY RATING: MATRIX 

Health Safety Loss & Environmental Impact Probability

RATING OH&S Environmental   1 2 3

1-2 Low - L Slight injury (No lost time). First Aid Case. Slight Incident 1 1 2 3

3-4 Medium - M Moderate/ Minor injury / Illness Minor Incident Severity 2 2 4 6

Fatal / Permanent disability /Serious injury /


6-9 High - H Major Incident 3 3 6 9
illness
 
REVIEW DATE: _________________________    Unlikely Likely Very Likely
 
Assessed by: Verified by:

Name: Rana Taimoor Ahmad ( Safety Officer) Signature: ______________ Date 13-12-2021 Sr. Project Manager: Eng. Wasel Mouaz

Name: Eng. Amjad (Construction Manager) Signature: ______________ Date


Signature: ___________ Date

Distribution: Original to Site HSE File Cc: HSE Department ; Project File HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 2 of 11 October 18, 2018
FORM/RA-15

Residual
Identified Risk
Risk Responsible
No. Hazard /Aspect Risk / Impact at risk Rating Control Measures
Rating Person
(property, people) (LxS=RR)
(LxS=RR)
1 Not wearing personal Injury to all parts of People 3x3=9 Employees to be inducted in the use of 1x1=1 Engineer
protective equipment. the body. PPE and its maintenance. Foreman,
Worker.
Engineer to ensure the adequate supply
of PPE.

Foreman to monitor the use of PPE.

Campaigns and TBT to be conducted


frequently for the use and compliance of
PPE.

2 People 3x3=9 Workers to be inducted. 1x1=1 Foreman,


Manual handling and Injury to employees.
Engineer,
shifting.
Load to be lifted according to workers worker
capacity and one person shall not lift
more than 25 kg alone.

Proper PPE to be worn e.g. hand gloves.

Area to be kept clear of any obstacles.

TBT on manual handling to be conducted.

Supervisor to ensure the compliance of


HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 3 of 11 October 18, 2018
FORM/RA-15

safe working procedures.

Route of carrying the load should be


identified, communicated and checked
for any hurdles

All information about the load such as


height, width, weight, shape needs to be
assessed prior lifting the load

One should not try to exceed his capacity


of lifting load.
Any person with a history of same sort of
incident due to some medical problem
should not be given the same task again.

Rest breaks to be given as per the labour


law and or upon individual requirement.

3 People 3x3=9 Operator to be inducted prior 1x1=1 Engineer,


Use of Hiab to unload Injury to employees.
material at site Damage to property commencing to work. Foreman,
Worker.
Lifting permit to be obtained from HSE
dept. by concern engineer prior starting
activity.

3rd party inspection certificate of Hiab


truck to be obtained.
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 4 of 11 October 18, 2018
FORM/RA-15

3rd party training certificate of operator


to be checked.

3rd party trained banksmen and rigger to


be appointed to carry out the job.

Use guide ropes to guide the loads.

Wind speed chart to be followed and

Work should be stopped during high


winds and wind gusts.

Operator to know capacities of Hiab and


never to exceed.

Foreman to supervise positioning of


machine

Barricade the surrounding.

Keep clear the lifting zone from


unauthorized personnel Deploy
additional watchman.

HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 5 of 11 October 18, 2018
FORM/RA-15

4 People. 3x3=9 All garbage or extra material shall be 1x1=1 Engineer,


House keeping Injuries due to slips,
removed immediately. Foreman,
trips and falls.
Worker.
Collected garbage shall be taken to the
waste collection area on site.

Hazardous and non hazardous material


shall be segregated.

Unwanted materials shall be removed


from the site on regular basis.

5 Workers, 3x2=6 Ensure the use of task related and 1x1=1 Engineer,
Fixing blocks Health effect, Injury to
foremen, mandatory PPE. Foreman,
all parts of the body.
engineers Worker.
Load to be lifted according to workers
capacity and one person shall not lift
more than 25 kg alone.

Tool box talk to be conducted.

No direct contact shall be made with


mortar.

Mortar shall be mixed in buckets.

Full time supervision to be carried out.


HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 6 of 11 October 18, 2018
FORM/RA-15

6 Workers, 3x3=9 3rd party Trained scaffolders to be 1x3=3 Engineer,


Working at height. Fall of person or
foremen, appointed to erect the scaffolding. Foreman,
materials from height.
engineers Worker.
Safe access/ladders, working platforms,
toe boards, guard rails, and bracing must
be provided.

Scaffolding inspection tags to be used


mentioning the status of scaffolding by a
competent 3rd party trained scaffolding
inspector.

Full body harness to be worn and


anchored at all times.

All tools to be kept secured to prevent fall


from height and taglines shall be fixed
with the tools

Barricade the beneath area.

No alteration shall be done without


permission.

TBT to be conducted for safe working at


height and Foreman to monitor activity at
all times.

HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 7 of 11 October 18, 2018
FORM/RA-15

7 People. 3x3=9 All electrical DBs, tools, connections and 1x3=3 Engineer,
Electricity Fire, burns & electric
cables etc. should be inspected weekly by Foreman,
shock
the competent person. Worker.

TBT to be conducted for safe work.

Trained and competent worker carry out


the activities.

Use of standard and proper type of cables


hang the cable other than laying on
floors.

Avoid passing through or near water, oil,


flammable gases.

Buried cables must be identified with


signs, make cover for the open cables.
Workers should be trained for the use of
electrical equipment.

Use of appropriate rated electrical


devices like Breakers, ELCB, RCD and
MCCB etc.

Use of standard type of sockets, proper


cables used with proper cable
termination Use splash proof sockets and
kept in safe place.

8 Workers, 3x3=9 3rd party inspection to be conducted for 3x1=3 Engineer,


Use of concrete mixer Injury to all parts of
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 8 of 11 October 18, 2018
FORM/RA-15

foremen, concrete mixer and fitness certificate to Foreman,


the body, Electrical
engineers be obtain. Worker.
shock

Ensure that the mixer is set on stable


level ground and wheels are braced.

Check that all machine guards are in


place.

Ensure that hands and arms are kept out


of the mixer all the time.

Turn mixer of before servicing, adjusting,


installing attachment.

Never leave a running mixer unattended.

Foreman to ensure mixer is not


overloaded at any time.

Foreman to ensure the use of task related


and mandatory PPE

Wind direction to be checked to avoid


dust blowing onto person.

TBT to be conducted explaining the safe

HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 9 of 11 October 18, 2018
FORM/RA-15

working procedures.

Foreman to monitor activity at all times.

9 People 3x3=9 Ensure the use of proper industrial plugs 1x1=1 Engineer,
Use of Power & Hand Injury to all parts of
and good quality cables without any Foreman,
tools the body, Electrical
damage. Worker.
shock
Appropriate PPEs (hand gloves, dust
mask, goggles, ear plug) to be used while
using power & hand tools.

Electrical tools should be provided with


ELCB.

Inspect the condition of the hand tools


and power tools prior to use.

Monthly inspection by a competent


person of all power hand tools to be done
and records to be maintained.

Damaged power hand tools should be


immediately removed and replaced with
the good one.

10 People 3x3=9 Personal Protective Equipment such as 1x1=1 Engineer,


Dust inhalation Health injuries
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 10 of 11 October 18, 2018
FORM/RA-15

dust mask and safety goggles should be Foreman,


provided. Worker.

Ensure that trained and competent


personnel will do the task.

TBT to be conducted explaining the


health effect due to dust inhalation.

11 Workers, 3x3=9 Employees to be inducted in the use of 1x1=1 Engineer,


Exposure to cement Health effect, injury
foremen PPE s. Foreman,
products
Worker.
Supervisor to ensure that no direct
contact is made at any time.

Supervisor to keep unauthorised people


away from working area at all times.

After work creams to be used.

COSHH assessment to be done.

TBT Conducted for safe work.

12 Emergency. Health effect, injury Workers, 3x3=9 Safety department to be informed 1x1=1 Engineer,

HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 11 of 11 October 18, 2018
FORM/RA-15

foremen, immediately in case of any Foreman


engineers emergency/accident.

Affected person will be brought to the


site clinic where the site nurse will
attend.

Ambulance shall be called if required.

HCC/HSE-FORM/RA-15