HCC/HSE- RISK ASSESSMENT
03 Page 1 of 11 October 18, 2018
FORM/RA-15
Project Title : SHARJAH AIRPORT EXPANSION PROGRAM Scope / Activity: Block works
1-2 Low - L Slight injury (No lost time). First Aid Case. Slight Incident 1 1 2 3
Name: Rana Taimoor Ahmad ( Safety Officer) Signature: ______________ Date 13-12-2021 Sr. Project Manager: Eng. Wasel Mouaz
Distribution: Original to Site HSE File Cc: HSE Department ; Project File HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 2 of 11 October 18, 2018
FORM/RA-15
Residual
Identified Risk
Risk Responsible
No. Hazard /Aspect Risk / Impact at risk Rating Control Measures
Rating Person
(property, people) (LxS=RR)
(LxS=RR)
1 Not wearing personal Injury to all parts of People 3x3=9 Employees to be inducted in the use of 1x1=1 Engineer
protective equipment. the body. PPE and its maintenance. Foreman,
Worker.
Engineer to ensure the adequate supply
of PPE.
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 5 of 11 October 18, 2018
FORM/RA-15
5 Workers, 3x2=6 Ensure the use of task related and 1x1=1 Engineer,
Fixing blocks Health effect, Injury to
foremen, mandatory PPE. Foreman,
all parts of the body.
engineers Worker.
Load to be lifted according to workers
capacity and one person shall not lift
more than 25 kg alone.
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 7 of 11 October 18, 2018
FORM/RA-15
7 People. 3x3=9 All electrical DBs, tools, connections and 1x3=3 Engineer,
Electricity Fire, burns & electric
cables etc. should be inspected weekly by Foreman,
shock
the competent person. Worker.
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 9 of 11 October 18, 2018
FORM/RA-15
working procedures.
9 People 3x3=9 Ensure the use of proper industrial plugs 1x1=1 Engineer,
Use of Power & Hand Injury to all parts of
and good quality cables without any Foreman,
tools the body, Electrical
damage. Worker.
shock
Appropriate PPEs (hand gloves, dust
mask, goggles, ear plug) to be used while
using power & hand tools.
12 Emergency. Health effect, injury Workers, 3x3=9 Safety department to be informed 1x1=1 Engineer,
HCC/HSE-FORM/RA-15
AL-HAMAD BLDG. CONT. COMPANY L.L.C
SHARJAH - UAE
INTERNAL FIT-OUT OF NEW SIA PURCHASING AND
ENGINEERING BUILDING, CONSTRUCTION OF RELATED
ANCILLARY BUILDINGS AND ASSOCIATED WORKS Project
SHARJAH – UAE
AHJ-587
Document No. Revision No. Page Format Revision Date
HCC/HSE- RISK ASSESSMENT
03 Page 11 of 11 October 18, 2018
FORM/RA-15
HCC/HSE-FORM/RA-15